abhishreshthaa
Abhijeet S
The project manager Mr. Praveen singhal had allotted me a computer on which we study or understand the theoretical knowledge of the MINS project using the SRS_MINS document (Software requirement document_ MINS) in our half time.
After having my lunch when I came back to office then they allot me a laptop which connected to one of the subsystem of the network like BSC, BTS etc.
I have to submit a report at 6:00 p.m. every evening what we have concluded while we are testing the project.
After we put the project (MINS system) we put to a tester which they named as load test.
What we do whole day manually, is known as manual test and then when we put it to a tester is known as load test.
The flow of messages which we get in the load test can be seen in the logs of the BTS and BSC subsystem. That was work of the employees or I can say the work of my seniors or my teachers there.
When we left from there a viva voce was conducted by the project manager and we submitted the project report to them.
After having my lunch when I came back to office then they allot me a laptop which connected to one of the subsystem of the network like BSC, BTS etc.
I have to submit a report at 6:00 p.m. every evening what we have concluded while we are testing the project.
After we put the project (MINS system) we put to a tester which they named as load test.
What we do whole day manually, is known as manual test and then when we put it to a tester is known as load test.
The flow of messages which we get in the load test can be seen in the logs of the BTS and BSC subsystem. That was work of the employees or I can say the work of my seniors or my teachers there.
When we left from there a viva voce was conducted by the project manager and we submitted the project report to them.