System Analysis

abhishreshthaa

Abhijeet S
System Analysis in Production Management:


Feasibility Study :-


  • Feasibility study is undertaken to determine the possibility of either improving the existing system or developing complete new system.

  • There are three aspects of feasibility study


Technical Feasibility.

Economic Feasibility.

Operational Feasibility.



Tools:

  • Visual Basic 6.0 (Front End)

  • SQL Server 7.0 (Back End)

  • Crystal Report 9.0 (Reports)


Current Status


High-level overview of progress against schedule


On-track in what areas


Behind in what areas


Ahead in what areas


Unexpected delays or issues

Why SQL server ?

  • Maximum Database size roughly 1,000,000 terabyte so we can store 100mb each about every man , woman,child on the planet in a single SQL serve.

  • Up to 16 simultaneous instances of SQL server can run on single computer.

  • Example : So it helpful when we trying to run complex internet site.


  • Support up to 32 processors in single instance



Why Visual Basic ?

  • More advance tool

  • Use minimum configration

  • Provide easy connectiviti with any backend tool

  • Provide web application with HTML forms and controls

  • Provide online help for any problem

  • Loading time is low

  • Use less Resources when running

Why Crystal Report ?

  • Easy to connect database

  • Easy to retrieve data

  • Easy to build Report

  • It helps to produced Sort,filter,summarize and format information

  • Report can save in verity of formates.

  • Example : RPT format,Word & Excel format, HTML format
 
System Analysis in Production Management:


Feasibility Study :-


  • Feasibility study is undertaken to determine the possibility of either improving the existing system or developing complete new system.

  • There are three aspects of feasibility study


Technical Feasibility.

Economic Feasibility.

Operational Feasibility.



Tools:

  • Visual Basic 6.0 (Front End)

  • SQL Server 7.0 (Back End)

  • Crystal Report 9.0 (Reports)


Current Status


High-level overview of progress against schedule


On-track in what areas


Behind in what areas


Ahead in what areas


Unexpected delays or issues

Why SQL server ?

  • Maximum Database size roughly 1,000,000 terabyte so we can store 100mb each about every man , woman,child on the planet in a single SQL serve.

  • Up to 16 simultaneous instances of SQL server can run on single computer.

  • Example : So it helpful when we trying to run complex internet site.


  • Support up to 32 processors in single instance



Why Visual Basic ?

  • More advance tool

  • Use minimum configration

  • Provide easy connectiviti with any backend tool

  • Provide web application with HTML forms and controls

  • Provide online help for any problem

  • Loading time is low

  • Use less Resources when running

Why Crystal Report ?

  • Easy to connect database

  • Easy to retrieve data

  • Easy to build Report

  • It helps to produced Sort,filter,summarize and format information

  • Report can save in verity of formates.

  • Example : RPT format,Word & Excel format, HTML format

Hello abhi,

Here i am uploading Production and Operation Management Prepared by Dr. Sarojrani Pattnaik and Dr. Swagatika Mishra, so please download and check it.
 

Attachments

Systems Analysis is the act, process, or profession of studying an activity (such as a procedure, a business, or a physiological function) typically by mathematical means in order to define its goals or purposes and to discover operations and procedures for accomplishing them most efficiently.
 