Operating System for Metro Train

Description
operating system of metro train, what are the different factors considered, demand management, forecasting, capacity and resource planning, aggregate planning, layout and IT implementation.

OPC for Metro Train
SACHIN ANALDAS SAURAV KUMAR

AGENDA
? Introduction about metro train

? Operation System
? Factor to be considered ? Demand management, Forecasting

? Capacity, resource Planning
? Aggregate Planning ? Layout

? IT implementation
? Performance measure ? Conclusion

Introduction
? Metro (In General)
? An underground/ Overhead system with Electric passenger

railway
? Started in London(1890) ? India has first metro at Kolkata ? Rapid Way of transportation ? Capital Intensive ? Tertiary Industry ? Service Focused System

OPERATION SYSTEM
? Optimum level
? Stability ? Breakthrough in service quality

? Uniform level
? Deliver error-proof service ? Robust and simple structure

Factor to be Considered
O Adaptability
O Flexibility O Speed, Power, Load Capacity O Space Utilization O Man power availability O Ease of Maintenance O Pay back period and Break Even Point

CAPACITY PLANNING
O Stations O Coaches O Peak Hours
Var to Ghatkopar
70000 60000 50000 40000 30000 20000 10000 0 2008 2011 2012 36016 39679 60000

Var to Ghatkopar

Passangers

O Time between two stations360
340

customers/hr = 60,000

320 300 DMC MC TC

Passanger s

RESOURCE PLANNING
O Investment
O Maintenance Center O Human Resource

O Power Supply
O Telecommunication O Operation Control Center

FORCASTING
? Following Factors are considered in Forecasting
? Economic Condition ? Population of the city ? Geographical Spread ? Other Transportation system

AGGREGATE PLAN
O Long Term Plan ? Installation of new machineries ? Adaption of New technology ? Track alignment
O Medium Term Plan ? MRO Items purchase, Major Overhauling ? Implementation of Safety Norms and Regulations ? Frequency, Timing O Short Term Plan ? Man Power Planning ? Demand Forecasting during Holidays and Weekly Offs ? Chase Strategy

LAYOUT
O It is continuous flow Service Industry
O Process focused industry O Push/Pull(For Mumbai it will be Pull) O Layout for Metro train: ? Station Layout ? Track Layout ? Train Layout

Station Layout
O Easy Entry /Exit
O Display of Timetable, Current Schedules O O O

O

of train Easy ticketing facility(Like token and ecards) Fast security checks Facility of Lift and Toilets Parking Facility

Track Layout
O Straight tracks O No. of parallel tracks O Easy visibility O Centralized Traffic Control(*Communication

gap) O Fixed track with facility of addition of capacity O Availability of track and stations for other supporting work like maintenance & repair, emergencies and Delay stoppage. O Space available

Train Layout
O No of coaches as per requirement
O Free space with aesthetics and ergonomic

considerations O Maximum accommodation for passengers O Trade Off between number of coaches and Service Level(*Current Local station problem at Church gate in Arrival/Exit)

IT IMPLEMENTATION
O Signaling System
O Online boarding System O Vigilance Software O Comprehensive Accounting and

Transaction O Online Ticketing O Online train Status

PERFORMANCE MEASURE
O Consistency in Operations
O Ease of Service available O Customer Satisfaction O Increase in growth of Revenue



doc_806190048.pptx
 

Attachments

Back
Top