This Excel Template will List all the duties required to be performed when you start a Mineral Water Plant or Packaged Drinking Plant.
This is NOT prepared by any institute , but by an entrepreneur himself. This lists down all the exact steps needed right from placing the order to the final date of starting a plant.
Please feel free to download the template. If need any help, please write back to [email protected]
You can have all the other documents & also a sample project report for free download at site :-http://mineralwaterprojectinformation.org
JOY WEB SERVICES , PUNE
INDIA -
10/4/2013 Total pages -2
JOY WEB SERVICES PVT LTD ,PUNE , INDIA [Replace with your company name here] PROJECT EXECUTION PLAN FOR PACKAGED DRINKING PLANT IN INDIA
Task Funds No Arrangement Enter daywise money requirement here 1 2 50% 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Work - details
Water Treatment Plant & Filling Machinery
Responsibility
Day
Document Work for Hire greement
Order finalised with TURNKEY Supplier token To get final Pre-Order Proforma from SupplierEqupt Supplr To issue Purchase Oder and advance Plant Owner To Get Order Acceptance with Layout Equpt Supplr Send Water Sample for testing Plant Owner Get Water Report from Lab Plant Owner Call Qtn For other items than equipment Plant Owner Finalise & Issue Order with Advance to Suppliers Plant Owner Interim Follow Up 1 Plant Owner Interim Follow Up 2 Plant Owner Interim Follow Up 3 Plant Owner Equpt Supplr Inspection with Supplier Get Proforma for equipments Equpt Supplr Plant Owner 40% 40% Payment to Suppliers Despatch for all machinery from suppliers Equpt Supplr Site Visit 1(Civil,Interior,Power, Electrical, Water) Equpt Supplr Site Visit 2(Site Shd be ready) Equpt Supplr Start Installation & Send Proforma for 10% Balance Equpt Payment Supplr End Installation Equpt Supplr Start Erection & Piping Equpt Supplr End Erection & Piping Equpt Supplr Start Comissioning Equpt Supplr End Comissioning Equpt Supplr Finalise Bottle Design Plant Owner Ordering Mould Plant Owner
0 2 7 14 7 14 9 12 19 26 33 45 42 45 46 25 40 50 54 55 56 57 58 15 17
Minutes of Meeting & Consent Letter Pre-Order Proforma with Taxes Estimate Purchase Order / Pre-Order Proforma with Sign Order acceptance , Place Dimensions See the sample report here Std Format of Lab List of Items Supplier's Final Qtn , Purchase Order
Inspection Report
Supplier Invoices , Packing List Visit Report Visit Report Plant Owner's site ready consent
Installation, Erection , Comissioning Report Proof - approved , original design
JOY WEB SERVICES , PUNE
INDIA -
10/4/2013 Total pages -2
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
Mould Trial & Despatch Plant Owner 27 Inspection Report Finalise Bottle & Cap Supplier Plant Owner 15 Trials @ Bottle Supplier Plant Owner 30 Inspection Report Bottles & Caps (2000) ready at factory Plant Owner 35 Finalise Label Design Plant Owner 15 Proof - approved , original design Finalise Label Supplier Plant Owner 15 Blank Labels Trial & Despatch Plant Owner 35 Inspection Report Blank Labels (2000) ready at factory Plant Owner 40 Finalise Pouch Design , Advance to FFS Mfr Plant Owner 15 Finalise Pouch Mtl Supplier Plant Owner 15 Proof - approved , original design Blank Pouches Trial on FFS m/c Plant Owner 35 Supplier's Final Qtn , Purchase Order Blank Pouch Mtl (5000) ready at factory Plant Owner 40 FFS M/c despatch from Supplier Equpt Supplr 40 Supplier Invoices , Packing List Water Treatment , Filling M/c Handover Equpt Supplr 60 Handover Report & OK report by User Final 10 % Payment Plant Owner 60 Handover Report & OK report by User Lab & BIS Planning BIS Cons Fee Advance Plant Owner 10 Agreement / Contract Copy Sampling , testing 1 st stage BIS Consultant 40 Lab Advance Plant Owner 30 Supplier's Final Qtn , Purchase Order File Preparation Lab Supplr 30 Lab Inspection & Despatch Lab Supplr 40 File Submission BIS Consultant 75 BIS visit BIS Consultant 90 BIS Fee Plant Owner 92 BIS Cons Fee + License Plant Owner 92 BIS License Copy Preventive Service Calls Equpt Supplr Every 90 th day from Handover : 3 Visits Civil Work , Electrical & Water Piping should be complete before installation - 45 th day from Zero Date.
Disclaimer The information published is just a suggestion. Though very very effective , the user is advised to modify wherever needed, as every project is different in nature and need respective alterations / modifications. Hence We won't be held responsible in case some complications arrive out of using this planning chart as a tool.
doc_637636852.xlsx
This Excel Template will List all the duties required to be performed when you start a Mineral Water Plant or Packaged Drinking Plant.
This is NOT prepared by any institute , but by an entrepreneur himself. This lists down all the exact steps needed right from placing the order to the final date of starting a plant.
Please feel free to download the template. If need any help, please write back to [email protected]
You can have all the other documents & also a sample project report for free download at site :-http://mineralwaterprojectinformation.org
JOY WEB SERVICES , PUNE
INDIA -
10/4/2013 Total pages -2
JOY WEB SERVICES PVT LTD ,PUNE , INDIA [Replace with your company name here] PROJECT EXECUTION PLAN FOR PACKAGED DRINKING PLANT IN INDIA
Task Funds No Arrangement Enter daywise money requirement here 1 2 50% 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Work - details
Water Treatment Plant & Filling Machinery
Responsibility
Day
Document Work for Hire greement
Order finalised with TURNKEY Supplier token To get final Pre-Order Proforma from SupplierEqupt Supplr To issue Purchase Oder and advance Plant Owner To Get Order Acceptance with Layout Equpt Supplr Send Water Sample for testing Plant Owner Get Water Report from Lab Plant Owner Call Qtn For other items than equipment Plant Owner Finalise & Issue Order with Advance to Suppliers Plant Owner Interim Follow Up 1 Plant Owner Interim Follow Up 2 Plant Owner Interim Follow Up 3 Plant Owner Equpt Supplr Inspection with Supplier Get Proforma for equipments Equpt Supplr Plant Owner 40% 40% Payment to Suppliers Despatch for all machinery from suppliers Equpt Supplr Site Visit 1(Civil,Interior,Power, Electrical, Water) Equpt Supplr Site Visit 2(Site Shd be ready) Equpt Supplr Start Installation & Send Proforma for 10% Balance Equpt Payment Supplr End Installation Equpt Supplr Start Erection & Piping Equpt Supplr End Erection & Piping Equpt Supplr Start Comissioning Equpt Supplr End Comissioning Equpt Supplr Finalise Bottle Design Plant Owner Ordering Mould Plant Owner
0 2 7 14 7 14 9 12 19 26 33 45 42 45 46 25 40 50 54 55 56 57 58 15 17
Minutes of Meeting & Consent Letter Pre-Order Proforma with Taxes Estimate Purchase Order / Pre-Order Proforma with Sign Order acceptance , Place Dimensions See the sample report here Std Format of Lab List of Items Supplier's Final Qtn , Purchase Order
Inspection Report
Supplier Invoices , Packing List Visit Report Visit Report Plant Owner's site ready consent
Installation, Erection , Comissioning Report Proof - approved , original design
JOY WEB SERVICES , PUNE
INDIA -
10/4/2013 Total pages -2
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
Mould Trial & Despatch Plant Owner 27 Inspection Report Finalise Bottle & Cap Supplier Plant Owner 15 Trials @ Bottle Supplier Plant Owner 30 Inspection Report Bottles & Caps (2000) ready at factory Plant Owner 35 Finalise Label Design Plant Owner 15 Proof - approved , original design Finalise Label Supplier Plant Owner 15 Blank Labels Trial & Despatch Plant Owner 35 Inspection Report Blank Labels (2000) ready at factory Plant Owner 40 Finalise Pouch Design , Advance to FFS Mfr Plant Owner 15 Finalise Pouch Mtl Supplier Plant Owner 15 Proof - approved , original design Blank Pouches Trial on FFS m/c Plant Owner 35 Supplier's Final Qtn , Purchase Order Blank Pouch Mtl (5000) ready at factory Plant Owner 40 FFS M/c despatch from Supplier Equpt Supplr 40 Supplier Invoices , Packing List Water Treatment , Filling M/c Handover Equpt Supplr 60 Handover Report & OK report by User Final 10 % Payment Plant Owner 60 Handover Report & OK report by User Lab & BIS Planning BIS Cons Fee Advance Plant Owner 10 Agreement / Contract Copy Sampling , testing 1 st stage BIS Consultant 40 Lab Advance Plant Owner 30 Supplier's Final Qtn , Purchase Order File Preparation Lab Supplr 30 Lab Inspection & Despatch Lab Supplr 40 File Submission BIS Consultant 75 BIS visit BIS Consultant 90 BIS Fee Plant Owner 92 BIS Cons Fee + License Plant Owner 92 BIS License Copy Preventive Service Calls Equpt Supplr Every 90 th day from Handover : 3 Visits Civil Work , Electrical & Water Piping should be complete before installation - 45 th day from Zero Date.
Disclaimer The information published is just a suggestion. Though very very effective , the user is advised to modify wherever needed, as every project is different in nature and need respective alterations / modifications. Hence We won't be held responsible in case some complications arrive out of using this planning chart as a tool.
doc_637636852.xlsx