MINS is a very huge and lengthy project to design and launch for single man and to work on it respectively. So phases are divided and some teams are set up to make this project a grand success.
The MINS project is divided into 2 Phases listed below
Phase 1A: The Scope of Phase 1A is to demonstrate a successful Intra MINS and Inter MINS call along with CDR generation. Handoff functionality will not be supported in this phase of MINS.
Phase 1: Phase 1 will be focused on interfaces towards Billing and Mediation, NMS, Legal Interception System, and PSTN World. This phase will also have capability to interact with the prepaid system. Along with this all the bugs observed in Phase 1A will be fixed in Phase 1.
At the end of Phase 1, it will be possible to make inter MINS calls, Intra MINS Calls, Calls to PSTN world, Call to Existing Reliance Wireless Network and Send SMS on the MINS network. Also the Handoff and announcement functionality shall be supported in this Phase.
The Load test as per the Specifications will be carried out after successful demonstration of all the services and integration with the network elements present in the Reliance network.
It will include PCF functionality and integration with data network (R world), OTAF (Over The Air Functionality) and VMS (Voice Mail System). Also all the supplementary services development will be taken up in this phase.
REQUIREMENT OF THESE PHASES
• • Phase 1A Requirement— Feature or function that shall be supported by the system to be delivered in in the phase 1A.These are mandatory for the Intra MINS and Inter MINS call establishment. All Phase 1A requirements are flagged by the letter “PH 1A.”
• • Phase 1 Requirement— Feature or function that shall be supported by the system to be delivered in the phase 1.These are mandatory for supporting Prepaid functionality, SMS functionality and calls terminating on /from PSTN or GSM network as well as to offer Supplementary services. All Phase 1 requirements are flagged by the letter “PH 1.”
• • Phase 2 Requirement— Feature or function that shall be supported by the system to be delivered in the phase 2.All Phase 2 requirement are flagged by the letter “PH 2.”
The MINS project is divided into 2 Phases listed below
Phase 1A: The Scope of Phase 1A is to demonstrate a successful Intra MINS and Inter MINS call along with CDR generation. Handoff functionality will not be supported in this phase of MINS.
Phase 1: Phase 1 will be focused on interfaces towards Billing and Mediation, NMS, Legal Interception System, and PSTN World. This phase will also have capability to interact with the prepaid system. Along with this all the bugs observed in Phase 1A will be fixed in Phase 1.
At the end of Phase 1, it will be possible to make inter MINS calls, Intra MINS Calls, Calls to PSTN world, Call to Existing Reliance Wireless Network and Send SMS on the MINS network. Also the Handoff and announcement functionality shall be supported in this Phase.
The Load test as per the Specifications will be carried out after successful demonstration of all the services and integration with the network elements present in the Reliance network.
It will include PCF functionality and integration with data network (R world), OTAF (Over The Air Functionality) and VMS (Voice Mail System). Also all the supplementary services development will be taken up in this phase.
REQUIREMENT OF THESE PHASES
• • Phase 1A Requirement— Feature or function that shall be supported by the system to be delivered in in the phase 1A.These are mandatory for the Intra MINS and Inter MINS call establishment. All Phase 1A requirements are flagged by the letter “PH 1A.”
• • Phase 1 Requirement— Feature or function that shall be supported by the system to be delivered in the phase 1.These are mandatory for supporting Prepaid functionality, SMS functionality and calls terminating on /from PSTN or GSM network as well as to offer Supplementary services. All Phase 1 requirements are flagged by the letter “PH 1.”
• • Phase 2 Requirement— Feature or function that shall be supported by the system to be delivered in the phase 2.All Phase 2 requirement are flagged by the letter “PH 2.”