Project Report on Process Improvement Plan

Description
Business process improvement (BPI) is a systematic approach to help an organization optimize its underlying processes to achieve more efficient results.

Process Improvement Plan

Doc ID: Date: Revision: Status:

Abstract
This document describes the process improvement plan for Company XXX.

For Internal Use Only © Centre for Software Engineering

Process Improvement Plan

Approvals

Approvals. Author

Signed.

Date.

For Internal Use Only Page 2 of 19 Sample Process Improvement Plan.doc © Centre for Software Engineering 5/8/2009 Revision 1.0

Process Improvement Plan

Revision History
Revision Release Date
1.0

Author

Reason for Change

For Internal Use Only 5/8/2009 Revision 1.0 Sample Process Improvement Plan.doc © Centre for Software Engineering Page 3 of 19

Process Improvement Plan

Table of Contents
APPROVALS .......................................................................................................2 REVISION HISTORY............................................................................................3 TABLE OF CONTENTS .......................................................................................4 1 INTRODUCTION ...........................................................................................5 1.1 1.2 1.3 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 3 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 4 4.1 4.2 4.3 PURPOSE OF THE DOCUMENT ....................................................................5 DEFINITIONS, ACRONYMS, AND ABBREVIATIONS...........................................5 REFERENCES............................................................................................5 PROJECT OVERVIEW .................................................................................6 PROJECT SCOPE.......................................................................................6 PROJECT GOALS .......................................................................................6 PROJECT OBJECTIVES ...............................................................................7 KEY STAKEHOLDERS .................................................................................7 PROJECT RESOURCES...............................................................................8 CRITICAL SUCCESS FACTORS ....................................................................8 CRITICAL ASSUMPTIONS ............................................................................9 CRITICAL CONSTRAINTS ............................................................................9 CRITICAL DEPENDENCIES ........................................................................10 RISK MANAGEMENT .................................................................................11 ISSUE MANAGEMENT ...............................................................................11 PROJECT TRACKING ................................................................................11 PROJECT STATUS REPORTING .................................................................11 MANAGEMENT REVIEW ............................................................................12 IMPLEMENTATION MANAGEMENT ..............................................................13 CONFIGURATION MANAGEMENT................................................................13 TRAINING REQUIREMENTS .......................................................................13 PROJECT DELIVERABLES .........................................................................13 WORK BREAK DOWN STRUCTURE ............................................................15 PROJECT SCHEDULE ...............................................................................15 KEY MILESTONES ....................................................................................16

PROJECT DESCRIPTION ............................................................................6

PROJECT MANAGEMENT.........................................................................11

PROJECT BREAKDOWN...........................................................................15

For Internal Use Only Page 4 of 19 Sample Process Improvement Plan.doc © Centre for Software Engineering 5/8/2009 Revision 1.0

Process Improvement Plan

1 Introduction 1.1 Purpose of the Document

The purpose of this document is to describe the Process Improvement Plan for XXX. Included is a description of the goals, activities and responsibilities for implementing this process improvement plan. It will describe how the project will be delivered and demonstrate the benefits that will be realised.

1.2
CMMI PI QA QAP

Definitions, Acronyms, and Abbreviations
Capability Maturity Model Integration Process Improvement Quality Assurance Quality Assurance Plan

1.3

References

For Internal Use Only 5/8/2009 Revision 1.0 Sample Process Improvement Plan.doc © Centre for Software Engineering Page 5 of 19

Process Improvement Plan

2 Project Description 2.1 Project Overview

Process Improvement is a key area of advancement for XXX. This process improvement plan is a statement of all PI initiatives and should be used as a guide for the organisation. The PI goals are in direct support of the business goals and initiatives.

2.2
2.2.1

Project Scope
In-Scope

Identify the scope of the project. Which areas, groups, and or projects within your company will be included in your process improvement initiative?

2.2.2

Out-of-Scope

Identify what is not included for this improvement initative.

2.3
Goal 1

Project Goals

Identify the goals of the project:

Goal 2

Goal 3

For Internal Use Only Page 6 of 19 Sample Process Improvement Plan.doc © Centre for Software Engineering 5/8/2009 Revision 1.0

Process Improvement Plan

2.4

Project Objectives

Identify the objectives of the project. Objective 1 •

Objective 2 •

Objective 3 •

2.5

Key Stakeholders

The stakeholders for the process improvement project are as follows: Role Representative Responsibility

For Internal Use Only 5/8/2009 Revision 1.0 Sample Process Improvement Plan.doc © Centre for Software Engineering Page 7 of 19

Process Improvement Plan

2.6

Project Resources

To support the implementation of this process improvement plan the following resources will be required to be available as needed. Role Sponsor Process Champion Representative Responsibility Provide direction and support. Act as Project Manager for the process improvement project, provide leadership and promote process improvement within the organisation To provide assistance & expertise throughout the process improvement project

Steering Group

2.7

Critical Success Factors
Critical Success Factor

The following are the critical success factors for the project. Reference CSF1 CSF2 CSF3 CSF4

For Internal Use Only Page 8 of 19 Sample Process Improvement Plan.doc © Centre for Software Engineering 5/8/2009 Revision 1.0

Process Improvement Plan

2.8

Assumptions

The following are the known assumptions, which have been identified for the project at the date of publishing the current version of the ‘Project Plan’. It is possible that other assumptions will be made as the Project progresses and if so they will be covered in future releases of this document. Reference A1 A2 A3 A4 Assumption

2.9

Constraints

The following are the known constraints, which have been identified for the project at the date of publishing the current version of the ‘Project Plan’. It is possible that other constraints will emerge as the Project progresses and if so they will be covered in future releases of this document. Reference C1 C2 C3 C4 Constraint

For Internal Use Only 5/8/2009 Revision 1.0 Sample Process Improvement Plan.doc © Centre for Software Engineering Page 9 of 19

Process Improvement Plan

2.10

Dependencies

The following are the dependencies, which have been identified for the project at the date of publishing the current version of the ‘Project Plan’. It is possible that other dependencies will emerge as the Project progresses and if so they will be covered in future releases of this document. Reference D1 D2 D3 D4 Dependency

For Internal Use Only Page 10 of 19 Sample Process Improvement Plan.doc © Centre for Software Engineering 5/8/2009 Revision 1.0

Process Improvement Plan

3 Project Management 3.1 Risk Management

A Project risk is any event that may occur that can have a negative impact on the

Project. The approach to ‘Risk Management’ on this Project will be to identify risks as early as possible, take remedial action necessary to remove or reduce the risk to an acceptable level. The Process Champions will be responsible for identifying, quantifying and reporting on risks during the Project. The risks associated with this project have been identified and logged in the Project Risk Table shown in Appendix A.

3.2

Issue Management

As the Project progress issues will be identified and raised by Project Participants. These issues will require some ‘Action’ or ‘Decision’ to be taken. All issues for the project will be logged in the Issue Log shown in Appendix B.

3.3

Project Tracking

Regular project meetings to discuss issues and progress will be held with all process improvement participants and management in attendance. In addition the overall project status will be reviewed with the CSE Mentor on a monthly basis. The project schedule and risks will be tracked and updated weekly.

3.4

Project Status Reporting

The overall project progress will be reviewed XXXX (daily/weekly/fortnightly) and a status report will be produced for the project on a XXXX basis. The project status will be reported using the RAG (Red, Amber and Green) method. The current status is project status in the reporting period, while the Prognosis RAG Status will be the ultimate end result with Risk, Issue, Change Requests, Project dependencies and other mitigating actions taken into consideration.

For Internal Use Only 5/8/2009 Revision 1.0 Sample Process Improvement Plan.doc © Centre for Software Engineering Page 11 of 19

Process Improvement Plan

The following criteria will be used to determine the Current RAG Status.
Current Status Criteria

Green

All Project components are ‘On-Target’ when compared against plan

Amber

If more than 1/3 of the Project components are considered 15% or more behind expectations

Red

If more than 1/2 of the Project components are considered 15% or more behind expectations

Prognosis Status Criteria

Green

No new or existing Issues, Risks, Changes or Project Dependencies that are likely to adversely affect the planned delivery date of the Project.

Amber

New or existing Issues, Risks, Changes or Project Dependencies are likely to adversely affect the planned delivery date of the Project.

Red

Any Issue, Risk, Change or Dependency that will cause a “threat” to the Project being able to deliver on time and to cost.

3.5

Management Review

Status reports will be sent to management on a weekly basis. In addition Management Project Reviews will take place on a periodic basis. These have been scheduled on the Project Schedule in Appendix C.

For Internal Use Only Page 12 of 19 Sample Process Improvement Plan.doc © Centre for Software Engineering 5/8/2009 Revision 1.0

Process Improvement Plan

3.6

Implementation Management

An implementation plan will be produced to address how improvements will be introduced into the organisation. The activities associated with documenting the implementation plan will be included on the project schedule.

3.7

Configuration Management

All work products produced by this project will be placed under Configuration Management.

3.8

Training Requirements

Identify the training requirements for the project.

3.9

Project Deliverables

The following is a list of Project deliverables identified at the date of publishing current version of the ‘Project Plan’. It is possible that other deliverables will be identified during the course of the Project and these will be included in future releases of this document. Deliverable Process Improvement Plan Project Schedule Project Risk Log Project Issue Log Status Reports Implementation Plan Responsibility Process Champion Process Champion Process Champion Process Champion Process Champion Process Champion Project Stage Project Initiation Project Initiation Project Initiation Project Initiation Throughout project the

Implementation Phase

For Internal Use Only 5/8/2009 Revision 1.0 Sample Process Improvement Plan.doc © Centre for Software Engineering Page 13 of 19

Process Improvement Plan

3.10

Project Repository

Identify the location of all project deliverables. It will be the responsibility of the process champion to maintain the project repository.

For Internal Use Only Page 14 of 19 Sample Process Improvement Plan.doc © Centre for Software Engineering 5/8/2009 Revision 1.0

Process Improvement Plan

4 Project Breakdown 4.1 Work Breakdown Structure

The following are the high level tasks to be carried out for the project and the estimated effort required for each task. Task Id Task Description Estimated Effort (Hrs)

4.2

Project Schedule

The project schedule is shown in Appendix B. The project schedule will be closely tracked and reported throughout the lifecycle of the project. This will enable planned action to be taken as soon as possible so that the project can be kept in control. The Project Schedule in Appendix C will be used to track the schedule on a XXXX basis.
For Internal Use Only 5/8/2009 Revision 1.0 Sample Process Improvement Plan.doc © Centre for Software Engineering Page 15 of 19

Process Improvement Plan

4.3

Key Milestones

The key project milestones are as follows:

Milestone

Date

For Internal Use Only Page 16 of 19 Sample Process Improvement Plan.doc © Centre for Software Engineering 5/8/2009 Revision 1.0

Process Improvement Plan

Appendix A

Project Risk Log

For Internal Use Only 5/8/2009 Revision 1.0 Sample Process Improvement Plan.doc © Centre for Software Engineering Page 17 of 19

Process Improvement Plan

Appendix B

Project Issue Log

For Internal Use Only Page 18 of 19 Sample Process Improvement Plan.doc © Centre for Software Engineering 5/8/2009 Revision 1.0

Process Improvement Plan

Appendix C

Project Schedule

For Internal Use Only 5/8/2009 Revision 1.0 Sample Process Improvement Plan.doc © Centre for Software Engineering Page 19 of 19