abhishreshthaa
Abhijeet S
• Another concept that is used as a metric in six sigma is Rolled Throughput Yield (RTY). Let us assume that a part goes through ten operations
. At each stage 99% parts are good and 1% are reject. It is not very difficult to calculate that we get good 90.43 % parts at the end of the tenth stage.
This means if we start with a batch of 1000 parts, we get 904 good parts and scrap or rework 96 parts. The RTY of the process is 90.43%.
. At each stage 99% parts are good and 1% are reject. It is not very difficult to calculate that we get good 90.43 % parts at the end of the tenth stage.
This means if we start with a batch of 1000 parts, we get 904 good parts and scrap or rework 96 parts. The RTY of the process is 90.43%.