abhishreshthaa
Abhijeet S
1. DMAIC: Define, Measure, Analyze, Improve and Control:
In this method Six sigma projects go through four phases:
The number of 'x' s go on getting eliminated using various statistical and other tools.
This is as if the variation is getting reduced as it passes through a funnel of the six-sigma methodology. This is sometimes called the breakthrough strategy.
The cause and effects relationship between the KPOVs ('y's) and KPIVs ('x's) gets clearer as the project goes through the four phases. Control plans are documented before the closure of the project so that gains are sustained.
The project leaders must demonstrate that the key deliverables of the project are achieved and demonstrated.
In this method Six sigma projects go through four phases:
The number of 'x' s go on getting eliminated using various statistical and other tools.
This is as if the variation is getting reduced as it passes through a funnel of the six-sigma methodology. This is sometimes called the breakthrough strategy.
The cause and effects relationship between the KPOVs ('y's) and KPIVs ('x's) gets clearer as the project goes through the four phases. Control plans are documented before the closure of the project so that gains are sustained.
The project leaders must demonstrate that the key deliverables of the project are achieved and demonstrated.