Name ARUNKUMAR D
Roll Number 1311003523
Name of program MBA
Session Fall
Year 2015
Semester Semester IV
Specialisation OM0014-201508-DE
Title of the project Study on Plant layout design depending on type of production system at
CIPET- Bhopal
Objectives of the project 1.To develop the detailed layout of the plant that should plan and position
employees, materials, machines, equipments, and other manufacturing
supports and facilities to create the most effective plant layout. 2.To maintain
the FIFO 3.Easily understandable for the workers and outsiders to follow the
layout 4.To enhance the production rate
Problem Statement The problems facing is the comfortable production was not able to achieving
by the means of material, operator and packing problems. It should be
clearly maintained for the proper Production rate. 1. Material feeder line
should be designed accordingly without disturbing machines and cranes. 2.
Machine gaping between each other 3. Material boxes place 4.operator
standing area 5.Packing area
Methodology to be used The ability to design and operate manufacturing facilities that can quickly and
effectively adapt to changing technological and market requirements is
becoming increasingly important to the success of any manufacturing
organization. This action could be conducted under existing resources such
as employees, machines and other facilities. However, plant layout
improvement, could be one of the tools to response to increasing industrial
productivity. Plant layout design has become a fundamental basis of today’s
industrial plants which can influence parts of work efficiency. It is needed to
appropriately plan and position employees, materials, machines,
equipments, and other manufacturing supports and facilities to create the
most effective plant layout.
SUBMISSION OF PROJECT SYNOPSIS & GUIDE ACCEPTANCE FORM
(To be submitted to the project steering comittee)
PART A: Synopsis Registration
I. Student Details
II. Project Synopsis Details
III. Guide Details
Name of the Guide ATUL DUBEY
Date of Birth 0000-00-00
Primary Contact Number +919827205534
Primary Email Id [email protected]
Total Experience 12
Country India
Name of the PG
Area of
Specialisation
Year of
passing
Institution/University
Has the guide
completed the
PG with 55% and
above
Master of Business
Administration (MBA)
N
Does the guide has more than
two years of Experience
Y
I Dr./Mr./Mrs/Ms. ATUL DUBEY hereby confirm my willingness to guide Mr./ Ms. ARUNKUMAR D RollNo.
1311003523 attached to Learning Centre (code) 01650 , EDUCATIONAL SOCIETY OF PROFESSIONALS, whose
Project Title is Study on Plant layout design depending on type of production system at CIPET- Bhopal during
the Fall session of 2015 (year). I agree to submit the project status/ Internal Assessment marks to the
University.
(Signature of the Guide)
I hereby declare that this project synopsis is an original work carried by me and will
not be submitted to any other University for fulfillment of any course of study.
Place
Date
(Signature of the Student)
doc_554279837.pdf
Roll Number 1311003523
Name of program MBA
Session Fall
Year 2015
Semester Semester IV
Specialisation OM0014-201508-DE
Title of the project Study on Plant layout design depending on type of production system at
CIPET- Bhopal
Objectives of the project 1.To develop the detailed layout of the plant that should plan and position
employees, materials, machines, equipments, and other manufacturing
supports and facilities to create the most effective plant layout. 2.To maintain
the FIFO 3.Easily understandable for the workers and outsiders to follow the
layout 4.To enhance the production rate
Problem Statement The problems facing is the comfortable production was not able to achieving
by the means of material, operator and packing problems. It should be
clearly maintained for the proper Production rate. 1. Material feeder line
should be designed accordingly without disturbing machines and cranes. 2.
Machine gaping between each other 3. Material boxes place 4.operator
standing area 5.Packing area
Methodology to be used The ability to design and operate manufacturing facilities that can quickly and
effectively adapt to changing technological and market requirements is
becoming increasingly important to the success of any manufacturing
organization. This action could be conducted under existing resources such
as employees, machines and other facilities. However, plant layout
improvement, could be one of the tools to response to increasing industrial
productivity. Plant layout design has become a fundamental basis of today’s
industrial plants which can influence parts of work efficiency. It is needed to
appropriately plan and position employees, materials, machines,
equipments, and other manufacturing supports and facilities to create the
most effective plant layout.
SUBMISSION OF PROJECT SYNOPSIS & GUIDE ACCEPTANCE FORM
(To be submitted to the project steering comittee)
PART A: Synopsis Registration
I. Student Details
II. Project Synopsis Details
III. Guide Details
Name of the Guide ATUL DUBEY
Date of Birth 0000-00-00
Primary Contact Number +919827205534
Primary Email Id [email protected]
Total Experience 12
Country India
Name of the PG
Area of
Specialisation
Year of
passing
Institution/University
Has the guide
completed the
PG with 55% and
above
Master of Business
Administration (MBA)
N
Does the guide has more than
two years of Experience
Y
I Dr./Mr./Mrs/Ms. ATUL DUBEY hereby confirm my willingness to guide Mr./ Ms. ARUNKUMAR D RollNo.
1311003523 attached to Learning Centre (code) 01650 , EDUCATIONAL SOCIETY OF PROFESSIONALS, whose
Project Title is Study on Plant layout design depending on type of production system at CIPET- Bhopal during
the Fall session of 2015 (year). I agree to submit the project status/ Internal Assessment marks to the
University.
(Signature of the Guide)
I hereby declare that this project synopsis is an original work carried by me and will
not be submitted to any other University for fulfillment of any course of study.
Place
Date
(Signature of the Student)
doc_554279837.pdf