Integrated Development Plan (IDP)

Description
On behalf of the Municipal Council of Mbombela Local Municipality it is my pleasure to hereby present the reviewed 2015/16 Integrated Development Plan (IDP).

1

MBOMBELA LOCAL MUNICIPALITY

FINAL
INTEGRATED DEVELOPMENT PLAN (IDP)
2015-2016 REVIEW

City of Excellence

2
TABLE OF CONTENTS

ACRONYMS ............................................................................................................................................. 8
FOREWORD BY THE EXECUTIVE MAYOR ............................................................................................... 10
MESSAGE BY THE SPEAKER ................................................................................................................... 12
MESSAGE BY THE MUNICIPAL MANAGER ............................................................................................. 14
CHAPTER 1 ............................................................................................................................................ 16
AN OVERVIEW OF THE IDP PROCESS .................................................................................................... 16
1.1 INTRODUCTION ......................................................................................................................... 16
1.2 THE SCOPE OF THE IDP ............................................................................................................... 16
1.3 THE IDP PROCESS FOLLOWED ................................................................................................... 17
1.3.1 Preparation Phase ............................................................................................................... 17
1.3.2 Analysis Phase ..................................................................................................................... 17
1.3.3 Strategy Phase ..................................................................................................................... 17
1.3.4 Project Phase ....................................................................................................................... 18
1.3.5 Integration Phase .............................................................................................................. 18
1.3.6 Approval Phase .................................................................................................................. 18
1.4 STAKEHOLDER ENGAGEMENT AND CONSULTATION IN THE IDP PROCESS ................................ 18
1.4.1 Community Consultative Meetings ..................................................................................... 19
1.5 THE IDP GOVERNANCE & INSTITUTIONAL ARRANGEMENT ....................................................... 64
1.6 IDP ALIGNMENT WITH GLOBAL, NATIONAL, PROVINCIAL AND OTHER PRIORITIES.................. 69
1.6.1 Global Development Dictates ............................................................................................. 69
1.6.1.1 Millenium Development Goals ...................................................................................... 69
1.6.1.2 Nepad Imperatives ......................................................................................................... 69
1.6.2 IDP alignment with the national and provincial imperatives .............................................. 69
1.6.3 National Development Plan 2030 ....................................................................................... 72
1.6.4 The National Spatial Development Perspective (NSDP)...................................................... 73
1.6.5 The Provincial Growth and Development Strategy (PGDS) ................................................ 74
1.6.6 Medium Term Strategic Framework (MTSF) ....................................................................... 74
1.7 CONCLUSION .............................................................................................................................. 74
CHAPTER 2 ............................................................................................................................................ 75
MUNICIPAL DEVELOPMENT PROFILE (SITUATIONAL ANALYSIS) .......................................................... 75
2.1 INTRODUCTION........................................................................................................................... 75
SECTION A: INSTITUTIONAL DEVELOPMENT ........................................................................................ 75
2.2 INSTITUTIONAL PROFILE ............................................................................................................. 75
2.2.1 Governance ......................................................................................................................... 75
2.2.1.1 Legislative ....................................................................................................................... 75

3
2.2.1.2 Executive ........................................................................................................................ 76
2.2.2 Administration development/arrangement ....................................................................... 78
2.2.3 Sector Plans and Policies Status Quo ................................................................................. 82
SECTION B: ENVIRONMENT PROFILE .................................................................................................... 84
2.3 GEOGRAPHIC LOCATION ........................................................................................................... 84
2.4 MUNICIPAL PLANNING ZONES AND WARDS .............................................................................. 85
2.5 DEMOGRAPHIC OVERVIEW ....................................................................................................... 87
2.5.1 Population size .................................................................................................................... 87
2.5.2 Number of households ........................................................................................................ 88
2.5.3 Age and sex composition .................................................................................................... 88
2.5.4 Racial profile ........................................................................................................................ 89
2.5.5 Persons living with disability ............................................................................................... 90
2.5.6 Employment profile and income ......................................................................................... 90
2.5.7 Education attainment .......................................................................................................... 92
2.6 BASIC SERVICES DELIVERY ............................................................................................................. 93
2.6.1 Water ................................................................................................................................... 93
2.6.2 Electricity ............................................................................................................................. 95
2.6.3 Sanitation ............................................................................................................................ 95
2.6.4 Refuse removal/waste management .................................................................................. 96
2.6.5 Roads and Storm water ....................................................................................................... 96
2.6.6 Transport ............................................................................................................................. 97
2.7 SOCIAL AND COMMUNITY DEVELOPMENT .............................................................................. 99
2.7.1 Community facilities ............................................................................................................ 99
2.7.2 Sport development ............................................................................................................ 100
2.7.3 Cemeteries and Open Spaces ............................................................................................ 100
2.7.4 Public Safety (Crime, Road Safety, Fire & Rescue and Disaster management) ................ 101
2.7.4.1 Crime ............................................................................................................................ 101
2.7.4.2 Road Safety ............................................................................................................. 102
2.7.4.3 Vehicle registration and licensing ................................................................................ 102
2.7.4.4 Fire and Rescue ............................................................................................................ 103
2.7.4.5 Disaster Management .................................................................................................. 104
2.7.5 Health ................................................................................................................................ 104
2.8 TRANSVERSAL SERVICES ........................................................................................................... 104
2.8.1 HIV/ AIDS ........................................................................................................................... 105
2.8.2 Youth ................................................................................................................................. 106

4
2.8.2.1 Junior Councilors .......................................................................................................... 107
2.8.2.2 Youth Development Agency......................................................................................... 107
2.8.3 Gender Development ........................................................................................................ 108
2.8.4 Children ............................................................................................................................. 108
2.8.5 Executive Mayor’s programmes ........................................................................................ 109
2.8.6 Disability ............................................................................................................................ 110
2.8.7 The first citizens of Mbombela .......................................................................................... 111
2.8.8 Traditional Healers ............................................................................................................ 111
2.9 LOCAL ECONOMIC DEVELOPMENT (LED) ................................................................................. 111
2.9.1 Introduction....................................................................................................................... 111
2.9.2 Mission statement for the LED .......................................................................................... 111
2.9.3 LED strategy objectives ..................................................................................................... 112
2.9.4 Economic status of the municipality ................................................................................. 112
2.9.4.1 Economic growth ......................................................................................................... 112
2.9.4.2 Sectoral performance .................................................................................................. 113
2.9.4.3 Sectoral employment ................................................................................................... 116
2.9.4.4 Level of concentration: Trees index ............................................................................. 116
2.9.4.5 Comparative advantage: location quotient ................................................................. 117
2.9.5 LED objectives ................................................................................................................... 118
2.9.5.1 Development objective 1: an efficient and enabling municipality with exceptional
infrastructure ........................................................................................................................... 118
2.9.5.2 Development objective 2: an inclusive municipal economy ........................................ 120
2.9.5.3 Development objective 3: an innovative and technologically advanced municipality
.................................................................................................................................................. 125
2.9.5.4 Development objective 4: an education and skills development orientated municipality
…………………………………………………………………………………………………………………………..125
2.9.5.5 Development objective 5: an environmentally friendly and tourism centred region
……………………………………………………………………………………………………………………………128
2.9.6 LED projects ...................................................................................................................... 131
2.9.7 LED forum .......................................................................................................................... 133
2.10 SPATIAL DEVELOPMENT FRAMEWORK (SDF) ......................................................................... 134
2.10.1 SPATIAL ANALYSIS ........................................................................................................... 134
2.10.1.1 Climate ....................................................................................................................... 135

5
2.10.1.2 Geology ...................................................................................................................... 135
2.10.1.3 Topography ................................................................................................................ 136
2.10.1.4 Hydrology ................................................................................................................... 136
2.10.1.5 Geohydrology ............................................................................................................. 136
2.10.1.6 Vegetation .................................................................................................................. 136
2.10.1.7 Biodiversity ................................................................................................................. 137
2.10.1.8 Agricultural capability ................................................................................................ 137
2.10.2 STRATEGIC SPATIAL FRAMEWORK .................................................................................. 137
2.10.2.1 Establish a Municipal Open Space System (MOSS) .................................................... 138
2.10.2.2 Protect prime and unique Agricultural land .............................................................. 139
2.10.2.3 Focus areas for land reform ....................................................................................... 140
2.10.2.4 Develop and strengthen rural-based tourism ............................................................ 141
2.10.2.5 Establish an integrated movement system ................................................................ 142
2.10.2.6 Direct urban growth and promote compact integrated development ..................... 142
2.10.2.7 Consolidate and intensify development in Economic Opportunity Zones ................ 143
2.10.3 DESIRED SPATIAL PATTERN ............................................................................................. 144
2.10.3.1 Urban Development Zone .......................................................................................... 145
2.10.3.2 Kruger National Park Conservation Zone ................................................................... 145
2.10.3.3 Kiepersol-White River Agricultural Zone .................................................................... 146
2.10.3.4 Western Agricultural Zone ......................................................................................... 146
2.10.3.5 Central Agricultural Zone ........................................................................................... 147
2.10.4 MBOMBELA GOLDEN TRIANGLE ..................................................................................... 147
2.11 RURAL DEVELOPMENT, AGRICULTURE AND LAND REFORM ................................................. 148
2.11.1 Implementation of Summit Resolutions ......................................................................... 151
2.11.2 Current Situational Analysis on the ADZ processes ........................................................ 151
2.11.3 Project Commissioning Phase ......................................................................................... 152
2.11.4 Project De-commissioning Phase .................................................................................... 153
2.12 HUMAN SETTLEMENT AND LAND ADMINISTRATION............................................................. 153
2.13 ENVIRONMENTAL MANAGEMENT ......................................................................................... 154
2.13.1 Environmental Education and awareness ....................................................................... 155

6
2.13.2 Air quality management .................................................................................................. 156
2.14 EXPANDED PUBLIC WORKS PROGRAMME (EPWP) ................................................................ 156
2.15 SWOT ANALYSIS ...................................................................................................................... 157
CHAPTER 3 .......................................................................................................................................... 159
MBOMBELA DEVELOPMENT STRATEGIES ........................................................................................... 159
3.1 INTRODUCTION ................................................................................................................... 159
3.2 VISION ................................................................................................................................. 159
3.3 MISSION STATEMENT ......................................................................................................... 159
3.4 CORE VALUES ..................................................................................................................... 159
3.5 MOTTO .............................................................................................................................. 160
3.6 DEVELOPMENT PRIORITIES ................................................................................................ 160
3.7 IDP DEVELOPMENT OBJECTIVES ........................................................................................ 160
3.8 ALIGNMENT OF IDP DEVELOPMENT OBJECTIVE AND PRIORITIES ...................................... 161
CHAPTER 4 .......................................................................................................................................... 162
AUDITOR GENERAL (AG) REPORT AND MEC’S COMMENTS ............................................................... 162
4.1 INTRODUCTION ....................................................................................................................... 162
4.2 AUDITOR GENERAL (AG) REPORT ........................................................................................... 162
4.3 MEC’S COMMENTS ................................................................................................................. 164
4.4 CONCLUSION ............................................................................................................................ 166
CHAPTER 5 .......................................................................................................................................... 167
FINANCIAL PLAN (2014-2017) ............................................................................................................. 167
5.1 INTRODUCTION ................................................................................................................... 167
5.2 MACRO ENVIRONMENT FACTORS – ECONOMIC OUTLOOK ............................................... 168
5.3 REVENUE ENHANCEMENT ASSUMPTIONS ......................................................................... 169
5.4 OPERATING EXPENDITURE GUIDELINES AND ASSUMPTIONS ............................................ 172
5.5 CAPITAL EXPENDITURE OVER THE MEDIUM-TERM ............................................................ 172
5.6 PROVISION OF FREE BASIC SERVICES .................................................................................. 172
5.7 OTHER CONSIDERATIONS ................................................................................................... 173
5.8 BUDGET RELATED POLICIES ................................................................................................ 175
5.8.1 Budget policy ..................................................................................................................... 175
5.8.2 Funding and reserves policy .............................................................................................. 175
5.8.3 Credit control and debt collection policy .......................................................................... 175
5.8.4 Investment policy .............................................................................................................. 176
5.8.5 Tariff policy ........................................................................................................................ 176
5.8.6 Rates policy ....................................................................................................................... 176
5.8.7 Supply chain management policy ..................................................................................... 177
5.9 CONCLUSION ....................................................................................................................... 177
CHAPTER 6 .......................................................................................................................................... 180

7
PERFORMANCE MONITORING AND EVALUATION .............................................................................. 180
6.1 INTRODUCTION......................................................................................................................... 180
6.2 LEGISLATIVE FRAMEWORK FOR PERFORMANCE MANAGEMENT ............................................ 181
6.2.1 Municipal Systems Act, 2000 (Act 32 of 2000) .................................................................. 181
6.2.2 Municipal Planning and Performance Management Regulations, 2001 (MPPMR) .......... 181
6.2.3 Municipal Finance Management Act, 2003 (Act 56 of 2003) ............................................ 181
6.2.4 Local Government: Municipal Performance Regulations for Municipal Managers and
Managers Directly Accountable to Municipal Managers, 2006 ................................................. 182
6.2.5 Implementation and Reporting on the Organisational Performance Management System
.................................................................................................................................................... 182
6.2.6 Provincial Monitoring and Evaluation Framework ............................................................ 182
6.2.7 National Evaluation Policy Framework: November 2011 ................................................. 182
6.3 ROLE PLAYERS IN THE MANAGEMENT OF PERFORMANCE MANAGEMENT ...................... 182
6.3.1 Internal Audit .................................................................................................................... 183
6.3.2 Performance Audit Committee ......................................................................................... 183
6.3.3 Evaluation Panel ................................................................................................................ 183
6.3.4 Executive Mayor and Members of the Mayoral Committee ............................................ 183
6.3.5 Council and Section 79 Committees ................................................................................. 183
6.3.6 Community ........................................................................................................................ 183
6.4 REPORTS .............................................................................................................................. 183
6.5 CONCLUSION ........................................................................................................................... 186
CHAPTER 7 .......................................................................................................................................... 187
MUNICIPAL PROJECTS ......................................................................................................................... 187
7.1 INTRODUCTION ...................................................................................................................... 187
7.2 Funded capital projects ............................................................................................................ 188
7.3: Funded Operating projects ...................................................................................................... 210
7.6 Unfunded projects .................................................................................................................... 243
7.5 Other unfunded projects .......................................................................................................... 247

8
ACRONYMS
_________________________________________________________________________________

ABET : Adult Based Education and Training
ADZ : Agricultural Development Zone
Asgi-SA : Accelerated and Shared Growth Initiative of South Africa
DARLA : Department of Agriculture Rural Development and Land Administration
DBSA : Development Bank of Southern Africa
DEAT : Department of Environmental Affairs and Tourism
DEDP : Department of Economic Development and Planning
DHSS : Department of Health and Social Services
COGTA : Department of Co-operative Governance and Traditional Affairs
DME : Department of Minerals and Energy
DoE : Department of Education
DoRT : Department of Roads and Transport
DSS : Department of Safety and Security
DWA : Department of Water Affairs
EDM : Ehlanzeni District Municipality
EMS : Environmental Management System
EPWP : Expanded Public Works Programme
FBS : Free Basic Services
FET : Further Education and Training
GIS : Geographic Information System
GDS : Growth and Development Summit
IDP : Integrated Development Plan
ISF : Mpumalanga Integrated Spatial Framework
IWMP : Integrated Waste Management Plan
KMIA : Kruger Mpumalanga International Airport
LED : Local Economic Development
MDG : Millennium Development Goals
MIG : Municipal Infrastructure Grant
MLM : Mbombela Local Municipality
MSA : Local Government: Municipal Systems Act, 2000 (Act 32 of 2000)
MFMA : Local Government: Municipal Finance Management Act, 2003 (Act 56 of 2003)
PFMA : Public Finance Management Act, 1999 (Act 22 of 1999)
NDOT : National Department of Transport
NEPAD : New Partnership for Africa’s Development
NSDP : National Spatial Development Perspective

9
PGDS : Provincial Growth and Development Strategy
SDF : Spatial Development Framework
CRDP : Comprehensive Rural Development Programme

10
FOREWORD BY THE EXECUTIVE MAYOR
_____________________________________________

On behalf of the Municipal Council of Mbombela Local Municipality it
is my pleasure to hereby present the reviewed 2015/16 Integrated
Development Plan (IDP). The 2015/16 financial year is the last
financial year of the 2011-2016 term of local government sphere,
therefore it present a unique opportunity to close the current political
term whilst it seamlessly lay basis for the next term of local
government.
The reviewed 2015/16 IDP is responding to the call made by the
Honourable President J. Zuma through the Back to Basics
programme launched on 18 September 2014 at the Presidential Local Government Summit. A clarion
call was made to the local government sector to promote good governance and effective
administration through cutting wastage, spending public funds prudently, hiring competent staff, and
ensure transparency and accountability in municipalities.
The 2015/16 IDP reflects the will to continue with the implementation of the turnaround strategy
approved by the municipal council on 21 August 2014. The turnaround strategy is implemented as an
intervention to address the following key challenges which impact negatively on the administrative
and operational capacity of the municipality:

(a) Financial Management – comprising of matters of revenue enhancement, cost curtailment,
fleet management, supply chain management and clean audit roadmap.

(b) Service Delivery – comprising of acceleration of spending on capital projects, water supply
interventions, waste management and cleanliness, repairs and maintenance of the municipal
infrastructure.

(c) Governance and Institutional Development – comprising of filling of critical vacant positions,
risk management, performance monitoring and evaluation, internal audit, system of delegations
of powers and functions, ICT governance etc.

(d) Social and Economic Development – comprising of local economic development strategy,
rural development, spatial planning, integrated human settlement etc.
The allocation of the capital budget per IDP priorities is as follows over the medium-term;

1. The water supply programmes and projects has been allocated 42 per cent amounting to
R738 million with R224 million allocated for 2015/2016.

2. The roads and storm water management programmes and projects have been allocated 17
per cent amounting to R301 million with R125 million allocated for 2015/2016.

3. The public transport programmes and projects have been allocated 14 per cent amounting to
R240 million with R77 million allocated for 2015/2016.

4. The economic development programmes and projects have been allocated 6 per cent
amounting to R108 million with R25 million allocated for 2015/2016.

5. The community development programmes and projects have been allocated 4 per cent
amounting to R76 million with R26 million allocated for 2015/2016.

The IDP bears testimony that the eradication of backlog to water supply remains the number one
priority hence the allocation of capital budget is bias towards the implementation of bulk infrastructure

11
water projects as well as reticulation infrastructure in some portions of the municipal areas. Central to
the IDP strategic thrust is the need to improve quality of life for the vulnerable communities in the
municipality. Evident to that, the objectives set include ensuring that the indigent households have
access to basic services. As a result municipality will continue to provide free basic services on water,
electricity and sewerage and grant subsidies at a cost of R150 million in 2015/2016 and 12 178
households will be provided with free basic electricity and 121 000 households will be provided with
free basic water.

Similarly, the implementation of the storm water management capital budget will result in nineteen
(19) kilometres gravel roads being upgraded to tarred roads. The construction and tarring of Daantjie
Cemetery road at ward 2 will be completed in 2015/2016 at a cost R49 million.
The municipality appreciates the strategic programmes and projects that will be implemented in the
municipal area prioritised by the Mpumalanga Provincial Government as outlined by the Honourable
Premier, Mr DD Mabuza in his State of the Province Address for 2015, namely:
1. The establishment of the Mpumalanga International Fresh Produce Market to support
agricultural production and create a logistics platform for the export of our fresh produce to
international markets.
2. The construction of strategic dams to increase the availability of water supply for
development.
3. The construction of the Cultural Hub to ensure opportunities for private sector investment are
explored.
4. The establishment of the International Convention Centre.
In conclusion, the IDP and Budget is based on an extensive consultation process in compliance with
the legislative framework. Through the public participation and consultative process we have received
valuable inputs and comments from members of public and stakeholders. The highlights of the public
participation and consultative process are as follows:
? Through your leadership Honourable Speaker, five zonal meetings were held with local
communities from 21 April 2015 and 06 May 2015, and furthermore a consultation meeting
was held on 05 May 2015 with organised stakeholders namely; Business Sector (KLBCT and
NAFCOC), farmers and ratepayers associations etc.
? The Traditional Leaders were consulted on an individual basis by the Office of Speaker from 23
April 2015 until 15 May 2015.
The inputs and comments received during this engagement process includes, amongst others issues
relating to water supply, roads & storm water, electricity, housing, waste management, sanitation and
others. All the inputs or comments were recorded and addressed accordingly. The issues that could
not be implemented or accommodated in the 2015-2016 financial year will be prioritized in the future
depending on the availability of funding. However, operational issues which does not require funding
will be addressed in consultation with relevant Ward Councillors, and those that are within the
competence of provincial departments will be forwarded to the relevant sector departments.
In light of the above, I hereby present the 2015/16 IDP as approved by the Council on 28 May 2015.
Regards

12
MESSAGE BY THE SPEAKER

13

14

MESSAGE BY THE MUNICIPAL MANAGER
____________________________________________

The 2015/16 Integrated Development Plan (IDP) and Budget
have been approved by the Municipal Council on the 28
th
of
May 2015 in compliance with the legislative obligations. The
process of preparing the strategic documents (IDP and Budget)
was validated by the approval by the Municipal Council of the
2015/2016 IDP, Budget, Risk Management and Performance
Management Process Plan in August 2014. This process plan
has been used as a roadmap to navigate the journey to arrive to
last day of tabling the IDP and Budget. Central to the process is
the extensive public consultation process which meant that the
municipality spent six months from September 2014 until March
2015, conducting public participation and consultative processes both internally and externally so that
all inputs and priorities of the citizens of the municipality are catered for on the revised IDP which
formed the basis for the process of the preparation of this budget.

Following the adoption of the Draft IDP and Budget on 30
th
March 2015, as required in terms of the
legislative and regulatory framework, the public participation and consultative process was conducted
subsequently, from 13 April until 15 May 2015.
As part of the consultative process, the municipality also had an engagement exercise with the
National Treasury on 19 May 2015 with regard to the 2015/2016 adopted draft IDP and Budget. The
engagement exercise was conducted with the objective of assessing the credibility of adopted
2015/2016 draft revised IDP and budget. The adopted draft budget was found to be funded with risks
and National Treasury identified the following risks which need to be addressed by the municipality:
? Insufficient measures to collect outstanding debts.
? Unsustainability of cash flow projections due to outstanding debts insufficient collection.
? Timeous payment of creditors, especially Eskom, Water Boards etc.
? Lack of cash backed reserves for funding of capital programmes, future costs of rehabilitation
of landfill sites, employee retirement benefits etc.
? Inefficiency on the utilization of employees resulting in above the norm on incurring of
overtime expenditure and contracted services.

In anticipation of all of the issues raised by the National Treasury fortunately, the municipality has
approved the twelve (12) point plan approved by the municipal council on 31 March 2015. The 12
Point Plan is adequate in addressing the issues raised however there is a need to monitor the
implementation of the plan on a monthly basis to ensure successful mediation of the risk raised by the
National Treasury.

As part of the turnaround plan approved by the Municipal Council in August 2014, the focus of the
2015/16 financial year is on forward planning for the capital projects anchored on stringent measures
set in the procurement plan. The intention is ensure improved capital expenditure so that all capital
grants allocated to the municipality are utilized without failure across all municipal functions. Linked to
this will be a very strict monitoring of the approved procurement plan on monthly basis.

15
With regard to the excessive overtime and the need to improve management of employees, the
municipality has started with the process of turning around the situation by conducting a forensic
report on excessive overtime. During the 2015/16 financial year, the municipality will be implementing
recommendations of the report on excessive overtime. Central to this is the need to introduce new
measures and internal control that complies with the set regulatory and legislative framework for
overtime.

In conclusion the aforementioned matters formed the basis of the following IDP/ Budget objectives
over the medium-term:
(a) To manage risks associated with unstable financial position, underperformance on service
delivery, address governance and institutional development challenges;
(b) To improve financial performance and sustainability over the long term;
(c) To ensure the citizens of the municipality are provided with acceptable levels of services;
(d) To maintain the existing assets and infrastructure base by ensuring adequate repairs and
maintenance is undertaken;
(e) To enable local economic development initiatives and sustainable employment creation.
(f) Achievement of the clean audit outcome.

Regards,

NM SEANEGO
MUNICIPAL MANAGER

16
CHAPTER 1
AN OVERVIEW OF THE I DP PROCESS
_________________________________________________________________________________

1.1 INTRODUCTION

It is required in terms of the Municipal Systems Act, 2000 (Act 32 of 2000) that municipalities must
develop a five (5) year strategic planning document popularly known as Integrated Development Plan
(Municipal Systems Act, 2000).

Integrated Development Plan (IDP) is a process through which the municipality conducts a
comprehensive analysis of the community needs and subsequently prioritises available resources to
address those needs. The process seek to ensure vertical and horizontal integration between the
municipal planned intervention with the planning efforts of national and provincial spheres of
government as well as within the various sectors of government.

The municipality, like any other municipality in the country, continuously faces challenges of service
delivery backlog, capital funding as well as institutional capacity problems. Its ability to provide the key
infrastructure to achieve sustainable and shared economic growth is therefore at the heart of the IDP
and is underpinned by a series of sector plans that have been prepared in recent years and some that
needs to be prepared. The sector plans include the long term plan (vision 2030), Spatial
Development Framework, Local Economic Development Strategy, and an Integrated Waste
Management Plan, Water Services Development Plan, an Integrated Transport Plan and the
Environmental Management Plan amongst others.

The final 2015-2016 IDP review has been developed in accordance with the community priorities,
provincial and national priorities. The document (IDP) is in line with the Medium Term Revenue and
Expenditure Framework (MTREF) which is a three year projection of both revenue and expenditure.

1.2 THE SCOPE OF THE IDP

The 2015-2016 IDP comprise of seven (7) interrelated chapters that are mandatory for a credible IDP,
in terms of the process followed, actual format and layout, and the content.

The first chapter provides an introductory overview of the process followed whilst the second chapter
outlines the municipal development profile in terms of the institutional and external environmental
scan. The third chapter is an outline of the key development objectives and strategies that the
municipality will implement to achieve its legistlative obligations.

The fourth chapter provides a brief summary of the Auditor-General (AG) and MEC for Department of
Cooperative Governance and Traditional Affairs (COGTA) findings, and subsequent remedial
measures taken to address the findings in compliance with statutory obligations. The fifth chapter is
the financial plan of the municipaliy over the next Medium Term Revenue and Expenditure
Framework. The sixth chapter provides an outline of the performance management framework that
guides how the municipality will monitor the progress made towards the achievement of the set
targets. The last chapter (chapter seven) provides a comprehensive overview of the planned projects
over the medium term period as well as projects planned by national or provincial sector departments
as well as by the State Owned Enterprises like ESKOM.

17
1. 3 THE IDP PROCESS FOLLOWED

The following process was followed during the development of the 2015-2016 IDP Review:

1.3.1 Preparation Phase

On 21 August 2014, Council under item A (4) approved the process plan which outlined the process
followed in the development of the 2015-2016 IDP review. The process plan outlined the legislative
framework, organizational structures responsible for the management of the IDP processes,
mechanisms of community participation and the key deadlines of the activities that are led to the
approval of the IDP Review.

It is important to note that the process plan was prepared in compliance with the Ehlanzeni District
Municipality IDP Framework Plan as required in terms of section 27 of the Municipal Systems Act, No.
32 of 2000.

The process plan was presented to Ward Councillors, Ward Committees and Community
Development Workers (CDW) for notification and information purposes.

The approved process plan was circulated to the sector departments, advertised on the Lowelder
newpaper dated 26 August 2014 and placed on the municipal website.

1.3.2 Analysis Phase

The analysis phase involved the performance assessment of 2014-2015 IDP, the municipal level of
development and service delivery backlogs.

Key strategic documents such as IDP, Service Delivery and Budget Implementation Plan (SDBIP),
Mid-year performance, Budget and Annual Report were used to assess the performance of the
municipality. As a result, a municipal performance report was developed to guide the development of
the 2015-2016 IDP.

As per the approved IDP process plan, a schedule of the IDP consultative meetings was developed in
consultation with Ward Councillors. The schedule was advertised on the Lowvelder newspaper dated
3 October 2014 and Ziwaphi of 3 October 2014. It was also placed on the municipal website and in all
the municipal service centres i.e Mbombela Civic Centre, White River Civic Centre, Hazyview Civic
Centre, Kabokweni Civic Centre, Kanyamazane Civic Centre and Matsulu Civic Centre. The
communities were mobilised to attend the IDP consultative meetings. Refer to 1.4.1 below for the
issues raised during consultative meetings.

1.3.3 Strategy Phase

Technical strategic planning sessions were held on 8,19 and 22 December 2014 to refine and confirm
the municipal strategic objectives and priorities for 2015-2016 IDP based on previous (2013-2014 &
2014-2015 financial year), mid year performance (2014-2015 financial year) and community priorities.

On 4 to 6 March 2015, the municipality held the Mayoral Lekgotla to afford the political leadership an
opportunity to consider the Technical Lekgotla proposed strategic objectives and priorities for 2015-
2016. The lekgotla which was attended by Executive, Mayor, Chief Whip, MMCs (political office
bearers), Chairpersons of Section 79 Oversight Committees, Municipal Manager, General Managers
and Senior Managers re-affirmed the existing IDP development priorities as priorities for 2015-2016
financial year. The affirmed priorities are water supply, road infrastructure development and storm
water, electricity supply and management, integrated human settlement, good governance and public

18
participation, sanitation/sewerage, community development, rural development, economic
development, waste management and greening, financial management and viability, public transport
and 2010 legacy and revenue enhancement.

During the lekgotla (Mayoral), it was agreed that priority must be given to the service delivery projects
that were not completed in the previous financial years.

1.3.4 Project Phase

The Mayoral Lekgotla that was held on 4-6 March 2015 identified programmes and projects that must
be included in the 2015-2016 IDP.

1.3.5 Integration Phase

During the finalisation of IDP projects, the municipality considered programmes from sector
departments and other governmental parastatals such as ESKOM, and the projects have been
included in Chapter 6 of this IDP.
1.3.6 Approval Phase

The draft 2015-2016 IDP was adopted by Council on 28 March 2014 and made available to the public
for written representations or inputs in terms of section 21A & B of the Local Government: Municipal
Systems Act, 32 of 2000. Public participatioh meetings were also conducted from the 13
th
of April until
the 13
th
of May 2015 to enable all the stakeholders to make inputs on the Draft IDP and Budget. The
stakeholders include organised business (which include Rates Payers Associations, KLCBT,
NAFCOC,Farmers Association etc), Traditional Leaders, Ward Committees, Community Development
Workers, Non -Governmental Organisations, community structures and communities in general).
The IDP was also presented at Ehlanzeni District Municipality’s IDP rep forum on the 18
th
March and
20
th
of May 2015 to give the sector departments, district and adjacent municipalities to comment on
the document.

1.4 STAKEHOLDER ENGAGEMENT AND CONSULTATION IN THE IDP PROCESS

It is required in terms of chapter 4 of the Municipal Systems Act, 2000 that municipalities must
develop a culture of municipal governance that complements formal representative government with a
system of participatory governance, and must encourage, and create conditions for the local
community to participate in the affairs of the municipality including the preparation, implementation
and review of its IDP. In compliance to the Act, the municipality has adopted the public participation
strategy which reflects ways in which the municipality conducts stakeholder engangement and
consultation in the IDP process.

In terms of the strategy (public participation), the participation of communities is driven through a
Ward Committee System managed by the Public Participation Unit located in the Office of the
Speaker and the IDP Representative Forum arranged through the Office of the Executive Mayor.

Moreover, the municipality’s public participation process comprises of community meetings, zonal
meetings, Mayoral Imbizo(s), Speakers Outreach programmes, business and commercial
stakeholders engangements and traditional leaders engangements.

19
1.4.1 Community Consultative Meetings

The community consultative meetings took place from 9 to 31 October 2014. The aim of the meetings
was to report on the municipality performance and achievements of the previous financial year
(2013/14 and 2014/2015) and also to give the communities an opportunity to raise and confirm priority
issues that need to be addressed in the 2014-2015 financial year. Table 1.4.1 below indicates the
priorities that were raised by the communities during IDP meetings.

Table 1.4.1: Community priorities for 2015-2016
WARD 1
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1.Water Need for water supply (insufficient supply of water.
Water pipes are installed but do not yield water).
Entire ward
Need for five (05) Jojo tanks Entire ward
2. Electricity Need for household connections Mpunzane; Minyane; Mountain View;
New village; Shabalala; RDP
Need for high mast lights & maintenance of existing
street lights
Entire ward

There is a problem of illegal connections Entire ward
3.Roads & storm
water
Need for all major streets to be maintained & paved Entire ward
Need for two (02) speed humps Mdluli Store & next to Ntfolinhlanhla
Need for six (06) foot bridges Entire Ward
Need for overhead bridge Road to Nyongane/Shabalala
Need for storm water drainage Shabalala (next to Nini na Nini Tarven,
ka Elaija & Ka Mndebele
4.Sanitation Need for VIP toilets Shabalala; Emoyeni & Sandford
5. Community
facilities
The existing swimming pool must be refurbished Hazyview
Need for sport field Hazyview
Need for multipurpose centre Hazyview
Need for a library Shabalala
Need for a community hall Hazyview
6. Education Need for secondary school Shabalala & Hazyview
7. Housing Need for RDP houses Mpunzane; Minyane; Mountain View;
New village; Moyeni; Shabalala; Sand
River
8.Transport Need for public transport (bus & taxi) Shabalala to Sand River
Need for bus shelter Next to Sanibonani
Need for traffic lights Next to Sanibonani (Ka Mabuza)

9.LED
Need for job opportunities Entire ward
Need for local people to be appointed on projects taking
place in the ward
Entire ward
10. Waste
management
Need for dustbins Hazyview CBD
Need for the parks to be cleaned Hazyview

20
WARD 1
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
11. Safety &
security
Need for boom gates at all entry & exit points Hazyview
Need for the cleaning of unoccupied sites Hazyview

WARD 2
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Need for extension of Zwelisha & Mluti Bulk Water
Supply
Mluti
Need for a Reservoir Phakane
Need for household connection Phakane
Need for water reticulation Mluti & Mbongeni Area
Need for maintenance of leaking water pipes Zwelisha
Water need to be supplied for 24 hours (bulk) Entire ward
Need for valves (operational) Zwelishana & Mluti
2. Rural
Development
Need for Nkosi City development Entire ward (and surrounding wards)
3. Roads and
Storm water
Need for bus route Gedlembane to kaLubisi bus route,
Nkomeni to Foda bus route &
Siwerewere to kaLubusi bus route
4. Electricity Need for household connections Zwelisha & Sicelosetfu village
Need for 2 high mast lights Sicelosetfu & Zwelisha community hall
5. Education Need for admin block Phakani primary school
Need for additional classrooms (12) Mbongeni primary school
6. Waste
management
Need for waste collection to avoid illegal dumping Entire ward (Strategic areas)
Need for a dumping site Entire ward (Strategic areas)
7. Cemetery Need for the cemetery to be fenced & cleaned Zwelisha & old Daantjie
cemetery
8. Health Need for a clinic Zwelisha & Mluti
Need for additional staff Zwelisha/Phakani
Need for ambul ances & cli nic to operate 24 hrs Zwelisha
9. Community
facilities
Need for the upgrading of sports fields ( poles) Entire ward
Need for a multipurpose centre (incl. library) Zwelisha & Daatjie
10.Sanitation Need for VIP toilets Entire ward
11. Safety &
security
Need for 24 hours visibility of police Entire ward
12. LED Need for job creation programmes Entire ward

21
WARD 3
PRIORITY PROBLEM STATEMENT AFFECTED AREA
1.Water &
Sanitation
Need for water supply Entire ward
Need for eight (8) boreholes Entire ward
Need for jojo tanks Entire ward
Need for VIP toilets Entire ward
2.Electricity Need for household connections Los; Enyokeni ;Elephant; &
Siphumelele
Need for street lights Main road (Mahushu; Siphumelele;
Hobotani; Thulula; Dayizenza;
Madalascom; Enyokeni &
Khombindlela)
3. Roads & storm
water
Need for the streets to be paved Entire ward
Need for road to be tarred Kamphatseni to Sphumelele, Mahushu
to Zakheleni School
Need for footbridges Ngobeni to Los, Kamphatseni to
Sphumelele; Edibhini to Dayizenza;
Mhlambanyatsi to Zakheleni; Hhobotani
to Lundanda; Madala to Dayzenza
(Theledi) & Mphatseni to Elephant.
Need for speed humps Kamphatseni, Mahushu to Dayizenza &
Bus road
Need for bus road Mzaphane to Pentecost, Sphumelelo to
Mphatseni, Mahushu to Zakheleni &
Dayizenza to Mahushu
Need for storm water drainage Entire ward
4.Housing &
Land
Need for RDP houses and vacant stand audit. Entire ward
5. Health Need for a clinic Entire ward
6. Education Need for a primary school Elephant and Sphumelelo
Need for crèche/pre-school Elephant ; Kiepersol block &
Sphumelelo
7.Community
facilities
Need for a library Entire ward
Need for a community hall Entire ward
Need for a sports facilities Entire ward
Need for a community park for children Entire ward
8. LED Need for job creation programmes Entire ward
9.Cemetries Need for cemeteries to be fenced with palisade Mahushu
Need for TLB,VIP toilet & water at cemeteries Entire ward
10. Safety &
security
Need for 24hours visibility of police Entire ward
11. Waste
management
Need for waste removal Entire ward

22
WARD 4
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Need for a Reservoir Zomba
Need for the upgrading of water supply systems Zomba, Lihawu, Gedlembane
Need for Jojo tanks & Boreholes Mountain View, Maphakama,
Ngobiyane; Zomba; Ngobiyaneni
There is no infrastructure in the other side of the area Far west from Gudlumgwenya; the area
between ward 2 & ward 4 to the river
stream.
There is infrastructure but no water Ngobiyane, The Hills
They don’t have water because Silulumanzi has cut the
main pipe
Lihawu
There is a problem of illegal connection. Jojo tanks are
stolen
Entire ward
2. Roads &Storm
water
Need for the upgrading/pavement of all sub-side roads Zwelisha; Vukasambe; Mamelodi;
Maphakama; Part of Zomba and on the
way to the Clinic
Need for access roads Gedlembane & Maphakama
Need for foot & vehicle bridges Mamelodi to Maminza, Moyeni to
Sabane High School, Ngobiyanini.
Need for speed humps 701 road
Need for traffic control officers (children crossing) Maphakama & Zwelisha
Need for storm water drainage Zwelisha
Need for completion of Matshebula bus route Zwelisha at clinic
3. Electricity Need for household connections Maphakane, Part of Zomba
(Ngobiyanini), Part of Moyeni &
Zwelisha, Banda, Zomba next to
Sabane high school
There is a problem of power cuts; need for the
upgrading of power
Etinkukwini
Need for streets lights Lihawu (White House), Mamelodi,
Maphakama & Part of Zwelisha next to
the community hall
Need for the maintenance of the existing streets lights Mathebula road & Zwelisha road
4.Sanitation Need for VIP toilets Entire ward
Need for sewerage system Entire ward
5.Housing Need for RDP houses Entire ward
6. Safety &
Security
Need for the 24 hrs visibility of SAPS (to patrol at the
area)
Bus stops; Mkiweni store
Need for the upliftment of the CPF Entire ward
7.Health Need for a clinic Mamelodi, Lihawu
Need for mobile clinic (temporary measure) Lihawu, Mamelodi
8. Community
facilities
Need for sports ground Mamelodi; Zwelisha
Need for levelling of sports field Lihawu high school; Vukasambe

23
WARD 4
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
primary school; Sabane high school &
Zwelisha primary school
9. Education Need for a primary school Maphakama
10. LED Need for a shopping complex Lihawu

WARD 5
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Need for the construction of package plant at Phola. Phola, Bhekiswako & Salubinda
There is infrastructure at Bhekiswako but no water Bhekiswako
Need for six (06) boreholes Entire ward
2.Electricity Need for 20 high mast lights Entire ward
Need for household electrification (104 household) Phola and Bhekiswayo
3.Roads & storm
water
Need for 4 low level bridges Entire ward
Need for 5 footbridges Entire ward
Need for the paving of all streets Entire ward
Need for bus road to be tarred Komani
Need for storm water drainage Entire ward
4.Sanitation Need for septic tanks & flushing toilets Entire ward
5.Community
hall
Need for the community hall as it was budgeted since
2002
Entire ward
6. Sports
facilities
Renovations & upgrading of sports facilities Entire ward
7.Housing Need for RDP houses Entire ward
8.Cemeteries Need for the upgrading of the road to the cemeteries Entire ward
Need for concrete palisade fencing Entire ward
Need for toilets in the cemeteries Entire ward
9. Waste
collection
Need for removal of waste Entire ward

WARD 6
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1.Water Water supply is very poor. Sometimes, water comes
once a week
Entire ward
Need for water infrastructure eStinini, Bhodlindlala, Dingindoda,
Sukani, Nkanini, Swalala, Mangozeni,
Khanyisani & Magarula
Infrastructure is there but no households connection Swalala; Ma 50 & part of Ma 50; part of
Swalala; part of Sukani & part of
Nkanini & Stadium block

24
WARD 6
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
There is a problem of illegal connections of water Entire ward
Need for a new package plant Mshadza
2. Electricity Need for high mast street lights (crime is very high) Entire ward
Need for household connections

eStinini, Mangozeni, Zamani, eMa 50,
Nkanini, Dingindoda; Stadium
3. Housing Need for RDP houses Entire ward
4.Road & Storm
water
Need for major streets to be maintained, graded &
paved
Entire ward
Need for foot bridges Mshadza to Dingindoda; Dayizenza &
Sukani; Nkanini to Khombidlela;
Mangozeni; Esitinini & Sukani
Need for speed humps Entire ward
Need for storm water drainage & V drains Entire ward
5. Sanitation Need for VIP toilets Entire ward
6.Education Need for a primary school Dingindoda, Nkanini & Mshadza
7.Safety &
Security
Need for the 24 hrs visibility of SAPS (to patrol at the
area)
Entire ward
8.Community
facilities
Need for a community hall Entire ward
Need for Masoyi stadium to be upgraded Mshadza (Stadium)
Ma-50 multi-purpose centre need renovations Ma 50
9.LED Need for shopping complex Swalala
Need for the Swalala Neighbourhood Development Swalala
Need for job opportunities programmes. Most people
depend on grants, sewing & beads projects
Entire ward
10. Cemeteries Need for cemeteries to be cleaned & maintained &
fencing
Zwelisha & the old Daantjie cemetery

WARD 7
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Need for sufficient water supply Entire ward
Need for the installation of rising main pipe to the
reservoir to enable the water treatment plant to be
functional (the treatment plant has been vandalised,
need to be upgraded)
Dibhini (Manzini)
Need for 5 boreholes & fixing of existing boreholes Entire ward
Need for jojo tanks to be filled with water Entire ward
2.Road & storm
water
Need for the road to be tarred Stadium Block ; Manzini road
Need for access road From Manzini to stadium block

25
WARD 7
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
Need for major roads to be maintained & paved Entire ward
Need for bus route Mafifty to Magarula village via Tribal
Authority
Need for speed humps Main Road
Need for 10 footbridges Kasizzle, Lungisani and Kanonyane
Need for overhead bridge Manzini & Tsembanani primary
school
Need for vehicle bridges - Between Mafifty & Magarula
- Between Magarula & Phola
- Sabieskom
- Stadium Block
- Between Cho-cho-cho & Phola on
the Salubindza road.
Need for storm water drainage Entire ward
3. Electricity Need for households connection Stadium Block; Mdumiseni; Lungisani
& Mafifty
Need for additional street lights & high mast lights Entire ward
Need for the maintainance of existing street lights Entire ward
4.Sanitation Need for VIP toilets Entire ward
5.Housing Need for RDP houses (including the indigent people) Entire ward
6. Health Need for the clinic to be renovated & upgraded (need
for more staff & consulting rooms)
Entire ward
Need for the clinic to operate 24hrs Entire ward
7. Community
facilities
Need for a community hall to be completed (the issue of
water & sanitation systems must be completed)
Manzini
Need for the caretaker for the hall Manzini hall
Need for maintenance of sports facilities Entire ward
Need for the local cemetery to be fenced, equipped with
toilets & water
Lungisani
8. LED Need for job opportunities Entire ward
9. Social Services Need for food parcels Area around Stadium Block
10. Education Need for a primary school Mthunzini area

26

WARD 8
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water There is no water in the ward. Jojo tanks are
always empty.
Entire ward
Need for water supply (sufficient and consistent) Entire ward
Need for a Reservoir. Water pipes have been
installed but there is no water
Emoyeni Block
Need for water tankers to be monitored Entire ward
Need for additional boreholes Entire ward
The manual diesel operated must be converted to
electricity
Lindani; Maswazini
2. Roads & storm
water
Need for roads to be tarred Riopark, Lindani and Newsnom
Need for foot bridges Entire ward
Need for streets to be paved Entire ward
Need for a bus shelters Entire ward
Need for an overhead bridge Taxi rank
Need for storm water drainage Entire ward
3.Housing Need for RDP houses Entire ward
4. Health Need for a clinic Emoyeni & Jerusalema
Need to upgrade the existing clinic Jerusalema
5. Community
facilities
Need for a community hall and sports centre Entire ward
Need for a sport Centre Entire ward
Need for a creche Entire ward
6.Electricity Need for household connections Phelandaba; Mhlumeni &
Mountain view
Need for street li ghts and High mast lights Entire ward
7.Sanitation Need for VIP toilets Entire ward
8. Safety &
security
Need for 24hrs visibility of police Entire ward
9. LED Need for job opportunities Entire ward
10. Education Need for the extension of classes Legogote primary school

27

WARD 9
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1.Water There is water crisis (insufficient, interruption and
constant supply). Jojo tanks are always empty-
Local dam need to be used to supply water
Entire ward

Need for Jojo tanks Entire ward
2.Roads & Storm
Water
Need for main roads to be tarred Entire ward
Need for the bus road to be tarred Mgcobaneni
Need for Bermuda road to be completed Mgcobaneni & Mganduzweni
Need for the gravelling & paving of streets Entire ward
Need for speed humps Mgcobaneni & Mganduzweni
Need for 7 foot bridges Mgcobaneni x 2 (next to Nkuna & road to
Khanyisani); Mganduzweni x4 (Shawela;
Mabulala; Enkokhokhweni) & Ndlunkulu
School
Need for the regravelling of all cemetery road Mgcobaneni & Mganduzweni
Need for V-drain to all main road Mgcobaneni; Mganduzweni; eDibhini;
Mabulala to Mganduzweni; Mafledini;
Richmond & Mgcobaneni primary school.
3.Electricity Need for household electrification Embolwane, Thubelihle; Mthethwa Section
& ZCC
Need for street lights Mgcobaneni & Mganduzweni
Need for high mast lights Mgcobaneni & Mganduzweni
4. Housing Need for RDP houses Entire ward
5. Sanitation Need for VIP toilets Entire ward
Need for dumping cabins Entire ward
Need for the sucking of existing toilets Entire Ward
Need for BIN Carbons removals once a week Entire Ward
6.Education Need for secondary school Mgcobaneni & Mganduzweni
Need for combined school Mgcobaneni ; Part of Chochocho &
Lungisani High School
Need for ECD center Mgcobaneni
Need for a library and information centre Entire ward
7. Community
facilities
Need for a community multipurpose hall Mgcobaneni
Need for the renovation of sports ground Mgcobaneni & Mganduzweni
Need for parks Mgcobaneni & Mganduzweni
8. Health Need for a clinic Mgcobaneni
Need for the existing clinic to operate 24 hrs Mganduzweni
Need for environmental & HIV/Aids campaigns Mgcobaneni & Mganduzweni

28
WARD 9
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
9. LED Need for job opportunities & food security Entire ward
Need for community training on LED to Develop
business for unemployed citizens and to
capacitate them with required skills that will
change their lives
Entire ward
10. Safety and
Security
Need for a visibility 24 Hours Entire ward
11. Waste
Collection
No dumping sign to be installed to prevent
dumping of rubbish to no dumping areas
Entire ward

WARD 10
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water There is infrastructure, but yield no water. Bhayizane; Clau-clau; Mhlume;
Mafambisa; Mkikitweni & Luphisi
Need for proper management of valves Clau-clau (part); Entire ward
Need for stand pipes to be maintained No.3 & No. 4
Need for additional boreholes. Entire ward
Need for additional Jojo tanks Spelanyane; Mafambisa; Clau Clau;
Luphisi
Boreholes are not working (need electricity) Thulula; Mafambisa; Luphisi,
Spelanyane
Need for a Reservoir Mafambisa & Clau Clau
2. Electricity Need for household connections Mhlume; Bhayizane; Mafambisa; Clau-
Clau; Spelanyane; Luphisi
Need for street lights Mafambisa, Luphisi & Spelanyane
Need for existing street lights to be maintained Entire ward
There is a problem of illegal connection Luphisi
Need for high mast lights Entire ward (crime hot sports)
The low voltage must be extended for the purpose
of in-house connection
Entire ward
3. Roads & storm
water
Need for the major roads to be maintained &
paved
Entire ward
Need for storm water drainage system

All main & access roads within the ward
Need for storm water drainage Thulula; Bhayizane; Mkikitweni;
Mafambisa
Need for tarring of main streets Entire ward
Need for road signs Clau-clau

29

Need for pedestrian crossings No. 4
Need for scholar transport to assist kids Entire ward
Need for bus shelter & bus stop signs Entire ward
Need for speed humps Entire ward
Need for footbridge Clau-clau, Bhayizane; Mafambisa,
Luphisi
4. Sanitation Need for VIP toilets Mafambisa;
Clau-clau; Luphisi & Spelanyane
Maintenance of existing VIP toilets. Some are not
complete
Clau-clau
5. Community
facilities
Need for a library Entire ward
Need for play grounds to be maintained Entire ward
Need for community hall to be maintained Spelanyana and Clau-Clau Community
Hall
Need for the upgrading of community hall Luphisi community hall
Need for multipurpose centre Entire ward
Need for cemeteries to be maintained and fenced Entire ward
Need for the naming of streets Entire ward
Need for community Hall Mafambisa
6. Housing & land Need for RDP houses Mafambisa; Clau Clau; Luphisi;
Spelanyane
Need for land for residential purposes Entire ward
7. Health Need for the clinic to operate 24 hours service No.4
Need for a new clinic Mafambisa & Luphisi
Need for additional staff Luphisi
Need for maintenance and staffing of the new
clinic
Spelanyana
8. LED Need for job creation Entire ward
9. Safety &
security
Need for satellite police station Mafambisa
Need for 24 hours visibility of police Entire ward
10. Cemetery Need for cemetery and fencing Entire ward
WARD 11
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Need for water package supply plant TV 2 & Magwabaratsane
Need for the reservoir to be filled with water that
will last up to 3 or 4 hours so that all community
members can get water.
TV 2, 3, 4 & Success, Clau-Clau,
Magwabaratsane, Slovo Park, Nkomeni &
Part of Ermelo.
Need for reviving of water infrastructure into a
reservoir to supply water to the community
TV 1 (Central)
Need for the reconstruction of Ngodini dam TV1 (Central)

30
Need for Reservoirs TV1 (Central), TV2,3,4, Clau Clau, Slovo
Park, Ermelo, Nkomeni, Success,
Magwabaratsane
2. Roads & storm
water
Need for bus routes Elijah Mango Phase 3 to Clau-Clau 1;
Nkomeni to Mangozeni; TV 2 to TV 3;
From Jemina T-junction to
Magwabaratsane, From Nkomeni to
Ermelo, Clau-Clau 2 to Clau-Clau 1.
Need for pavement of all roads T.V 1 to 4; Slovo; Nkomeni & Ermelo & all
entrance streets, Clau-Clau 1 to 3,
Magwabaratsane, Madalaskom,
Mangozeni & Success
Need for storm water drainage Entire ward
Need for vehicle bridges Nkomeni to Ermelo, Slovo Park &
Magwabaratsane
Need for a traffic lights Success T-Junction
3. Electricity

Need for household connections
(including the new settlement)
T.V 3; Mashonamini; Mangozeni; T.V 2;
Clau Clau; Ermelo, Magwabaratsane &
part of Slovo Park
Need for street lights & high-mast lights Entire Ward
4. Housing Need for RDP houses Entire ward
5. Sanitation Need for VIP toilets Success & Mangozeni, Part of Ermelo,
Clau-Clau, Slovo Park &
Magwabaratsane, part of TV.
Need for sewerage system Entire ward
6. Education Need for a FET (Technical college) Slovo Park
Need for a community hall & library Slovo Park, Enkomeni & TV
7. Land Land for Agricultural purposes Entire ward
Need for rural development projects for LED
(Fishery)
Ngodini Dam
8. Health Need for a clinic TV 2
9. Safety &
security
Need for satellite police station Clau-Clau & TV
10. LED Need for job opportunities (Technical skills training
Centre)
Entire ward
11. Community
facilities
Need for a park TV 1 & Clau- Clau 3
Need for the upgrading of all existing sports
facilities
Entire ward

Need for a multi-purpose centre with all other
sporting codes except soccer.
Entire ward
12. Bus shelter Need for concrete bus shelter Bus Stops (TV 1, 3, Nkomeni, Ermelo,
Mangozeni, Success.
13. Waste
management
Need for waste removal Entire ward

31

WARD 12
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Need for water supply (sufficient and constant ) Elandshoek; Emgababa; Mashobodo;
Kabhamtjie; Kamashobane; Mjalimane;
Cairs Burn side & Mankele
Need household connection. A reservoir has been
renovated; but water supply pipes have not been
installed
Elandshoek; Mgababa
Need for regular filling of water tankers Magushete; Mgababa, Mankele Trust
2. Community Hall Need for a community hall Elandshoek
3. Health Need for 24 hours clinic. The community has a
site where it can be built
Elandshoek
Need for mobile clinics. The existing ones are not
reliable- 2 months can go by without operating
Entire ward
4. Sanitation Need for sewer system Elandshoek
Need for VIP toilets Alkmaar; Kabhamtjie; Schoemanskloof;
Elandshoek
5. Roads & storm
water
Need for a foot bridge (a multipurpose bridge;
comprising of both pedestrian & vehicle bridges is
recommended)
Elandshoek; Cairn side

Need for waste removal Entire ward
Need for roads to be maintained Alkmaar
6. Education Need for the upgrading of a school. Currently has
grade 1-9 & need to include 10 -12
Ntabamhlophe
Need for a crèche Elandshoek
7. Electricity Need for Free Basic Electricity Ngodwane and Bhamjie as well as the
Entire ward
Need for electricity infrastructure Kabhamtjie; Elandshoek; Kamashobane;
Mjalimane
Need for Apollo lights Elandshoek
8. Housing & Land Need for RDP houses

Elandshoek; Kamashobane; Mjalimane;
Ngodwana; Kabhamtjie
Need for formalization/ tenure upgrade/ title deeds Sibonelo; Ngodwana
9. Waste
management
Need for refuse removal services. Dumping holes
have been dug as a temporary measure; but not
everyone make use of them
Elandshoek
10. Sports
facilities &
cemeteries
Need for a sports/ play ground Elandshoek
Need for a cemetery site. The existing site is next
to the river which they get water from.
Elandshoek
11. Safety &
Security
Need for a satellite police station Elandshoek & Alkmaar garage
Need for a police station & police patrol Elandshoek & Kabhamtjie
Need for the establishment of CPF Schoemanskloof
12. LED Need for business development Entire ward

32

WARD 13
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Housing & Land Need for RDP houses & Disaster houses

Matsulu; Mandela park; Veza; Nazereth
Need for stands Entire ward
2. Water Water is not enough; shortages & interruption Entire ward
Need for 24hrs supply Entire ward
3. Electricity Need for street lights
Power cuts need to be upgraded.
Need for Eskom office in the ward (Not to travel to
Kanyamazane because it is far)
Entire ward
4. Road & storm
water
Need for roads to be tarred/paved & maintained Veza; Hue; Protocol; Oliver Tambo;
Verimilion & Capital Drive
Need for a bridge (access road) Access road to Malelane
Need for speed humps Entire ward
Need for traffic lights at the intersection Near Spar shopping complex
5. Sanitation Need for sanitation/sewerage Matsulu; Mandela park; Veza; Nazereth
6. Emergency
Services
Need for the Ambulance to be available for 24
hours in the clinic
Matsulu local clinic
7. LED Need for skills development centre and
community based businesses
Entire ward for the benefit of women and
children
8. Community
Facilities
Need for a renovation of sports ground Matsulu stadium, soccer ground next to
Matsulu Complex
Need for parks and cemeteries Entire ward
WARD 14
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1.Water Need for stand pipes Phumlani; Msholozi; Hopeville; Wood
house; Steiltes; Lugedleni & Etitandini
There is a problem of water interruptions. Need for 24
hour supply
Phumlani
Need for boreholes Kankanyisa & Sijabulile-Mbambo
Need for the reviewal of water billing system Valencia & West Acres Extension 13
Need for Jojo tanks Wood house; Matsafeni; Lugedleni;
Msholozi; Hopeville; Sterspruit &
Kankanysia
Need for Matsafeni water project to be fast tracked Matsafeni
2. Electricity

Need for households connection Phumlani; Msholozi; Hopeville ,Steiltes;
Wood house; Lugedleni; Etitandini &
Sijabulile-Mbambo

33
Need for street lights Wood house; Matsafeni; Msholozi;
Hopeville & Phumlani
Need for the maintenance of street lights West Acres Extension 13 & Valencia
There is a problem of power interruption Phumlani; Matsafeni; Valencia & West
Acres
There is a problem of electricity billing system Valencia & West acres
Need for indigent register Kakhanyisa
3.Roads and storm
water
Need for roads to be tarred

Matsafeni; Phumlani; Msholozi,
Hopeville; Lugedleni; Kankanyisa;
Etitandini; Steiltes; Skomplaas;
Sterkspruit; Woodhouse & Sijabulile-
Mbambo
Need for a bus route Phumlani; Msholozi; Hopeville;
Matsafeni & Woodhouse
Need for maintenance and upgrade of roads Entire ward
Need for bridges Phumlani & Msholozi
Need for foot bridges Matsafeni (next to kaMdluli & kaNgobeni)
Need for pavement of sidewalks,i.e. Granite;
Platinum, Copper, Silver, Agaat & Bronze streets
West Acres Ext. 13
Need for traffic lights at Dr Mabuza & Valencia-
Namezia road
Valencia

Need for traffic light arrow & traffic lights Valencia
Need for a bridge to be widened Valencia
Need for fencing of the bridge over the canal Valencia
Need for Robots, T-Junction at R40 road Phumlani & Msholozi
Need for taxi rank Phumlani & Msholozi
Need for the resealing and cleaning of roads Valencia & West Acres Extension 13
4.Health Need for a clinic Phumlani; Hopeville; Steiltes;
Woodhouse; Lugedlane; Etitandini;
Kanyisani; Matsafeni; Sijabulile-
Mbambo; West Acres Extension 13
Need for the upgrading of existing clinic (operate 24
hours)
Valencia
Need for monitoring & evaluation of health for
residents affected by the Manganese metal
company
West Acres Ext. 13
Need for the erection of safety wall between the
Manganese metal company & community
West Acres Ext. 13
5 Housing & Land Need for RDP houses Kankanyisa; Woodhouse; Sterkspruit,
Phumlani; Msholozi; Hopeville; Steiltes;
Lugedleni; Etitandini; Matsafeni;
Valencia; West Acres Extension 13 &
Sijabulile-Mbambo
Need for the maintenance of existing RDP houses Entire ward
Need for formalization/ Tenure upgrade/ title deeds Matsafeni, Kankanyisa; Skomplaas;
Woodhouse; Sterkspruit, Msholozi, Hope

34

Ville and Lugedleni
Need for land for the construction of primary &
secondary
Phumlani & Msholozi
6. Community
facilities
Need for a community hall Phumlani; Msholozi; Hopeville;
Matsafeni; Kankanyisa; West Acres Ext.
13; Steiltes; Skomplaas; Woodhouse;
Sterkspruit, Lugedleni; Etitandini;
Valencia & Sijabulile-Mbombo
Need for sports facilities (parks, football, netball,
volley ball & tennis)
Phumlani; Msholozi; Hopeville; Steiltes;
Hood house; Lugedleni; Etitandini;
Matsafeni; West Acres Ext. 13;
Kankanyisa & Sijabulile-Mbambo
Need for the maintenance & management of sports
facilities
Valencia
Need for the introduction of various sporting codes Entire ward
Need for change room sports field Valencia
Need for cricket pitch to be renovated Valencia
Need for cemeteries Phumlani, Msholozi (Hopeville)
Need for the fencing of cemetery Phumlani; Wood house & Matsafeni
7.Education Need for secondary & primary school Phumlani; Msholozi; Lugedlani; Steiltes;
Etitandini & Hope Ville
Need for maintenance of schools Sijabulile-Mbambo; Kankanyisa;
Valencia Matsafeni; Etitandini;
Woodhouse
Need for pre-school sites/ skills development centre Valencia
Need for a disability school West Acres Ext. 13
Need for an ICC Matsafeni (Halls)
Need for drop zone Valencia combined school
8. Sanitation Need for VIP toilets Sterkspruit ; Kankanyisa; Msholozi, Hope
Ville and Lugedleni
Need for sewer system Skomplaas, Kankanyisa; Woodhouse;
Sterkspruit ; Msholozi, Hope Ville
9. Waste
Management
Need for refuse removal services Matsafeni, Kankanyisa; Skomplaas,
Woodhouse; Sterkspruit and Lugedleni
10. Safety &
Security
Need for a satellite police station Valencia; Matsafeni; Skomplaas;
Woodhouse; Msholozi,; Sterkspruit
Need for awareness programmes Entire ward
11. LED Need for business development
Basisa primary co-operatives; Sitimele women project
& Valencia paving project)
Matsafeni, Kankanyisa; Skomplaas;
Valencia; Woodhouse; Sterkspruit; West
Acres Ext. 13, Phumlani & Msholozi
12. Offices Need for post office Matsafeni, Kankanyisa & Phumlani

35

WARD 15
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Education Need for primary School West Acres & Stonehenge
Need for secondary Schools
2. Community
facilities
Need for the Van Rieberk Park to be renovated &
fenced
Van Rieberk Park
Need for parks to be maintained Entire ward
3.Roads & storm
water
Need for bus routes & declaration of bus routes The entire ward
Need for bus stop shelter
Need for public transport network
Need for completion of tar roads Stonehenge
4.Waste
management
Need for landfill/ waste disposal sites to be closed West Acres & Stonehenge
Need for refuse removal services
Need for additional refuse bins Entire ward
There is a problem of illegal dumping Entire ward
5.Social services

Need for the upgrading of existing care facilities West Acres & Stonehenge
Need for Crèches/ Child Care Centers
6.Electricity

There is a problem of power cuts; need for the
upgrading of power
West Acres & Bester Last
Need for streetlights to be maintained West Acres & Stonehenge
7. Safety &
security
Crime is very high in
Business Developments
The entire ward
There is a problem of illegal tax rank at Nelacres Lowveld high school
8. Land Need for protection of Council Land (Land invasion) Stonehenge
9. LED Need for shopping complex Stonehenge
WARD 16
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1.Electricity

There is a problem of power cuts; need for the
upgrading of power
Entire ward
Need for streetlights Entire ward
2.Roads & storm
water
Need for bus routes
Need for declared bus routes
Maggiesdal; Bergvlum;Cromdale;
Rademeyer; Hilltop; Hermansburg
3.Waste
management
Need for landfill/ Waste Disposal Sites Entire ward
Need for refuse removal services
4.Health Need for a clinic Maggiesdal
Need for Crèches/ Child Care Centers
5. Education Need for primary School Maggiesdal
Need for secondary Schools

36

6. Safety &
security
Crime is very high in
business developments
Entire ward
Need for a SAPS satellite Maggiesdal
WARD 17
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Land Need for land & housing development Nelsville
Land is available but no infrastructure Nelsville Ext. 1
2.Health Need for the clinic to operate for 24 hours & be open
everyday
Nelsville
3.Community
facilities
Need for tennis court to be renovated & maintained Nelsville
Need for floodlights at sports stadiums Nelsville
Need for the community hall to be fenced Nelsville
Need for the cemetery to be fenced Nelsville
Need for parks to be maintained Nelsville
Need for the upgrade of Van Riebeeck Pool, change
rooms & pool cleaning equipment
Riebeeck Park
4. Roads & storm
water
Need for the resealing of roads Elizabeth streets (Nelsville) ; Steiltes &
Ext 5
Removal of paving in Waterbok street at Bergland
Laerskool & tar it to make parking in front of the
school
Waterbok street (Bergland Laerskool)
Need for sidewalks to be paved Rudolf & Cohen streets
Need for pedestrian bridge Nelsville & Ghost town
Need for bus shelters Nelsville; Enos Mabuza drive; Ferreira
street & Emkhe street
5.Electricity Need for the upgrading of electricity network Entire ward
6.Safety &
Security
Need for visible policing Nelsville & Steiltes
Need for SAPS Mobile Caravan Nelsville
7. Waste
management
There is a problem of illegal dumping. Need for skips
at strategic points for people to dispose, & placement
of pedestrian bins at bus stops & other areas. Need to
empty dustbins & skips regularly
Entire ward
8. Other Need for the establishment of a City Improvement
District (CID)
Steiltes

37

WARD 18
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1.Water

Need for water. Water supply is cut between
09H00 & 17H00
Kanyamazane; Entokozweni; Tekwane South
& Joe Slovo
Need for a flat rate Tekwane South
2.Elecricity Need for house connection ZB & Ntokozweni
There is a problem of power cuts; need for the
upgrading of power
Uitkyk; Ntokozweni; The Rest & Mayfern
Need for Apollo lights Kanyamazane; Entokozweni; Tekwane South
& Joe Slovo
Need for street lights Entire ward
Need for traffic light arrow & traffic lights N4 & Entrance of Mayfern
3.Roads & storm
water
Need for roads to be maintained/ graded/paved Entire ward
Need for storm water drainage system Collen Road; Tekwane South; Kanyamazane
Need for overhead bridge Ntokozweni to Tekwane South
Need for speed humps Tekwane South main road
Need for storm water drainage Entire ward
4. Housing & land Need for RDP houses Entire ward
Need for the renovation of existing RDP houses Entire ward
Need for re-surveying & pax identification Tekwane South & Kanyamazane
Need for title deeds ZB; Croc Valley; Mayfern & Tekwane South
Need for stands for churches Tekwanec South
5.Waste
Management
Waste collection is a challenge Entokozweni & ZB
There is also a problems of Illegal dumping
(causing hazardous to health)
Entire ward
6.Sanitation Need for a sewer system Tekwane South; ZB & Entokozweni
7. Community
facilities
Need for playing fields Tekwane South
8.Safety &
Security
Need for SAPS mobile station Tekwane South
9.Education Need for scholar patrol Mayfern
10. LED Need for CBP projects ( insufficient funds)
Need for Women Empowerment programmes
All sections
Societies & Home base care
11. Other Need for the Palisade fencing of Mgwenya River Mgwenya River
WARD 19
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1.Water Water is not always available & sometimes it’s
not clean
Entire ward
Need for water reticulation Pholani, East Partial Mahhala, Emathangini,
Part of Dlamini, ZB Mountain View,

38
Thandulwazi, Partial Ekuzoleni, Kgotso,
Thembeka & Park number 2277
Variation in High water bill; a flat rate is
proposed
Entire ward
Need additional reservoir Entire ward
Need for ten (10) jojo tanks Entire ward
2.Electricity Need for household connection Thembeka, Z.B, Part of Dlamini,
Emathangini, Kgotso, East Partial Mahhala,
Pholani, Thandulwazi, Partial Ekuzoleni,
Park number 2277 & Partial ema 18
Need for street lights/Apollo lights Mgwenya, Masihambisane, ZB, Kgotso,
Section 1A, 1B, 2, 7, 8, 9, 10, 11, 18, 20, 21,
Mahhala, Dlamini, Long Homes, Ekuzoleni,
Mountain View, Thembeka, Pholani, East
Partial Mahhala, Emathangini,
Masihambisane, Khulani Crèche, Partial
Nazarene and Park number 2277
Need for the existing street lights to be
maintained.
Entire ward
3.Roads & storm
water
Need for all streets to be paved. Entire ward & Complete Bhemuda roads.
Need for a foot bridge ZB, Thandulwazi, Kgotso, Ekuzoleni &
Mgwenya
Need for storm water drainage system Section 1A, 1B, 2, 7, 8, 9, 10, 11, 18, 20, 21,
Mahhala, Emathangini, East Partial Mahhala,
Thembeka, Ekuzoleni, Mgwenya, Long
Homes, Dlamini, Kgotso, Pholani, Z.B,
Mountain View, Partial Nazarene & Park
number 2277
Need for access roads ZB, Pholani, Kgotso, Dlamini, Partial
Nazarene, Thandulwazi, Thembeka, East
Partial Mahhala, Emathangini, Mgwenya,
Mountain View, Sections 1A, 1B, 2, 7, 8, 9,
10, 11, 18, 19, 20, 21, Partial Ekuzoleni &
Park number 2277
Need for speed humps Dr. E.J Mabuza, Dlamini, Banana, Ubhejane,
Umoya, Dragon-Fly, Imphisi, Legogotha,
Chris Hani, Umzingeli, Catfulani Primary
School & Sakhile Tarven, Sitintile High
School, Masihambisane Primary School,
Sithole Road, Mhlongo Road, Mahhala
Road, Mothapo Road, Siboza Road, Phosho
Road, Zombas Road, ZB, Mahhala, Section
1A, 1B, 7, 8, 9, 10, 11, 18, 19, 20, & 21
4.Sanitation Need for sewer system in the newly developed
areas
Z.B; Mountain View, Thandulwazi,
Thembeka, Kgotso, Dlamini, Partial
Nazarene, East Partial Mahhala,
Emathangini, Partial Ekuzoleni, Pholani,
Partial ema 18 and Park number 2277
Kanyamazane sewerage treatment plant is
producing bad odour which affects the
community.
Kanyamazane
5.Health Kanyamazane clinic is always overcrowded, Entire ward

39

there is a need for additional staff to wok
Need for another clinic in areas adjacent to the
existing clinic
Entire ward
6.Housing, Land &
formalization
Old deteriorating houses need to be renovated Section 1A, 1B, 2, 7, 8, 9, 10, 11, 18,19, 20
& 21
Need for formalization and a free survey (need
for stands to be surveyed) Stand Numbers and
Title Deeds.
ZB, Mountain View, Pholani, Kgotso,
Dlamini, Partial Nazarene, Thandulwazi,
Thembeka, East Partial Mahhala,
Emathangini, Ekuzoleni, Partial ema 18 &
Park number 227
Need for land to build churches Entire ward
Need for RDP houses Entire ward
Need for stands Entire ward
Need for the maintenance of RDP houses Entire ward
7.Cemeteries Cemeteries need to be fenced with palisade and
cleaned quarterly.
Z.B & E.J
8. LED Need for skills development programmes Entire ward
9.Waste
Management

Need for refuse removal skips Z.B, Mountain View, East Partial Mahhala,
Emathangini, Thembeka, Dlamini, Kgotso,
Pholani, Partial Ekuzoleni, Partial Mgwenya,
Thandulwazi, Partial Nazarene, near
Buhlebuyeta Primary School, Park number
2277 & some parts of the ward.
Need for dust bins ZB,Mountain View, Pholani, Kgotso, Dlamini,
Thembeka, Thandulwazi, East Partial
Mahhala, Buhlebuyeta Primary School,
Section 10, Partila Ekuzoleni, Mgwenya,
Emathangini, Thandulwazi, Partial Nazarene,
Park number 2277 and some parts of the
ward
Need for extra-large dust bin Z.B, Mountain View, Thembeka, Dlamini,
Pholani, Kgotso, East Partial Mahhala, near
Thandulwazi Primary School, Emathangini,
Ekuzoleni, Mgwenya, Sections 1A, 1B, 2, 7,
8, 9, 10, 10 near Buhlebuyeta Primary
School, 11, 18, 19, 20, 21, Mahhala, Park
number 2277, Partial Nazarene, near
Kanyamazane precinct development and
some parts of the ward
Need for truck to collect cutting trees, old
matrasses like in Kabokweni
Entire ward
Need for greening operation project: Sihlobisa
iMbombela
Entire ward
10. Community
Facilities
Need for a swimming pool Kanyamazane precinct development

40

WARD 20
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Insufficient water supply Entokozweni
2.Waste
Management
Need for refuse collection Entokozweni Extension 1, 2 & 3
Need for refuse removal skips to be placed at a
strategic position
Entokozweni Extension 2
3.Sanitation Need for sewerage system Entokozweni
4. Health Need for a clinic. The land is available Next to Likazi school
5. Roads & storm
water
Need for bus route (Busses should use
designated bus routes rather than alternative
roads for children safety)
Ema 31 & Ntokozweni (Connies Drive)
Need for roads to be maintained & paved Entire ward
Need for speed humps Entire ward
Need for storm water drainage Entire ward
Need for bridges Vinto area; Entokozweni Ext. 3
Need for streets to be widened to reduce
encroachment
Entokozweni
6.Electricity Need for household connection Part of Entokozweni & Belladona
Need for street lights (high crime areas) Sikhulile (ZCC); Belladona Section;
Entokozweni Ext. 2 & 3
Need for street lights & Apollo lights to be
maintained
Ema 31, Vinto; Ntokozweni 1,2 & 3
7. Education Need for primary school Entokozweni
8. Community
Facilities
Need for a tennis court Entire ward
Need for a park for kid to be maintained &
monitored
Entire ward
Need for community hall Entire ward
Need for recreational facilities Entire ward
9.Housing & land Need for RDP houses. Foreigners are awarded
RDP houses than local residents. Most of the
RDP houses have been rented out to
foreigners. Need for RDP Audit
Entire ward
10. LED Need for job opportunities Entire ward
Community members must be appointed in
projects that are taking place in the ward
Entire ward

41

WARD 21
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water There is infrastructure, but no house connections
& insufficient water supply
Gobhoza & Nkomeni
There is no infrastructure, no legal house
connections & metering
Emhlume
There is no infrastructure & an extra stand pipe is
required for time being
Enyokeni
2. Roads & storm
water drainage
Need for the streets to be paved; installation on
speed humps & storm water drainage.
Thembisa to Gobhoza; Khisani hardware to
Kwa Khekhe; Lihansi Sihlengele connecting to
Chris Hani road on both ends; Emhlume (all
streets connecting to Chris Hani & Impala
roads); Hercules street connecting to Saber
street & Ema 15 & 16
Need for construction of foot bridges to link
communities
From Kanyamazane complex to Ema 15;
From Jericho to Nkomeni; From Thembisa to
Ka Magida; From Jericho valley to Ward 23
3. Electricity Need for bulk electricity supply Enyokeni & Portia “B”
Need for street lights on main roads (crime
prevention measures)
Kanyamazane complex to Dutch Reformed
Church via Differ’s place; Elshaddai church via
Former bus depot to main street; Khisani
hardware to Thembisa ground; Tiga school to
Jericho valley
4.Sanitation Need for VIP toilets

Entire ward (areas where there is no water
borne sewerage system)
5. Human
Settlement
Need for the upgrading of the former Hostel Kanyamazane- Section 5
Need for RDP houses Entire ward
6. Community
facilities
Need for the renovation community halls (also
provide security, especially at Daantie community
hall)
Kanyamazane & Daantjie (Tembisa)
7. Education Need for Foundation Phase School Emhlume
WARD 22
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1.Water Need for 24 hours water supply (Insufficient
water/ interruptions)
Entire ward
Need for infrastructure Baptist street; Eduma
Need for the repair of water leaks Entire ward
Need for Jojo tanks Entire ward
2.Roads & storm
water
Need for major streets to be maintained & paved Main road (From Bus Stop No. 1 to Masinga &
Entokozweni) & Kamashego road to join
Esigubini
Need for the road to be tarred Main road (From Bus Stop No. 1 to Masinga &
Entokozweni) & Kalalitswele down to
Mlangeni

42

Need for foot bridges Mganweni & Mashego area;
Kamkoena pre-school by pass to Kankambule,
Madonsela Store; Kabenjamini store
Need for storm water drainage system Entire ward
3.Electricity Need for bulk supply & reticulation St Jones & Shishila
Need for streetlights (crime is very high) Shishila section
4. Health Need for 24 hours service at the clinic Eziweni
Need for additional staff and standby
ambulances
Entire ward
Need for a mobile clinic Mashego road
5.Community
Facilities
Need for sports grounds Entire ward
6.Safety &
Security
Need for SAPS ( there is high level of crime) Entire ward
7. Housing & Land Need for RDP houses Entire ward
Need for formalization/ tenure upgrade/ title
deeds
Entire ward
8.LED Need for CBD projects and women
empowerment for job creation.
Entire ward
Need for neighbourhood development &
industrial development
Entire ward
9. Sanitation Need for VIP toilets Entire ward
Need for the sucking of existing toilets Entire ward
10. Waste
management
Need for containers in the dumping site (to be
removed once a week)
Entire ward
11. Social
Services
Need for food parcel or feeding scheme Entire ward
WARD 23
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Road & storm
water
Need for bus route Shishila down to Save More shop
Need for the extension of the bus route Mlotseni (Tsomo)
Need for connector road Khisane road through tar road down to Apollo
Nkomeni bus shelter to Zwane market
Come Duze to Edamini
Mzamane road to the bridge
No storm water drainage system Entire ward
Need for 2 car bridges Entire ward
Need for 10 foot bridges

Shishila; Mlotseni; Nkomeni Nduna-Matsebula;
Mkheyi; Mzamane
2. Water Insufficient water supply (interruption, insufficient
and unhygienic water)
Entire ward

43

Need for house connections Daantjie, Zamokuhle & Shishila
Need for Jojo tanks Daantjie, Zamokuhle & Shishila
Need for 24 hour supply Eziweni and the Entire ward
3. Electricity Need for household connections Daantjie Section (including new settlement
Bhubhushini)
Need for high mast lights & street lights Entire ward (strategic positions)
4. Housing Need for RDP houses Entire ward
Need for the renovation of RDP houses All those built in all the sections of the ward
5. Sanitation Need for VIP toilets Daantjie; Shishila & Likazi Ext 6
Need for BIN Carbons removals once a week
Need for the suctioning of existing toilets
Need for dumping cabins
6. Land Need for formalization / tenure upgrading/title
deeds
Daantie & Likazi Ext 6
Need for land (for agriculture) Entire ward
7. Safety &
security
Need for 24 hours police patrol Entire ward
8. Waste
management
Need for waste collection to avoid health hazards Entire ward
‘No dumping’ signs to be installed to prevent
dumping of rubbish
Daantjie & Shishila
9. Community
facilities
Need for Parks & recreational facilities Entire ward
Need for community hall ,library, sport centre
and parks and recreational facilities
Tiboneleni, Mayibuye & Likazi Ext 6
Need for Post box & telecommunication Tiboneleni; Sibuyile; Mayibuye; Tiga & Pholani
& part of Kanyamazane
10. Health &
social services
Need for a new clinic (fully equipped) Centre of the ward
Need for 24 hours service of clinic
Need for additional staff in the clinic
For the existing ones & the new one
11. Education Need for Information Centre Entire ward
12. LED Need for CBP projects & women empowerment
programmes
All existing societies & home based care within
the ward
Need for community training on LED to develop
business for unemployed citizens and to
capacitate them with required skills that will
change their lives
Entire ward
WARD 24
PRIORITY PROBLEM STATEMENT AFFECTED AREAS

1. Water Insufficient water supply Entire ward
Need for provision reservoir Entire ward
Need for house connections. Multi water Entire ward

44
connections are there but they are not working
Need for water purification and a 24 hours supply Entire ward
Need for Jojo tanks and its maintenance Mpakeni
2. Road & storm
water drainage
Need for storm water drainage system Entire ward
Need for speed humps Entire ward
Need for foot bridges Entire ward
Bus shelters Entire ward
Need for road to be paved From main road (Clinic road), Sibuyile &
Mpakeni
3. Electricity Need for household connections Entire ward
Need for street lights Entire ward
There is a problem of illegal connection Daantjie
Need for an Upgrade of Transformer at
Mdedeleni.
Mpakeni
There is a problem of power cut Entire ward
4. Sanitation Need for VIP toilets Entire ward
5. Housing Need for RDP houses Daantjie & Mpakeni
Need for formalization/tenure upgrade/title deeds Entire ward
Need for the renovation of existing RDP houses Entire ward
6.Safety &
security
Need for 24 hours police patrol Entire ward
7. Waste
management
Need for waste collection to avoid health hazards Entire ward
There is a problem of illegal dumping areas Daantjie
8. Community
facilities
Need for a library Entire ward
Need for a park Entire ward
Need for sports facilities (multipurpose centre,
incl. a community hall)
Mpakeni and Entire ward
9. Health Need for the clinic to be extended; maintained &
upgraded
Sibuyile & Mpakeni

Need for 24 hours service Sibuyile & Mpakeni
Need for additional staff Sibuyile & Mpakeni
Need for Standby Ambulance Entire ward (strategic areas)
10. LED Need for CBP projects & women empowerment
programs
Entire ward
Need for a shopping complex Mpakeni
11. Education

Need for a primary school and crèche Ncakeni
Need for a library Mpakeni
Need for additional class rooms & palisade fence Siyakhula
12. Other Need for a mobile Home Affairs, SASSA and
SAPS Department
Entire ward
Need for a cellphone mast ( for cellphone
network coverage)
Entire ward

45

WARD 25
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1.Water Need for water supply Khombaso
Need for a clean water Comprehensive primary school
Need for water supply at all times Entire ward
Need for Jojo tanks Comprehensive primary school
2.Roads & storm
water
Need for streets to be maintained Entire ward
Need for major bus routes to be tarred Madala Skom – Majika; Main road from Tribal
office to Makhubela; Malangeni
Need for 1 foot bridge Comprehensive, Mthimba & Numbi
Need for speed humps Khombaso; Numbi; Nkambeni & Majika
primary school
Need for vehicle bridge Mlangeni; Libhanoni & Bharaba
Need for storm water drainage system Entire ward
Need for tarring of roads Nkunzi to Mshwane streer (Mtimba)
3.Electricity Need for electrification of houses Khombaso; Madala, Part of Mtimba,
Comprehensive.
Need for street lights Entire ward
4.Sanitation Need for VIP toilets Entire ward
Need for a dumping sites Entire ward
5.Housing &
formalization
Need for RDP houses Entire ward
Need for housing allocation for communities as
outlined in the waiting list
Entire ward
Need for maintenance of RDP houses as are
cracking.
Entire ward (Constructed houses)
Need for formalisation ( title deeds) Entire ward
6. Community
facilities

Need for maintenance of existing sports field Entire ward
Need for a community hall Sand river
Need for sports field Sand river
Need for cemetery site; the existing cemetery is
full.
Entire ward
Need for the existing cemetery to be fenced Entire ward
7.Health Need for a clinic Mthimba
8.Safety &
security
Need for police visibility (crime is very high) Entire ward
9. Waste
management
There is a need for waste removal

Entire ward

10.LED Need for job opportunities Entire ward
Projects implemented within the ward should
create jobs for the local residents
Entire ward
11.Cemeteries Need for cemeteries Kamajika

46

12. Office Need for effective services at Home-Affairs (Need
for additional staff)
Entire ward
WARD 26
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Water is insufficient & some areas does not
have infrastructure
Entire ward
Need for Jojo tanks Kahlophe; Maminza & Section 1; 2 & 3
Stand pipes & water meters are connected at the
gate & no connection has been made to the
house; residents don’t have the required funds to
connect into their houses
Tekwane North
Need for free water to the poor people; particularly
those who have received RDP houses
Tekwane North; Kahlophe; Duma; Maminza;
Section 1,2,&3
2. Electricity Need for households connection Maminza
Need for the installation of 50 street lights Entire ward
Need for high mast lights Entire ward
Need for the existing high mast lights to be
maintained
Ka-Sbhomela & others areas in the ward
Need for lifting of electricity lines. They are
currently very low
Tekwane North
3. Roads &
storm water
Need for the maintenance of roads. During
rainy season, access to schools is very
difficult
Entire ward
Need for footbridge Entire ward
Need for vehicle bridges Between Hillaria & Duma Schools
Need for bus road needs to be completed Tjuma
Need for tarring/paving of all roads Entire ward
Need for bus shelters Entire ward
Need for storm water drainage systems.
There are houses directly affected by storm
water/ culvert pipes to be installed.
Entire ward
4. Sanitation Need for VIP toilets Ward 26 A
Mainline is always blocked Tekwane North
5. Housing;
land &
formalisation
Need for RDP houses Entire Ward
Incomplete houses need to be completed Entire ward
Need for land for further extension of the
residential area
Entire ward
Need for formalization of informal settlements Msogwaba Resort & Hillaria new village
Need for services in the newly established village Hillaria village
6. Community
facilities
Need for the renovation of a community hall and
sports facility.
Entire ward

47

Need for a multipurpose centre Entire ward
Need for social services offices Tekwane North
7. Education Need for a primary school Tekwane North
Need for a library Tekwane North
Need for free scholar bus transport Tekwane North
Need for a crèche Tekwane North
8.LED Need for job opportunities Entire ward
Local labour employed in the implementation
of projects must be given certificates.
Entire ward
Need for the establishment of cooperatives Entire ward
9.Waste
Removal
Need for waste removal Entire ward
10. Health Need for health facilities Entire ward
Clinic hours need to be extended to 24hrs The existing clinic
Need for a clinic & part of the community hall must
be used as a clinic
Tekwane North
11. Safety &
security
Need for a satellite police station Msogwaba
Need for a mobile police station Tekwane North
12. Cemeteries Need for cemeteries to be fenced with palisade Msogwaba
Need for cemetery toilets to be renovated Tekwane North
WARD 27
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water There is infrastructure but no water is coming
out
Khutsong; Gugulethu; Nkwinyas; Section
10;Ekukhanyeni; Gijimani; Beirut;One
Family;Robben Island & Matsulu Entrance
Need for additional Jojo tanks Thulani;Mountain view;
Mathangini; Ekukhanyeni & Khutsong
There is a problem of illegal connections Mountainview & Mathangini
Need for household connection Entire ward
Need for the installation of stand pipes Thulani; Matsulu Entrance;
Mountain view; Mathangini &
Railway-infill
Need for a Reservoir Matsulu West & Matsulu entrance
Insufficient water supply Nkwalini clinic
No Infrastructure Sun City; Thulane section
2. Electricity Need for household connections Khutsong; Mathagini; Matsulu
entrance; Magamusi; Thulani; Unit
centre; Mountain View & informal
settlement
Power cut; need to upgrade power Matsulu West; Matsulu entrance; Entire

48
ward
Illegal connections Matsulu entrance; Mountain View &
Mathagini
Need for high mast lights Entire ward
Need for streetlights Entire ward
Need for street lights to be maintained Entire ward
3. Formalization Need for formalization New stands; Mountain View;
Matsulu entrance & Khutsong
4. Housing Need for RDP houses Entire ward
Need for the completion of incomplete RDP
houses
Section 10; Robben Island & Gijimani
RDP houses are cracking (Damaged ) Ekukhanyeni
Need for hostel for Old Age & Orphans Matsulu West
5.Roads &
Storm water
Storm water drainage system Entire ward
Need for tarring of roads Matsulu entrance- Nkululeko;Matsulu
West- Nkwalini clinic & Frank to New
cemetery
Roads that cannot be accessed during rainy
seasons
Nkwalini clinic road & Nkululeko circuit road
Need for foot & pedestrian bridges Entire ward & Across railway line
Need for road signs Entire ward
Need for maintenance & upgrading of roads Entire ward
Need for bus stop & shelters Entire ward
Need for a bus shelter Entire ward
6. Sanitation Need for VIP toilets Entire ward
Need for sewer system Entire ward
There are no toilets- communities utilize
bushes or railway line
Matsulu-C; Thulani; Mathangini; Mountain
view & Matsulu entrance
7. Health Need for clinic hours to be extended to 24 hrs Nkwalini clinic
Need for clinic toilets that are user friendly to
people with disabilities
Need for the extension of clinic (additional staff
& sufficient furniture)
Need for mobile clinic Matsulu Entrance
8. Social
welfare
Need for office of Social Worker Nkwalini clinic
9. LED Need for empowerment & job creation
through projects implemented in the ward
Entire ward
Need for business development skills for the
community
Entire ward
Need for sufficient funds for CBP Entire ward
Need for a shopping complex Matsulu West
Need for market stalls Matsulu West; &

49

Matsulu Entrance
10. Community
facilities
Need for post office Matsulu West
Need for SASSA offices Matsulu West
Need for Home Affairs offices Matsulu West
Need for Eskom offices Matsulu West
Need for Parks & Recreational facilities Entire ward
Need for Sports facilities-upgrading of sports
field
Entire ward
Need for multi–purpose sports complex Matsulu West
Need for the fencing of old & new municipal
cemeteries
Matsulu Entrance & Matsulu West
Need for the fencing of Traditional council
cemeteries
Lomshiyo
Need for water & ablution facilities at
Cemeteries
Matsulu West & Lomshiyo
Need for emergency services i.e. Fire station Matsulu B
Need for the maintenance & installation of
outside light
Imbokodo hall
Need for a library Matsulu West
11. Waste
management
Need for the removal of refuse removal
services
Mountain View; Mathangini; Matsulu
Entrance & Railway infill
12.Education Need for scholar transport Matsulu entrance to Matsulu A;B & C
Need for a secondary school Matsulu West
Need for a combined school Sbongile primary school
13. Safety &
security
Need for 24 hours SAPS availability Entire ward
Need for Satellite/ Mobile Police Station Entire ward
Need for the recruitment of local volunteers Entire ward
Need for additional SAPS staff Matsulu Police station
14. Land
demarcation
Tenure upgrading/issuing of title deeds Entire ward
WARD 28
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water &
Sanitation
Need for water supply Thulani section
Need for a Reservoir Vodacom Park
Nee for water infrastructure Mashonamini, Zola Park
Need for water borne sewer Zola Park; Mashonamini; Newscom;
Funindlela; Vodacom Park
Need for a sewerage system Newscom; Funindlela; Vodacom Park;
Mashonamini & Zola Park
2. Electricity Need for street lights & Apollo lights/ Poles Entire ward

50

Need for existing Apollo lights to be maintained Thulani; Newscom & Zola
There is always a problem of power failure Zola & Newscom
3.Roads and
Storm Water
Need for streets to be paved Hambavangeli street
Need for speed humps and pedestrian crossing From Funindlela, Paradise and police station
road.
Need for bus shelter and stop signs Entire ward
Need for drainage system Entire ward
Need for access roads to public facilities Mashonamini; Zola Park; Matsulu C; Thulani &
Thulani
4.Housing and
Land
Need for RDP houses and vacant stand audit Entire ward
Need for formalisation (tittle deed) Entire ward
5.Education Need for a primary school Mashonamini
Need for a FET college and a library Entire ward
Access to bursaries for matric students Entire ward
Need for community involvement in education
matters
Entire ward
Access to ABET programme Entire ward
Need for crèches to prepare children for formal
education
Entire ward
6.LED Need for job creation programmes for women &
youth
Entire ward
Need for sustainable livelihood programme for
vulnerable groups
Entire ward
Need for a new shopping complex Matsulu C
Need for job opportunities Entire ward
7.Health Need for access to medication at the clinic for
chronic patients
Entire ward
Need for educational awareness and campaigns
on HIV & Aids
Entire ward
Need for a new clinic Matsulu C
8. Social
services
Need for satellite office of Home Affairs to address
issues of birth certificates; identity documents &
foreign nationals
Entire ward
Need for satellite offices (Department of Public
Works, SASSA and Magistrate court)
Entire ward
9.Safety &
Security
Need for visibility of SAPS Entire ward
Need for a police station and extra vehicle Entire ward
10. Waste
management
Inconsistence removal of waste & shortage of dust
bins
Entire ward
Need waste removal Entire ward
Need for signs for dumping sites Entire ward
11. Sports field Need for sports field Masitakhe sports field & Vodacom park

51

WARD 29
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1.Water Aldie reservoir & Gedlembane reservoir not
pumped with water. Stay longer days with no
water in. shortage
Aldie; Faith; Gedlembane; Somcuba; Sawotini;
Ekukhanyeni & Ekuphileni
Need water tankers Aldie; Faith; Gedlembane; Somcuba; Sawotini;
Ekukhanyeni & Ekuphileni
There is poor quality water. Need for clean water Entire ward
2.Roads & storm
water
Roads are badly damaged. Need for the
reconstruction of Gedlembane Mluti bus route
Gedlembane; Somcuba & Mluti
Need for streets to be paved

From Somcuba to Thithi; Tsela to Thithi;
Mandla phones to Mazambane; Sindzawonye
Eloi to Kuwait; Julius via 123; Ekukhanyeni to
Gudlumgwenya; Gedlembane to reservoir;
Ngoma via Mhlanga & Ekukhanyeni via Mnisi
Need for foot bridges Thela stream; Jane stream; Mbuyane stream;
Skhanda; Etinkukhwini (Mathebula) & Sawotini
Need for vehicle bridges Tsela to Thithi; Somcuba to Thithi; Mphakatsi
21 stream (Nyoni); Vero Nkosi Ekukhanyeni &
Eloi Kuwait road
Need for the maintenance & upgrade of roads Gedlembane to Mluti & Dludlu to
Mkhumlakheza
Need for the sidewalks to be paved Dludlu to Mkhumlakheza road
3. Sanitation Need for VIP toilets (1000) Entire ward
Need for sewerage system to avoid health hazard Entire ward
4. Electricity

Need for infrastructure & households connection Ekuphileni; Ekukhanyeni; Sawotini;
Mkhumlakheza & Eziweni
Need for high mass lights (4) Entire ward
Need for street lights (most needed) Entire ward
5.Housing Need for RDP houses Entire ward
6.Safety &
Security
Need for police patrol Entire ward
7. Waste
management
Need for refuse removal Entire ward
Need for dumping site management Entire ward
8.Community
Facilities
Need for parks & recreational facilities Entire ward
Need for sports facilities Entire ward
9. Health

Need for clinics/ health care facilities Gedlembane; Somcuba; Zwelishana &
Sawotini
Need for mobile clinic Gedlembane; Zwelishana & Somcuba
10. Education Need for educational facilities / schools- not
specified type of transport
Entire ward
11. LED Need for job creation opportunities Entire ward

52

WARD 30
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Need for the upgrading of existing water
infrastructure
White River
2. Sanitation Need for public toilets White River CBD
Need for the upgrading of existing sewer system White River; Rocky Drift; Primkop; Katoen;
Yaverland; White River Country Estate &
Holdings
3.Roads & storm
water
Need for the pavement to be maintained White River
There is a problem of traffic congestion White River; Impala Street; Katoen; Rocky
Drift; Katoen
Need for the Impala street to be closed. Trucks
are destructing when crossing & leave the street
dirty.
White River
Need for roads all the roads to be listed in the
White River Map
Golden Berry & Boegerberg streets
Need for the linkage between the road from
industrial area to the R40
White River
Spoornet railway should be reconsidered and
used as an alternative mode of transport.
White River

4. Electricity There is a problem of power cut Entire ward
Need for fire facilities to be upgraded (Equipment
to be upgraded according to SABS standards)
White River
5.Waste
management
Need for landfill/ waste disposable site White River; Katoen; Rocky Drift;
Need for transfer stations White River country estate & holdings;
Yaverland
Need for the CBD to be cleaned & other building
need to be renovated
White River
6.Education Need for a school (the municipality has already
allocated site)
White River
7.Health Need for the upgrading of existing health care
facilities
White River; Katoen; Rocky Drift; White River
country estate & holdings; Yaverland Primkop
8. Social
services
Need for Orphanage; Old aged homes & hospices White River
Need for crèches/ child care facilities White River
9.Community
facilities
Need for parks & recreational facilities White River; Katoen; Rocky Drift; White River
country estate & holdings; Yaverland; Primkop
Need for sports facilities to be
renovated/maintained
White River
Need for a community hall to be renovated White River
10. LED Need for a space of trading for the hawkers White River

53
WARD 31
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Roads & storm
water
Need for the tarring & paving of street Entire ward
Need for foot bridges Gutshwa to Sibhule School; Gutshwa to
Dippini Bhuga; Bhuga to Half way; Bhayizani
to Gutshwa Primary School & Bhayizane old
sewerage to Halfway
Need for road maintenance Entire ward
Need for speed humps Next to clinic in Bhuga; Poponyane; On the
dam towards the field; Halfway to Bhejukufa &
Next to ka-Mabuza towards the school in
Gutshwa, kaGorden
Need for road signs Bhuga to Ngulubeni & Khumalo Tribal
Authority road
Need for overhead bridge Sbhulo; Edhibini; Mhlanga; Lomangcingci;
Kamagagula & Maphakama
Need car bridge Between Sifunindlela & Gutshwa; between
Zikode and Maseko cemetery
Need for the access road to cemeteries Road to the cemetery
Need for storm water drainage Thulula; Nkohlakalo
2. Water Insufficient water supply Entire ward
Need for the upgrading & maintenance of the
existing infrastructure
Entire ward
Need for new house connection Bhuga; Lucia Park & Gutshwa.
Need for boreholes Poponyane area; Gutshwa area next to the
Chief’s house; next to the sports field; Lucia
Park; Bhayizane, Julukane; Nkomeni &
Nkohlakalo & Halfway next to Mbombela
bricks
Need for Jojo tanks Opposite the cemetery at Bhuga; next to
Shabangu shop; Julukani; Halfway; Mkheyi;
next to Ngobe in Bhayizane; Gutshwa; Lucia
park; Silubane & Bhuga, Poponyane, city
spoilers ground
3. Electricity Need for house connections The area next to the dam; area next to
Mbombela bricks; the area next to the old
sewerage; the area next to Sbhulo, Lucia park
next to cemetery.
Need for street lights/Apollo

From Magagula to Poponyane & from the road
to Sbhulo school and from Bhejukufa road to
kaLomangcingci
4. Sanitation Need for VIP toilets Entire ward
5. Housing Need for RDP houses Entire ward
6. Waste
Management
Need for dumping sites and garbage trailer Entire ward
7. Community
facilities
Need for the community hall to be upgraded Bhuga
Need for a community hall Gutshwa

54

Need for youth centre Entire ward
Need for playing park Gutshwa
8. Education Need for additional classes & admin block Gutshwa (Zikode secondary) & Gutshwa
primary
Need for comprehensive school (crèche &
primary)
Poponyane
9. Safety &
security
Need for 24 hours visibility of police

Entire ward
10. LED Job opportunities Entire ward
11. Health Need for additional staff
Need for 24 hours service
Need for maternity room
Need for kitchen
The existing clinic

12. Cemetery Need for the fencing of cemetery Bhuga; Bhayizane & Gutshwa
WARD 32
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Need for water supply Sincobile; Mhlume; Thembelihle; Phola Park;
Mashonamini; Dwaleni & Teka Takho
Need for water tanks/Jojo tanks and three (3)
boreholes
Entire ward
2. Electricity Need for households connection Thembelihle; Part of Phola Park; Mhlumeni &
Dwaleni section
Need for street light (Strategic positions) Entire ward
3. Roads & storm
water
Need for major roads to be paved & tarred Entire ward
Need for a bus route Dwaleni
Need for foot bridges Teka-takho, Dwaleni & Phola park
Need for speed humps Dwaleni, Teka takho & Phola park
Need for robots Teka Takho Four way stop
4. Waste
Management
Need for waste removal Entire ward
5. Sanitation Need for sewerage management system. VIP
toilets must be provided as a short term solution
Phola Park; Teka Takho; Part of Thembelihle
& Dwaleni
6. Community
facilities
Need for the upgrading of sports field Dwaleni; Phola Park & Sincobile
Need for a community hall & library Entire ward
Need for a new cemetery & fencing of the
existing cemetery
Entire ward
7. LED Need for technical skills training centre Entire ward
8. Housing & Land Need for RDP houses Entire ward (excl. Teka Takho)
Need for land for agriculture purposes Entire ward
Need for formalization Masakhane; Thembelihle & Mhlumeni

55

9.Heatlh Need for additional staff at the clinic Dwaleni
10. Safety &
security
Need for a satellite police station

Dwaleni

11. Education Need for a primary school Teka Takho
Need for transport to assist kids Entire ward
WARD 33
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Water is scarce (only available in the morning) Entire ward
Pressure of water is very low & higher areas are
unable to get water. Need for boreholes
Maporo; Bhejukufa (Mphotholozi) & Mililand
Barcelona & Mphotholozi
2. Electricity Need for Apollo lights Nkohlakalo; Bhejukufa; Mthonjeni & Barcelona
Need for street lights Mililand; Nkohlakalo; Barcelona; Maporo;
Damini to Themba Hospital; Ngodini High &
Mthonjeni
Need for the existing Apollo lights to be
maintained
Entire ward
Need for household electrification Sandzile & Nkohlakalo
3. Roads & Storm
water
Need for gravel roads to be tarred Entire ward
Need for foot bridges Talukwatini leading to Kabokweni Complex ;
Sandzile area (Dutch); Nkohlakalo &
Barcelona
Need for a vehicle bridge Nkohlakalo to Bhejukufa & Shikisha bridge
Need for street to be paved Cemetery
Need for speed humps Nkohlakalo, Maporo & Sandzile area
Need for traffic lights & traffic signs Kabokweni Complex
Need for storm water drainage Entire ward
4. Waste
management
Need for a dumping site & collection of waste Bhejukufa
5. Education Need for community library At a strategic location
6. LED Need for job opportunities Entire ward
7. Sanitation Need for VIP toilets Nkohlakalo
8. Community
facilities
Need for the upgrading of sports ground Maporo & Nkohlakalo grounds
Need for the renovation of community hall Kabokweni community Hall
Need for the renovation & extension of municipal
offices
Municipal Offices (Kabokweni)
9. Housing Need for RDP houses Entire ward
Need for sites Entire ward
10. Health Need for the extension & renovation of
Kabokweni clinic
Kabokweni
11. Formalization Need for formalization Bhejukufa & Kabokweni (new settlement)

56
WARD 34
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Need to expand reticulation system (do away
with water tankers & replace them with
boreholes)
Chweni; Numbi; Phameni; Khumbula (Clinic,
Dingindoda area & Emva-kwentsaba)
Need to increase/upgrade capacity to reservoirs
& borehole to be installed
Khumbula; Chweni; Numbi & Phameni
2. Roads & storm
water
Need for main roads to be tarred Phameni bus route (Bermuda); Numbi bus
route (Bermuda) & Chweni Spieonkoop road
Need for main streets/roads to be paved Khumbula (Main road behind Khumbula high
school leading to Shongwe bottle store; main
road diving Block 1 & Block 2; Chweni
(Gwegwenene); Phameni (road between
Jacob secondary school & Kusile primary
school) & Numbi (Mashonamini & eDibhini)
Need for main roads to be re-gravelled Khumbula; Chweni; Numbi & Phameni
Need for ring road Numbi (Mthimba-Cemeteries); Khumbula;
Chweni & Phameni
Need for vehicle bridges Numbi (Numbi old cemeteries) & Phameni
(Phameni to Makoko bridge)
Need for foot bridges Numbi (Mashonamini x3)& Khumbula
(Malekutu river dividing Khumbula Trust &
Malekutu Trust x2) & Phameni (Jacob Mdluli
Secondary School x1) & Paulos bridge leading
to Masilela Cemeteries
Need for existing foot bridge to be upgraded Chweni (Scom- Bantwana x2; Gwegwenene
x1; Mashonamini x1 & Vukuzenzele x1)
Need for V drains Entire ward
Need for storm water pipes Entire ward
3. Electricity

Need for household connections Chweni (Scom-Bantwana & Chicken Farm);
Numbi (Mbolwane; Area next to cemeteries;
Mthimba; Mashonamini); Khumbula
(Clinic/Dingindoda area; Emva-kweNtsaba) &
Phameni
Need for additional street lights Entire ward
Need for the existing street lights to be
maintained
Entire ward
Need for the upgrading of electricity capacity to
increase power
Khumbula; Phameni; Chweni & Numbi
4. Community
services
Need for community halls Chweni; Phameni & Numbi (multi-purpose
centre)
Need for ablution facilities & fencing of
cemeteries
Entire ward
Need for parks Phameni & Numbi
5. Housing & Land

Need for RDP houses Entire ward
Need for formalization ( tenure upgrading) Entire ward
6. Sanitation Need for VIP Toilets Entire ward

57

7. Health Need for new clinics Phameni; Chweni & Numbi
Need for the upgrading of existing clinic Khumbula
8. Education Need for Administration Block Numbi (George Mhaule Primary School) &
Chweni (Chweni Primary School)
Need for safety in schools Entire ward
Need for FET college for matriculants Numbi (between Numbi & Phameni)
9. LED Need for skills development to community
members; entrepreneurship & tourism.
Entire ward
10. Safety &
security
Need for 24 hours visibility of SAPS Entire ward
Need for Satellite Police Station Chweni
11. Waste
management
Need for waste removal Entire ward
WARD 35
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Insufficient water supply Entire ward
Need for Jojo tanks (for interim relieve) Thembisa, Siligane; Tycoon; Lindela;
Maswirijini; Matangaleni; KaMabopha
Need for boreholes Siligane; Tycoon; Lindela; Maswirijini;
Matangaleni; KaMabopha
Need for a Reservoir Nkohlakalo & Bhuga
2. Electricity Need for household connections

Halfway; Bhuga; Mtangaleni; Bhaburi; Part of
Siligane; Sifunindlela; Skonkwane; Maswirijini;
Matangaleni; Tycoon
Need for streets lights or high mast lights All the crime hot spots i.e. KaMagagula to the
clinic in Matangaleni; Mpompoli to Maseko ring
road; Siligane to Tycoon; Sifunindlela to
Siligane; Elijah Mango to Ermelo
3. Roads & storm
water
Need for the maintenance & upgrading of the
roads
Entire Ward
Need for replacement of speed humps Entire ward
Need for road signs

Ngulubeni to Bhuga road & tribal authority
road.
Need for foot bridge Tembisa; Siligane; Matangaleni; Half Way;
Bhuga to Clau Clau & New sewerage plant
Need for speed humps Matangaleni (x2); Build it (x1); Siligane (x1) &
Magagula (x1)
Need for bus shelter Entire ward (all bus routes)
Need for access road to cemeteries.
Need for water & ablution facilities at cemeteries
Siligani & Matangaleni (to be paved)
Need for storm water drainage Siligane; Sifunindlela; Matangaleni; Ermelo;
Tembisa; Part of Nkohlakalo & Half Way

58

4. Housing Need for RDP houses Entire ward
Private land acquisition for community Entire ward
5. Community
facilities
Need for a park to minimize the youth from
going to tavern
Entire ward
Need for a library; with access to internet Entire ward
Need for sport field to be upgraded Entire ward
Need for a multipurpose centre Entire ward
Need for the maintenance and fencing of
cemetery
Matangaleni, Nkohlokalo, Tembisa, Siliga &
Sifunindlela.
6. Sanitation Need for VIP toilet Entire ward
7. Health Need for another clinic (the population has
grown tremendously)
Old sewerage (Sifunindlela)
Zozo’s must be placed at the clinic to reduce
congestion

Bhuga CHC
8. LED
Need for market stalls Kamagagula
8. Education Need for a primary school Siliga & Matangaleni
Need for a crèche Entire ward
9. Safety &
security
Need for 24 hours visibility of police Entire ward

WARD 36
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Need for 2 Reservoirs Zomba & Newscom
Need for connection of pipes Newscom
Need for refurbishment scheme Entire ward
Need for boreholes Entire ward
Need for jojo tanks Entire ward
2.Road & storm
water
Need for a bus route Emoyeni & Zomba
Need for the tarring/ paving of roads

Zomba; Newscom; Nkanini; Emoyeni;
kaSilinda; Zomba cemetery; Sunshine to
Magagane; Mthombo high school to Newscom
steel tank; Zomba tar to Masjid; Marikos to
Emoyeni cemetery
Need for foot bridge Emoyeni & Zomba
Need for vehicle bridge Entire ward
Need for storm water drainage Sunshine street next to sunshine cafe from KK
Bus Stop; Street from KK Bus Stop; Nkanini &
Mthombo high school street
Need for clearing of roads Entire ward

59

3. Electricity

Need for electricity infrastructure Emoyeni; Dingindoda; A portion of Ka Twala;
Zomba; Newscom; Mgwenya portion &
Makgwabaratsane
Need for Apollo lights Newscom; Nkanini; Mthombo High school;
Zomba next to Mthunzi primary school;
Thembalethu; Sunshine street & all crime
spots & Emoyeni
There is a problem of illegal connection Entire ward
4. Sanitation Need for VIP toilets Zomba & Emoyeni
5.Housing Need for RDP houses Entire ward
6. Health Need for a clinic Entire ward
7.Community
facilities
Need for a library Entire ward
Need for a community hall Entire ward
Need for a crèche & pre-school Newscom
Need for sports ground Entire ward
8.Safety &
Security
Need for satellite police station

Entire ward
9. Cemeteries Need for fencing & cleaning of cemeteries Emoyeni; Newscom & Zomba
10. LED Need for projects to create jobs Entire Ward
11. Waste
Management
Need for land fill site & collection of waste Entire Ward
WARD 37
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Need for and sufficient constant water supply Entire ward
Need for Jojo tanks Makoko; Malekutu; Part of Khumbula (Zwide &
Riverside)
Need for upgrade of a borehole Makoko (2 boreholes) & Malekutu (5
boreholes)
Need to repair the existing borehole next to the
football ground & in Grumbela’s place
Mashonisa
2. Roads & storm
water
Need for roads to be tarred (Main road) Makoko – Numbi road; Mashonisa
bus route, T-Junction between Makok and
Cheweni road.
Need for the roads to be paved Malekutu; Makoko; Zwide; Riverside;
Mashonisa.
Need for foot bridges Malekutu, Khumbula
3. Electricity Need for households electrification Makoko, Phathumetshiso Mashonisa; Part of
Khumbula; Part of Malekutu.
Need for street light and maintenance of existing
street lights
Mashonisa, Makoko, Malekutu aqnd Zwide
River side.
Need for the upgrading of electricity to increase
power
Makoko, Khumbula & Malekutu

60

4. Housing Need of RDP houses Entire ward
5. Sanitation Need for 1000 VIP toilets Malekutu (600); Makoko (250) &
Khumbula(150)

6. Health Need for the upgrading of the existing clinic to
operate for 24 hrs
Makoko

Need for a new clinic Malekutu & Makoko
7. Education Need for recreational facilities Jacob Mdluli High School
Leveling of sports field Jacob Mdluli High School & Makoko primary
Need for extensions of class-rooms Mandundu Primary School & Vutselani
Primary School
Need for administration block Makoko Primary School
Need for safety in schools Makoko & Malekutu & Malekutu Primary
School
8. Community
services
Need for the renovation of stadium Ntsikazi stadium (Khumbula)
Need for a community hall Malekutu
Need for the renovation of community hall Makoko
Need for cricket sport field Malekutu
Need for park maintenance Makoko (Existing park) & Malekutu park
Need for park Phathumetshiso
9. LED Need for skills development programmes on
entrepreneurship & tourism
Makoko
Need for brick laying factory & embroidering &
printing factory
Malekutu & Makoko
Need for a shopping mall Makoko –Mdluli Tribal Authority
Need for job opportunities Entire ward
10. Safety &
security
Need for Satellite Police Station and 24 hour
monitoring
Makoko (next to the Traditional Authority area)
& Malekutu
11. Social services Need for old age pay point Khumbula
WARD 38
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Need for water supply Mbonisweni; Backdoor & Phathwa &
surrounding
2. Electricity Need for households connection Bhongindlala
Need for upgrading of electricity Hillsview
Need for street lights Phathwa; Backdoor & Mbonisweni
3. Roads & storm
water
Some of the roads are in bad conditions &
need urgent attention
Hillsview; Mbonisweni Clinic road &
Pathwa (Road to grave yards)
Need for speed humps Hillsview, Kamagugu and Mbonisweni
Need for side walks Mbonisweni

61

Need for additional access roads Kamagugu
4. Sanitation Need for VIP toilets Entire ward
Poor sewer infrastructure Entire ward
5.Education Need for a secondary school Hillsview
Need for land to build a school Kamagugu
Need for scholar transport to assist kids Entire ward
Need for a library Hillsview & Kamagugu
6. Housing & Land Need for RDP houses Entire ward
Need for land for residential development Hillsview
7. Community
facilities
Need for sport ground to be completed &
upgraded
Hillsview & Phathwa
Need for a community hall Mbonisweni & Kamagugu
Need for floodlights at sports stadium Kamagugu
Need for the upgrading of existing sport fields Hillsview & Phathwa
8. Health Need for a clinic Hillsview & Kamagugu
9. Safety &
security
Need for SAPS to be visible Entire ward
10. LED Need for employment. Many people are not
working
Entire ward
WARD 39
PRIORITY PROBLEM STATEMENT AFFECTED AREAS
1. Water Need for water supply Sibusisiwe; Ngulubeni; Mkhukhwini; Buyelani &
Mvangatini
Need for Jojo tanks Nyongane; Sibusisiwe; Railway; Ngulubeni;
Mkhukhwini, Mvangatini, Buyelani & Sibuyile
There is infrastructure, but no water. Water
comes out once in a life time.
Nyongane; Rockville; Buyelani; Mvangatini;
Ngulubeni & Sibusisiwe
2. Electricity Need for household connections Nyongane; Rockville; Mathetha; Mkhukhwini;
Ngulubeni; Sibusisiwe; Mazakhele; Mvangatini;
Sibuyile; Mjejane & Buyelani
Need for high mast lights Entire ward (crime hot spots)
There is a problem of illegal connections Nyongane; Ngulubeni, Mkhukhwini; Railway;
Mvangatini & Mjejane
3. Road & storm
water
Need for the road to be tarred Nyongane via Gravel yard to KaNkosi’s store
(1;2km); Ifalethu primary school via Chochocho to
National (2km); Macamela road (Ngulubeni road);
Tribal Authority road (Mkhukhwini); Mjejane to
Malekutu & Habi-Tech & Mvangatini main street
Need for maintenance of roads Nyongane; Ngulubeni; Mkhukhwini; Habi-Tech &
Chochocho
Need for foot bridges Nyongane to Chochocho; Nyongane to Tinkomeni
(ZCC); Mkhukhwini (a bridge linking ward 10 &
39); Mvangatini to Buyelani & Buyelani to Mjejane

62
Source: IDP consultative meetings, 2014

Need for speed humps Nyongane (tarred roads); Ngulubeni ; Sibusisiwe
& Buyelami (x2)
Need for traffic signs & pedestrian crossing Ngulubeni road
Need for public transport Kruger National Park; Mvangatini & Buyelani
Need for bus shelter & bus stop signs Ngulubeni; Kruger National Park; Buyelani &
Mjejane
Need for V-drains Entire ward
4. Housing & Land Need for RDP houses Entire ward
Need for staff housing All Living Quarters (Kruger National Park)
5. Sanitation Need for VIP toilets & Sewerage system Nyongane; Sibusisiwe; Clau-Clau; Buyelani;
Mjejane & Mvangatini
Need for VIP toilets to be maintained Entire ward
6. Health Need for a clinic Nyongane; Buyelane & Mvangatini
Need for a fixed or satellite clinic Sibusisiwe; Berg-en-Dal; Pretoriuskop;
Mvangatini; Buyelani & Skukuza
Maximise HIV & Aids Centre for educational
purposes
Entire ward (Buyelani)
7. Education Need for a primary school Buyelani, Nyongane & Sibusisiwe
Need for a secondary school Mashonamini; Buyelane & Mvangatini
Access to bursaries for matric students Entire ward
Need for access to ABET programme Buyelani; Mvangatini & Mjejane
Need for crèches to prepare children for
formal education
Buyelani; Mvangatini & Mjejane
Need for Day Care Centers facilities Berg-en-Dal; Pretoriuskop & Railway
8. Sports facilities Need for the maintenance of existing sports
ground
Nyongane; Ngulubeni; Mkhukhwini; Buyelane &
Mvangatini
Need for sports facilities Kruger National Park; Sibusisiwe
Need for a community hall & library Nyongane
9. LED Need for shelters for vendors Nyongane; Sibusisiwe; Clau-Clau & Skukuza
Need for job opportunities Entire ward
Need for market stalls Kruger National Park; Nyongane & Clau-Clau
Need for sustainable livelihood programme
for vulnerable groups (Marula Project)
Entire ward
Mandela gate to Kruger National Park to be
opened to create more opportunities
Mandela gate
10. Safety &
security
Need for the 24 hrs visibility of SAPS Entire ward
11. Offices Need for Department of Public Works offices Nyongane
Need for driver’s license offices Nyongane
12. Gravel Yard Need grave yard (Drainage system of
500mx5m and 6 fit down)
Nyongane

63
1.4.2 Inputs received during the draft IDP consultation process

The majority of issues received during the consultation process were the same issues already
outlined in table 1.4.1 above as community needs. This includes issues relating to water supply, roads
& storm water, electricity, housing, waste management, sanitation and others.
It must be noted that all the comments or inputs received were recorded, evaluated and addressed
accordingly. The issues that could not be implemented or accommodated in the 2015-2016 financial
year will be prioritized in the future depending on the availability of funding. However, operational
issues which does not require funding will be addressed in consultation with relevant Ward
Councillors, and those that are within the competence of provincial departments will be forwarded to
the relevant sector departments. Table 1.4.2 outline some of the generic issues received during the
consultation process and how they have been addressed.
Table 1.4.2: Generic comments received during consultation process
MEETING COMMENTS/INPUTS RESPONSES/ INTERVENTION
1. Inputs from the
stakeholders (organised
business)
The LED forums must be resuscitated The LED forums will be functional in the 2015-2016
financial year
Projects in the IDP must be numbered All the funded municipal projects in the IDP have
been numbered. Refer to Chapter 7 of the document.
The municipality must use the updated
baseline information in the compilation of
the IDP
The IDP was compiled using the Stat SA, 2011 which
is the official baseline information in the country.
The municipality must prioritize a project
on the investigation of traffic management
on the R40 intersections i.e
Karino/Plaston, Agricultural college
intersection etc.
Projects have been included in the IDP to address
the challenge. Refer to Chapter 7 of the document.
The municipality must prioritize rail (as a
solution to public transport)
Rail has been prioritised in the Comprehensive
Integrated Transport Plans (CITP).
The municipality must conduct community
education on the importance of paying for
municipal services.
The municipality is rolling out programmes to
encourage communities to pay for services. The
same message is also conveyed during the IDP
consultation meetings, Outreach Programme
(Speaker & Mayor’s) etc.
2. Inputs from the zonal
meetings

Maintenance of street & Apollo lights The municipality through the Mayoral Outreach
programme is ensuring that all the street lights are
maintained. Any street light that need to be
maintained must be reported to Ward Councillors for
attention.
Drilling of boreholes at strategic positions
& refurbishment of existing boreholes
A project has been included in the IDP to address the
challenge. Refer to Chapter 7 of the document.
Pavement of major streets There is huge demand for the pavement of major
roads in most of the wards. Some of the streets have
been funded, while others will be considered in the
future IDP depending on the availability of funding.
Refer to Chapter 7 for the funded projects.
Provision of foot bridges next to schools &
areas with no access
There is huge demand for the bridges (foot & vehicle)
in the municipality. Some of the bridges have been
funded, while others will be considered in the future
IDP depending on the availability of funding. Refer to
Chapter 7 for the funded projects.
The Department of Education will also be engaged to
ensure the bridges are considered in the planning of

64
MEETING COMMENTS/INPUTS RESPONSES/ INTERVENTION
new schools.
There is a challenge of water leakages &
illegal connections
It will be addressed through the implementation of
water conservation & demand management
programme.
Monitoring of water tankers It will be addressed through the A YAGELETA
WATER Ambassadors programmes.
Some councillors are not convening
community meetings
The Office of the Speaker will be rolling out a
programme to ensure that councillors convene
community meetings. This will also be in line with the
Back to Basics Strategy programme.
Speed humps at strategic positions It is funded in the 2015-2016 financial year. Each
ward has been allocated 2 speed humps. Refer to
Chapter 7 of the document.
Need for the grading of play grounds &
installation of poles at play grounds
A project has been included in the IDP to address the
challenge. Refer to Chapter 7 of the document.
3. Speaker’s Outreach
Programme (Traditional
Leaders)
The Traditional Authorities must be part of
the municipal activities as pronounced in
the Traditional Leadership and
Governance Framework Act, 2003 (Act 41
of 2003)
The Traditional Authority are part of the municipality.
The municipality has ensured that they are invited to
attend Council meetings.
The municipality must provide sitting
allowance for the Traditional Leaders
A sitting allowance has been budgeted for in the
2015/16 financial year. Traditional Leaders will be
paid travelling allowance for participating in municipal
activities.
The working relationship between the ward
councillors, ward committees, community
development workers and Traditional
Leaders must be improved
The Office of the Speaker has established Speaker’s
Stakeholder Forum which will sit regularly to improve
the relations & also discuss challenges facing the
Traditional Leaders, Ward Councillors, Ward
Committees & Community Development Workers
(CDW).
The Traditional Council must be
involved/informed during the launching of
projects
The Traditional Council will be informed of any
development taking place within the area of
jurisdiction. This also includes launching of projects,
hand over etc.
Request for road leading to the Tribal
office to be paved
The municipality is currently attending to the matter,
& will give feedback in due course.
As a temporary solution, the roads will be regravelled.
1. 5 THE IDP GOVERNANCE & INSTITUTIONAL ARRANGEMENT
The following institutional structures have been identified in the municipality’s public participation
strategy as key structures in the development of the IDP. The structure represents a wider audience
of stakeholders which include organised business, labour, civil society, ward committees, Traditional
Leaders, NGOs, CBOs, as well as members of the public.

65

Structure Description Composition Terms of Reference Frequency of
Meeting
IDP
Representative
Forum
Platform for stakeholder
engagement
Chaired by Executive Mayor:
• Members of the Mayoral Committee
• Councillors (PR & Ward Councillors)
• Municipal Manager
• General Managers
• Senior Managers
• CEO of Parastatals
• Office of the Premier
• HODs
• District Municipality
• Traditional Leaders
• Secretary of Ward Committees
• Organised Business
• Labour
• NGO
• Organised groups
• Represent constituency
interest in the IDP
process
• Platform for discussions
• Participate in the
process of setting and
monitoring “key
performance Indicators.
• Promote stakeholder
integration and
alignment
• Information
assimilation/disseminati
on.
• Capacity development
and sharing.
• Resource mobilization
Bi-Annually
IDP/Budget Steering
Committee
Coordination and
implementation
Chaired by the Executive Mayor:
• Members of the Mayoral Committee
• Municipal Manager
• Chief Operations Officer
• General Managers
• Chief Financial Officer
• Senior Manager: Macro Policy &
Planning
• Validation of Technical
information
• Alignment of Sector
plans
• Sector consultation
• Integration of projects
• Comments on technical
aspects of sector plans
Quarterly
(it is also part of
the Joint POB &
Senior
Management)

66

Structure Description Composition Terms of Reference Frequency of
Meeting
• Senior Manager: Urban and Rural
Development
• Senior Manager: LED, Tourism and
Trading
• Senior Manager: Public Participation
• Senior Manager: Mayoralty and
Communication
• Senior Manager: Risk Management
• Senior Manager : Internal Audit Unit
• Senior Manager: Social Development
• Senior Manager : Parks, Waste
• Senior Manager: Environmental
Management
• Senior Manager : ICT
• Senior Manager: Properties and
Housing
• Manager: IDP
• Manager: Organisational Performance
Management System
• Manager: Budget
• Manager: IGR
• Information
assimilation/disseminati
on
IDP/Budget Technical
Committee
Internal technical working
team
Chaired by the Municipal Manager/ Chief
Operation Officer (COO):
• Senior Managers :BTO
• Senior Manager: Urban and Rural
Development
• Facilitate
implementation of IDP
• Commission research
and studies.
• Consolidate
Bi- Monthly

67

Structure Description Composition Terms of Reference Frequency of
Meeting
• Senior Manager/Managers: LED,
Tourism and Trading
• Senior Manager/Managers: Social
Development
• Senior Manager/Managers : Parks,
Waste and Environmental
Management
• Senior Managers/Managers from
Technical Services
• GIS Unit
• Town Planners
• Manager: IDP
• Manager: Budget
• Manager: Organisational Performance
Management System
• Silulumanzi
• Bushbuckridge Water Board
• Aurocon
• Other relevant stakeholders are invited
on an ad-hoc basis
performance report
• Assist the Executive
Mayor in discharging the
responsibilities as
contemplated in Section
53 of the Municipal
Finance Management
Act no. 56 of 2003.
• Co-ordinate the budget
preparation process.

Ehlanzeni (EDM)
Cluster Groups
Working committees to be
established in terms of
municipal Key Focus Areas
Chaired by relevant MMC/Manager:
• Municipal Officials
• Sector Departments
• Business
• Labour
• Civil society
• Advisory and support for
programmes and project
implementation.
• Advise on IDP Process
development
Quartely

68

Structure Description Composition Terms of Reference Frequency of
Meeting
• Interest Groups
Community Meetings
(Ward Forums)
Community Platforms to
discuss issues affecting
communities
Chaired by the Ward Councillor:
• Members of the Wards Committee in
the ward
• Community Organizations
• Traditional Leaders
• Civic Organization
• Chairperson of Street Committees
• Business Reps
• Youth organizations
• CDW
• (Concern Groups)
• Development of ward
plans, programmes and
projects
• Monitoring Programmes
and Project
implementation
At least once every
two months.

69

1. 6 IDP ALIGNMENT WITH GLOBAL, NATIONAL, PROVINCI AL AND OTHER PRIORITIES

1.6.1 Global Development Dictates
1.6.1.1 Millenium Development Goals
? Eradicate extreme poverty and hunger
? Achieve universal primary education
? Promote gender equality and empower women
? Reduce child mortality
? Improve maternal health
? Combat HIV/AIDS, malaria and other diseases
? Ensure environmental sustainability
? Develop a Global Partnership for Development

1.6.1.2 Nepad Imperatives
? Strengthening mechanisms for conflict prevention, management and resolution at the sub-regional and
continental levels, and to ensure that these mechanisms are used to restore and maintain peace;
? Promoting and protecting democracy and human rights in their respective countries and regions, by
developing clear standards of accountability, transparency and participatory governance at the national
and sub-national levels;
? Restoring and maintaining macroeconomic stability, especially by developing appropriate standards and
targets for fiscal and monetary policies, and introducing appropriate institutional frameworks to achieve
these standards;
? Instituting transparent legal and regulatory frameworks for financial markets and the auditing of private
companies and the public sector;
? Revitalising and extending the provision of education, technical training and health services, with high
priority given to addressing the problem of HIV/AIDS, malaria and other communicable diseases;
? Promoting the role of women in social and economic development by reinforcing their capacity in the
domains of education and training; by developing revenue generating activities through facilitating
access to credit; and by assuring their participation in the political and economic life of African countries;
? Building the capacity of the states in Africa to set and enforce the legal framework, and to maintain law
and order; and
? Promoting the development of infrastructure, agriculture and its diversification into agro-industries and
manufacturing to serve both domestic and export markets.

1. 6. 2 IDP alignment with the national and provincial imperatives

One of the key objectives of IDP is to ensure that there is alignment between the local, district, provincial and
national priorities. Table 1.6 below shows how the municipal development priorities are aligned to the
development objectives.

70

Table 1.6: IDP Alignment with strategic imperatives and priorities
NATIONAL
PRIORITIES
(MANIFESTO)
OUTCOMES NATIONAL
PLANNING
PLAN
PRIORITIES
PROVINCIAL
PRIORITIES
DISTRICT
PRIORITIES
10 POINT
PLAN
COMMUNITY
PRIORITIES
IDP
PRIORITIES
Creation of decent
work &
sustainable
livelihoods
Decent employment
through inclusive
economic growth
Job creation Economic
growth & job
creation
LED LED LED Economic
development
An efficient ,
competitive and
responsive
economic
infrastructure
network
Energy &
mining
Education Quality Basic
Education

Education &
training
Skills
development
Institutional
transformati
on &
development
Capacity
building
Education Good
governance &
public
participation
Skilled & capable
workforce to support
an inclusive growth
path

Health A long and healthy
life for all South
Africans

Provide
quality health
care
Environment Health Community
development
& good
governance &
public
participation
(transversal
services)
Waste
management
Waste
management
& greening
Rural
development, food
security & land
reform
Vibrant, equitable,
sustainable rural
communities
contributing towards
food security for all.

Expand
infrastructure
Strategic
infrastructure
Basic water
&
infrastructur
e
development
Improve
municipal
basic
services
Water Water supply
Sustainable human
settlements &
improved quality of
life

Transform
urban & rural
space
Agriculture Roads & storm
water
Roads
infrastructure
development
& storm water
Electricity Electrical
supply &
energy

71

NATIONAL
PRIORITIES
(MANIFESTO)
OUTCOMES NATIONAL
PLANNING
PLAN
PRIORITIES
PROVINCIAL
PRIORITIES
DISTRICT
PRIORITIES
10 POINT
PLAN
COMMUNITY
PRIORITIES
IDP
PRIORITIES
management
Sanitation Sanitation
Community
facilities
Community
development
Housing Integrated
human
settlement
Social services Rural
development
Crime &
corruption
All people in SA are
and feel safe

Fight
corruption
Fraud &
corruption
Safety & security Good
governance &
public
participation &
community
development
Others Responsive ,
accountable,
effective and
efficient Local
Government
System.

Transition to
a low carbon
economy
Social
cohesion
Good
governance
Good
governance &
public
participation
An efficient, effective
and developmental
orientated public
service and an
empowered, fair and
inclusive citizenship.
Build a
capable state
Tourism,
biodiversity &
cultural
heritage
Financial
managemen
t
Democracy Financial
management
& viability
Create a better
South Africa, a
better Africa and a
better World
Transformati
on & unity
Credible IDP
Protect and enhance
our environmental
assets and natural
resources

Stability,
Integrity

Source: MLM Macro Policy and Planning, 2015

72

1.6.3 National Development Plan 2030

The National Development 2030 provides a national vision for the entire country which requires all
government institutions to take into consideration during the planning and subsequent implementation
of development programs. As a result the municipality attempted to commence with aligning the 2014-
2015 IDP planning process with the strategic imperatives set in the National Development Plan as
follows:

National
Development Plan
strategic thrust
State of the
Province, 2015
Back to basics strategy,
2015
Municipal Strategic
Objectives
Municipal Programs
? Economic
growth
? Expand
infrastructure
? Rural
development

? The
implement
ation of
bulk water
and
sanitation
infrastructu
re projects
through
MEGA
? Delivery basic
services
? To provide
infrastructure and
sustainable basic
services
? Water Supply
? Sanitation
? Roads and
Stormwater
? Electricity
? Social
cohesion
? Disaster
Manageme
nt

? Delivery basic
services
? To provide
sustainable social
amenities to the
communities
? Community Halls
? Sports Facilities
? Parks and
cemeteries
? Integrated
Human
settlement
? Spatial
arrangement
? Integrated
human
settlement
? Delivery basic
services
? To strengthen the
delivery of
sustainable
integrated human
settlement and
environmental
management
? Human settlement
Environment
management
? Economic
growth and job
creation
? Job
creation
? Delivery basic
services
? To initiate a strong
and sustainable
economic
development
? LED
? Building a
capable state
? Fithing
corruption
? Transformation
and unity
? Improving
public
participatio
n
? Enhancing
financial
viability
? Operation
clean audit
? Back to
basics
? Putting people first
? Sound financial
management
? Good governance
? Building capacity
? To build a strong
good governance
and institutional
capacity
? To ensure legally
sound financial
viability and
management
? Corporate
Services
? Public
Participation
? Risk
Management
Financial
Management
? Internal Audit

During the 2015-2016 financial year, the municipality will develop a long term strategic plan
(Mbombela Vision 2030) which will provide a comprehensive overview of the alignment and
cascading of the goals and target set in the National Development Plan.

73

The plan will serve as a gateway development strategy document that will take advantage of the
location of Mbombela. It is envisaged that the process will draw on the background studies that have
either been done by the municipality or the provincial government. Once it has been approved, all key
municipal strategic plans such as IDP, SDF, Budget and other sector plans will be informed by the
plan. The plan together with the SDF will serve as the key strategic documents that will guide and
inform the future development of the municipality.

Figure 1.6.3: Shows the linkage between MGDS (Vision 2030) and the IDP
© Copyright Resolve Group
2
The MGDS needs to fit seamlessly together with the 5-Year IDP – the Mayor’s
plan for the next term of office – and in turn Business Plans.
Linking Mbombela Growth and Development Strategy MGDS and the IDP
MGDS
• What are our
objectives for next term?
• What can we get
done in the next 5 yrs?
Business Plans & SDAs
• Who will do what and
how in the next year?
5-Year IDP
• What are the
future trends?
• Where do we want to be?
• How do we approach
development?
MEDIUM TERM FINANCIAL
PLAN
BUDGET &
SDBIP
LONG TERM FINANCIAL
PERSPECTIVE
The summary of the municipality’s Spatial Development Framework (SDF) is outlined in section 2.10
of Chapter 2.

1.6. 4 The National Spatial Development Perspective (NSDP)

The NSDP advocates for capital investment in areas of growth potential, with an emphasis on
providing basic services and access to social services and human resource development in areas of
need, as well as in those that exhibit less growth potential. The municipality is currently positioning
itself as an area of receiving state investment in infrastructure to support further shared growth and
development. Moreover, the MLM Spatial Development Framework (SDF) was developed on the
premise and understanding of the NSDP objectives and principles.

In respect of the framework (SDF), the municipality took a decision to strengthen its institutional
arrangements and structures in order to support synergy and integration of provincial priorities and

74

programmes. The SDF uses the principles of the ISF to guide development and ensure that the
provincial programme of action and investment in the district and other adjacent neighboring local
municipalities is structured and focused toward achieving sustainable development.

1. 6. 5 The Provincial Growth and Development Strategy (PGDS)

The PGDS takes its mandate from provincial stakeholders to define shared growth and integrated
development targets and objectives for the entire province. The initiative focuses on strengthening
growth sectors, the management of resources, and the implementation of strategies. It is important to
note that the manner in which government invests in infrastructure lays the foundation for the location,
form and type of economic activity that consequently develops. The municipality with its strategic
location as a gateway also offers that opportunity of being a one stop shop for investment and
economic growth, and this has been the guiding principle in the municipal SDF.
1. 6. 6 Medium Term Strategic Framework (MTSF)

The MTSF (MTSF 2014–2019) is essentially a statement of intent by government that identifies the
development challenges facing South Africa and outlining the medium-term strategy for improvement
in the conditions of life of South Africans and for enhanced contribution to the cause of building a
better world. The MTSF gives effect to the electoral mandate. In supporting the implementation of the
MTSF priorities, MLM has formulated its development objectives and priorities in line with the MTSF
objectives. Issues around job creation, health, education, crime and rural development are also
covered as part of the priorities.

1. 7 CONCLUSION

The IDP is a consultative document which details a five year implementation process of the
municipality. Integration is central to its annual review and is therefore discussed at the outset. Both in
letter and in spirit, local government legislation talks of integration as the golden thread that links
strategy, people, process, projects and programmes:
? within the municipality;
? with the needs of the community;
? with provincial and national objectives.

As far as possible, the intention of the MLM 2015-2016 IDP is to link, integrate and co-ordinate
development plans for the municipality. Resources and capacity are aligned with the implementation
of the plan, forming the basis for the annual budget.

75

CHAPTER 2
MUNICIPAL DEVELOPMENT PROFILE (SITUATIONAL ANALYSI S)

_________________________________________________________________________________
2.1 INTRODUCTION
This chapter provides a detailed summary of the municipality’s development profile or situation
analysis. The chapter is divided into two sections, namely,
? Section A: outlines the institutional development and
? Section B: outlines the environmental profile.

SECTION A: INSTITUTIONAL DEVELOPMENT

2.2 INSTITUTIONAL PROFILE
2.2.1 Governance

Local government function in a highly sophisticated environment. To be successful in its endeavours
to render quality, affordable and sustainable municipal services, it needs to be structured in the best
possible way to facilitate effective governance as well as to ensure proper oversight and to measure
performance. MLM has approved the governance model which separates the Legislative and
Executive functions.
2.2.1.1 Legislative
This component consists of the following:
? Council (including the Traditional Leaders)
? The Speaker
? The Chief Whip
? Chair of Chairs
? Section 79 Oversight Committees, namely, Finance and Shared Services Committee; Water
and Sanitation Committee; Infrastructure Development Committee; Human Settlement, Rural
Development & Local Economic Development Committee; Social Development, Flagship
Projects and Transversal Services Committee; Public Safety, Emergency Services, Parks,
Waste and Enviromental Management Services;
? Section 79 Standing Committees, namely, Chairpersons Committee; Public Participation and
Petition Committee; Programming Committee; Rules & Ethics Committee; Municipal Public
Accounts Committee & Party Whips Forum
? Ward Committees.

76

2.2.1.2 Executive
This component consists of the following:
? Executive Mayor (Head of the Executive)
? Members of the Mayoral Committee with delegated powers.
? Mayoral Committee (MMC) comprising of MMC for Water and Sanitation; MMC for
Infrastructure Development; MMC for Corporate Services; MMC for LED, Tourism and Trade;
MMC for Sport and Recreation; MMC for Waste Services, Parks and Cemeteries; MMC for
Financial Services; MMC for Public Safety, Transport, Health and Emergency Services; MMC
for Human Settlements, Rural and Urban Development.
? Section 80 Committees, namely, Concession Monitoring Committee; Local Geographical
Names Committee and Municipal Planning Tribunal Committee
? Administration with the Municipal Manager as Head. This incumbent also serves as the
Accounting Officer of the municipality.

The figure below show the Political Management Model of Mbombela Local Municipality.

77

Finance Corporate
Services
Economic &
Tourism
Development
Services
City Planning &
Development
Services
Human Capital
& Community
Development
Services
Youth, Rural
Development,
Traditional Affairs &
Special Projects
Office of the Executive Mayor
Governance
Cluster
Economic
Dev. Cluster
Community
Dev. Cluster
Council
Speaker Chief Whip
Oversight
Committee (Sec
79)
Oversight
Committee
(Sec 79)
Oversight
Committee
(Sec 79)
Oversight
Committee
(Sec 79)
Oversight
Committee
(Sec 79) - 4
Executive
Portfolio
Committee
(Sec 80)-
Executive
Portfolio
Committee
(Sec 80)-
Executive
Portfolio
Committee
(Sec 80)
Executive
Portfolio
Committee
(Sec 80)
Executive
Portfolio
Committee
(Sec 80) -
Executive
Portfolio
Committee
(Sec 80)
Standing Committee,(Rules, SCOPA, Ethics, Programming, Petitions & Public Participation and Audit
Oversight
Committee
(Sec 79) - 5

79
2.2.2 Administration development/arrangement

There is a significant relationship between an IDP and the institutional arrangement. The municipality
can not implement its IDP effectively without proper organizational structure. As a result, the
municipality has approved the revised organizational structure on 8 August 2014, Resolution A (6) in
line with the 2014-2015 IDP. The approved organizational structure will also be amended to align with
the 2015-2016 IDP. Table 2.2.2 below indicates the top layer of the organizational structure.

79

Figure 2.2.2: Organogram of Mbombela Local Municipality

80

Most of the positions from the above organisational structure have been filled. Table 2.2.2 below gives
a summary of the status quo of the positions in the organisational structure.

Table 2.2.2: Status of the positions in the organizational structure
Item Status Quo Future plans
Total number of posts per
organizational structure (funded)
2088 Only vacant and funded positions will be
filled during this financial year.
Number of posts filled
(also reflect Sect 57 Managers)
1540
Sect.57 = 05
Total 1545
The reviewed organizational structure
makes provision of 2 new Section 57
Managers, which will be filled during the
course of this financial year.
Number of posts vacant
(also reflect Sect 57 Managers)
540
Sect. 57 = 03
Total 543
Recruitment and Selection is ongoing.

% of staff that are women 37,28% Management positions are targeted to
women candidates.
% of staff that are persons with
disability
0.61% Resolved to target designated groups
during recruitment. Employment equity
plan targets are finalized.
The municipality is currently in the process of appointing a qualified service provider to do an overall
Organisational Review which will include the development of a comprehensive Human Resources
Strategy aligned to the IDP and long-term vision of the municipality. The objectives of the
Organisational Review are:
? diagnose and define the status quo of the municipality, its current structure, systems,
processes and its alignment to the vision, mission and the IDP.
? confirm defined roles and responsibilities for management and key organizational
functions.
? analyze skills and competencies of managerial staff and their placement and utilization.
? analyze possible skills gaps and recommend remedies for same and draft individual
Personal Development Plans.
? conduct an organizational culture analyses and develop a change management
strategy.
? develop a comprehensive human resource strategy for MLM to ensure alignment with
the IDP and long-term vision of the municipality.
? analyze internal communication and recommend communication strategies to ensure
effectiveness.
? conduct a financial system compliance analysis with the view to bring control to
minimize fraud and corruption.
A TASK Job Evaluation project is underway and will ensure that all job descriptions are updated and
that all post levels are correctly placed in the organogram and salary curve. On the other hand, a
Performance Management System (PMS) for non-section 56/57 employees was developed and will be
cascaded to lower levels in a phased approach to ensure recognition of good performance and to
establish development gaps which might exist.

The municipality through the Training and Skills Development Section has the Workplace Skills plan in
place. The plan is aimed at responding to the capacity challenges of the municipality.

81

The municipality has a draft Retention Strategy that still needs to go through administrative processes
before tabled before Council for approval. The purpose of this strategy is to outline the mechanisms,
tools and strategies that can be applied at MLM to retain critical, scarce and high risk skills, whichever
is applicable. The primary emphasis of this strategy is to ensure that the Municipality proactively retains
employees to ensure that the Municipality has the best, well trained and suitable employees occupy key
positions at all times.
The municipality has approved the Recruitment, Selection and Induction policy. The objective of the
policy is to provide for a comprehensive policy which accommodates the need for staff provisioning in
the most efficient, professional and cost-effective way as to the effect that:
? No unfair discrimination practices exist in the provisioning discipline of Council;
? Such policy contributes and enhances a diverse culture and environment whereby all staff can
contribute to the goals of Council and where such staff make-up is representative of the
demographic environment of the area it serves.
? Introduction of fair and objective principles and procedures for that staffing of the employer.
? Provision of guidelines for the appointment of candidates to the employer.
? Establishing principles and procedures insuring that the Employer complies with legislative
principles in respect of employment equity and affirmative action.
? Setting out the procedural steps for the advertisement of a vacant post, the selection of
applicants for interviews, the conducting of interviews and the appointment of candidates to the
permanent staff of the Employer.

Apart from the above mentioned policies, the municipality has approved the following policies
associated with institutional development, namely, employment equity policy, adult basic education
policy, promotion policy, internal and external bursary agreement policy, acting allowance policy, long
service award policy, sexual harassment policy, experiential training policy, Work attendance and
absenteeism management policy and policy on the attendance of Local Labour Forum Meetings by
members.

In order to strengthen intergovernmental relations, the municipality has established Integovermental
(IGR) unit. Its primary objective is to facilitatate intergovernmental dialogue with relevant provincial and
national government. Moreover, the unit also creates a conducive working relationship of the
municipality with the district municipalities and other stakeholders.

The municipality has an Information Technology (IT) and Information Systems (IS) department,
collectively known as Information and Communication Technologies (ICT). The department is
responsible for providing the necessary tools to the various departments to fast track service delivery
while providing citizens and other stakeholders quicker and easier access to municipal services from
anywhere and at any time. The following are the key functional areas of the ICT department:

? Corporate ICT Governance and Strategy.
? E-Govt. services including website and intranet.
? Servers, Network Systems & Desktop Maintenance.
? Application Systems Development and Maintenance.
? Infrastructure and Information Management Solutions & Systems including Research and
Project.
? MIS/BI/GIS & Networking
? Disaster Recovery, Business Continuity and ICT Security.

82

2.2.3 Sector Plans and Policies Status Quo

The municipality has developed sector plans in order to effectively achieve its priorities and objectives
and comply with relevant legislation such as MSA, MFMA, NEMA and others. Table 2.2.3 below
outlines sector plans that have been developed for service delivery and compliance purposes.

Table 2.2.3: Mbombela sector plans and policies
Sector Plan/Strategy Status Qou
Spatial Development Framework ? Approved, 2012
Local Economic Development Strategy ? Draft, to be approved, 2014/2015
Rural Development Strategy ? The municipality is in process to develop, 2015/2016
Tourism Sector Plan ? The municipality is in process to review, 2015/2016
Housing Plan (Charter) ? Draft, to be approved, 2014/2015
Integrated Housing Plan ? Approved, 2011
Integrated Transportation Plan ? Approved 2010, to be revised, 2014/2015
Land Use Transportation Plan ? Approved, 2011
Integrated Waste Management Plan ? Approved, 2010, to be reviewed in 2015/2016
Comprehensive Infrastructure Plan ? The municipality is in process to develop, 2014/2015
Master Plan for Water-borne Sanitation in Nsikazi ? The municipality is in process to develop, 2014/2015
Bulk Water Supply Strategy ? Approved, 2012
Water Infrastructure Maintenance Plan ? The municipality is in process to develop, 2014/2015
Water Asset Management Plan ? Asset register is available the municipality is in process
to review
Roads Master Plan ? Draft, to be approved, 2014/2015
Asset Management Plan for Roads & Storm water ? Draft, to be approved, 2014/2015
Water Services Development Plan ? Approved 2010. To be reviewed in 2014/2015
Water Master Plan for Nsikazi ? Approved, 2010
Water Master Plan for Hazyview & White River ? Approved 2007. To be reviewed in 2014/2015
Storm Water Master Plan for Nsikazi ? Approved, 2009
Maintenance & Refurbishment Plan ? Approved, 2011
Maintenance plan & water safety plan ? Approved, 2011
Consolidated Water Master Plan ? Approved, 2011
Guidelines for access to street networks Mbombela ? Approved, 2000
Maintenance of road reserves ? Approved, 2004
Environmental Management Plan ? The municipality is in process to develop, 2014/2015
Electrical Infrastructure Master Plan ? Draft being revised due to new strategic developments
& Eskom considerations, 2015/2016
Demand Side Management (DSM)_ Rename ‘ Energy
Management Strategy’
? The municipality is in the process to develop, 2016/17
Electrification Master Plan ? Draft being revised due to new Integrated Human
Settlements & Eskom considerations, 2015/16
Workplace Skills Plan ? The municipality is in process to develop, 2014/2015

83

Sector Plan/Strategy Status Qou
Disaster Management Plan ? Approved, 2008 to be reviewed in 2014/2015
Fraud Prevention Plan ? Approved, 2013
Development of Migration and management of
informal settlements strategy
? The municipality is in the process to develop, 2014/2015
Development of housing gap market strategy ? The municipality is in the process to develop, 2014/2015
Policies Status quo
Human Resources Strategy ? The municipality is in the process to develop, 2014/2015
Public participation Strategy ? Approved, 2011
Paving policy ? Approved, 2003
Provision of Traffic Calming Measures Policy ? Approved, 2012
Supply Chain Management ? Approved, 2012
Budget Policy ? Approved, 2013
Credit Control and Debt Collection Policy ? Approved, 2013
Petty-Cash Policy ? Approved,2013
Indigent Policy ? Approved, 2013
Tariffs Policy ? Approved, 2013
Investment Policy ? Approved, 2013
Funding and Reserves Policy ? Approved, 2013
Virement Policy ? Approved, 2013
Rates Policy ? Approved, 2013
Asset Management Policy ? Approved, 2012
Revenue Enhancement Strategy ? Approved, 2012
Selection and Induction Policy ?Approved, 2008
Acting allowance policy ?Approved, 2008
Overtime policy ?Approved, 2013
Skills retention policy ?Draft, to be approved, 2014/2015
Promotion policy ?Draft, to be approved, 2013/2014
Paid work performed outside the municipality ?Approved, 2009
Risk Management Policy ? Approved, 2012/2013
Employment Equity Policy ?Approved ,2011/2012
Telephone Policy ?Approved, 2011/2012
Housing allocation policy ? Approved , 2011
Housing , management and control of informal
settlements policy
?Approved , 2011
Alienation & acquisition of municipal properties policy ?Approved , 2011
Attendance and absenteeism Policy ?Approved, 2013
Policy on attendance of the Local Labour Forum
Meetings by relevant members and officials
?Approved, 2013
The approved sector plans and policies listed above, can be accessible on the municipal website:
www.mbombela.gov.za

84

SECTION B: ENVIRONMENT PROFILE

2.3 GEOGRAPHIC LOCATION
Mbombela Local Municipality (Swati: A lot of people together in a small space) is one of the
municipalities of South Africa, located in the Ehlanzeni District Municipality, Mpumalanga province. The
municipality was formed in 2000 by the merger of Hazyview, Nelspruit and White River Local Councils.
The municipality is situated in the North Eastern part of South Africa within the Lowveld sub region of
the Mpumalanga Province. Refer to figure 2.3a, b and c for location maps.

Figure 2.3a: National and Provincial context

Source: MLM SDF, 2012

Figure 2.3b: District context

Source: MLM SDF, 2012

85

Figure 2.3c: Local context

Source: MLM SDF, 2012

The metropolitan areas of Pretoria and Johannesburg are located 320 km inland, with the border post at
Komatipoort approximately 120 km to the east and the Mozambican coastline being around 200 km
away and 55 km from the famous Kruger National Park. Urban areas in Mbombela include Mbombela,
White River and Hazyview as well as former homelands towns such as Kabokweni, Kanyamazane and
Matsulu.

The municipality is the capital city of the Mpumalanga province and the head office of the provincial
government (legislature). The location and its status of a capital city provide the municipality with a
competitive advantage as a corridor for growth and development. The city has two airports, Kruger
Mpumalanga International Airport to the north east, and the general aviation Mbombela Airport to the
south west. Kruger Mpumalanga is used for scheduled flights to Johannesburg and, less frequently, to
Cape Town and other cities.

It is also a home of the Government Research Institute for Citrus and Subtropical Fruits, and the
Lowveld Botanical Gardens. Mbombela is a major stopover point for tourists travelling to the Kruger
National Park and to Mozambique.

2.4 MUNICIPAL PLANNI NG ZONES AND WARDS

The municipality is made up of 39 wards as per the new municipal dermacation, and 5 planning zones
for the purposes of administration and management. The zones include Mbombela A, Mbombela B,
Mbombela C, Hazyview and Nsikazi. The municipal wards increased from 36 to 39 and part of Kruger
National Park fall within the municipal area as part of ward 39. Table 2.4 and figure 2.4 below show the
municipal zones and wards.

86

Table 2.4: Municipal zones and wards
No. Municipal Zone Wards
1. 1. Mbombela A 12,14,15,16,17, 30 & 38
2. 2. Mbombela B 2, 4, Part of 10, Part of 21, 22, 23, Part of 24, 26, 29 & Part of
34

3. 3. Mbombela C 13, 18, 19, 20, Part of 21, 27, 28 and Part of 39
4. 4. Hazyview 1, 3, 5, 6, 7, 8, 9, 25, Part of 34 and Part of 39
5. 5. Nsikazi 10,11,31,32,33, Part of 34 35,36, 37 and Part of 39
Source: MLM SDF 2012

Figure 2.4: Municipal planning zones

Source: MLM SDF, 2012

87

2. 5 DEMOGRAPHIC OVERVIEW
2. 5.1 Population size

The distribution and characteristics of population has an impact on many facets of life. It affects the
area where people live and the prices of the goods and services including basic services delivery that
the municipality must provide as enriched in the Constitution.

According to Census 2011 results, MLM has the population of 588 794. This population constitutes 35%
of the entire population of Ehlanzeni District. Hence, MLM is the most populous municipality in
Ehlanzeni District (Stats SA, 2011). With regards to the municipality’s population trends over the past
15 years, the municipality has been one of the fastest growing municipalities in the district (refer to
figure 2.5.1 below).

Figure: 2.5.1: The population distribution in Ehlanzeni district area

Source: Stats SA, 1996, 2001 and 2011
MLM has recorded annual population growth rate of 1.13% between 1996 and 2001. However, the
municipality has grown at 2.11% per annum between 2001 and 2011 (Stats SA, 2011). These trends
can be attributed to the municipality’s economic potential to attract people from other countries,
provinces and municipalities. According to Census 2011, MLM became destination for about 40, 67% of
all immigrants coming into Ehlanzeni District municipality. The municipality will in the 2015/2016
financial year develop a strategy to manage the challenge of migration.

88

2. 5. 2 Number of households
The number of households is one of the crucial indicators related to service provision in the
municipality. Most of the services the municipality provides are at the household level, rather than
individual level.
According to Stats SA, 2011 results, the municipality has recorded rapid increase in the number of
households in the past 15 years. The results reveal that the municipality has a total of 161, 773
households. This is an increase by 24,420 between 2007 and 2011, while the number has increased by
69 961 in the past 15 years.
When looking at the average household size, the municipality has recorded a decline from 4.46 in 1996
to 3.69 in 2001 and down to 3.59 in 2011. This implies that the unbundling of households, which results
in increase in the number of households in the municipality (Refer to figure 2.5.2 below).
Figure 2.5.2: Number of households from 1996 to 2011

Source: Stats SA, 1996, 2001, 2007 and 2011
The increase in the number of households has an impact in the planning and development of the
municipality. This in other words means that the municipality must earmark land for residential
development in order to accommodate those who will need the space to live. The increase in the
number of households also has direct impact on the provision of housing as well as basic services like
electricity, water and sanitation.
2. 5. 3 Age and sex composition
Age and sex are the most basic characteristics of a population. Every population has a different age
and sex composition. The number and proportion of males and females in each age group have
considerable impact on the population’s social and economic situation, both present and future (refer to
table 2.5.3 below).

89

Figure 2.5.3: Age and sex composition
Description Years
1996 2001 2011
Age 0-14 36.36% 34.55% 29.83%
14-35 (youth) 40.59% 42.47% 43.49%
15-64 (economic active) 57.29% 61.49% 65.95%
65+ (elderly) 6.3% 3.96% 4.22%
Gender Female 52% 52.26% 51%
Male 48% 47.74% 49%
Sex ratio 93% 91.53% 94.29%
Source: Stats SA, 2011
The above table shows that MLM has relatively young population. The table shows that 73.32% of the
municipality’s population is aged between 0 and 35 years. However, the municipality has experienced a
decline in the percentage of people under the age of 14 years between 1996 and 2011, while the
population of youth has recorded increases. This presents challenges regarding services like the
provision of early childhood development services and care, education, sports development and job
creation opportunities. This was also confirmed during the IDP community consultative meetings where
the majority of wards raised the need for local economic development programmes and multipurpose
centres.

With regard to sex composition, the municipality has recorded that females have been in majority since
Census 1996 to the most recent Census conducted in 2011, although the gap has closed down a bit
between 2001 and 2011. This has also been quantified by the sex ratios. There have been fluctuations
in sex ration between the three Censuses. In 1996, the sex ratio was 93 males for every 100 females.
This dropped to 92 in 2001 and then up to 94 males per 100 females in 2011.
2. 5. 4 Racial profile

The municipality is dominated by African (Black) people. According to Stats SA, 2011, 89, 40% are
Africans (Blacks) followed by whites (8.74 %). Coloureds constitute 0.95% while Indians/Asians
constitute 0.72% (Refer to figure 2.5.4 below).

90

Figure 2.5.4: MLM racial profile

Source: Stats SA, 2011

Linked to the race, the dominating language is SiSwati, followed by Afrikaans and English respectively.
The dominance of African people who are speaking Siswati forced the municipality to approve a
language policy which gave provision for the translation of key strategic documents such as IDP,
Budget and Service Delivery and Budget Implementation Plan (SDBIP) into Siswati. The primary of
objective is to ensure that the majority of people understand the core business of the municipality.

2.5. 5 Persons living with disability

According to Stats SA, 2011, the municipality has 5, 32% of people with disability. The percentage has
declined from 5, 84% in 1996 to 5,32% in 2001. However, the disability unemployment rate has
increased from 32, 03% to 38,28% in 1996 and 2001 respectively. The municipality under Transversal
Services unit has programmes aimed at assisting and empowering special targeted groups including
people with disability. Refer to 2.8 for further information.

2. 5.6 Employment profile and income

Employment is one of the indicators that could tell of the municipality’s ability to generate revenue.
Unfortunately, the municipality has high percentage of people who are unemployed. However, the
picture is improving as the unemployment rate has decreased from 37.77% in 2001 to 28.14% in 2011.
Unemployment is high amongst youth, women and persons with disabilities (Refer to table 2.5.6 below).

91

Table 2.5.6: Unemployment rates from 1996 to 2011

Unemployment rate
(strict definition)

Age Years %
General (15-65 years)

1996 28.72
2001 37.77
2011 28.14
Persons with Disability(15-65 years)
1996 32.03
2001 38.23
Women(15-65 years)

1996 38.11
2001 46.13
2011 33.47
Youth(15-35 years)

1996 35.30
2001 46.15
2011 36.76
Source: Stats SA, 1996, 2001 and 2011
The implementation of the Local Economic Development (LED) programmes, Extended Public Works
Programme (EPWP) and Community Works Programme (CWP) become important in the municipality’s
efforts to create job opportunities to the communities including women, youth and people with disability.
Moreover, it is anticipated that the LED strategy and Spatial Development Framework (SDF) will also
assist in identifinancial yearing key areas that the municipality can invest more money in capital projects
that will create the job opportunities.

With regards to individual income, majority (43.23%) of people in the municipality does not have income
at all. This is an increase from 42.6% recorded in 2007. The highest percentage with income has been
recorded in the income bracket of between R801 and R1600 per month. The percentage decreases
with the increase in income (Refer to table 2.5.6 below).
Table 2.5.6: Individual income from 2007 to 2011
Individual
Income levels
Number of individuals % Number of individuals %
Year “2007” Year “2011”
No income 222,666 42.60% 236727 43,23
R 1 - R 400 113,409 21.70%
116445 21,26
R 401 - R 800 38,245 7.32%
18532 3,38
R 801 - R 1 600 64,225 12.29%
66048 12,06
R 1 601 - R 3 200 24,311 4.65%
39342 7,18
R 3 201 - R 6 400 17,524 3.35%
23947 4,37
R 6 401 - R 12 800 18.027 3.45%
21822 3,98
R 12 801 - R 25 600 9.817 1.88
15924 2,90
R 25 601 - R 51 200 2,692 0.51%
6139 1,12
R 51 201 - R 102 400 612 0.12%
1527 0,27
R 102 401 - R
204 800
230 0.04%
633 0,11
R 204 801 or more 67 0.01%
481 0,08
Total 522,722 100%
547567 100%
Source: Stats SA, 2007 & 2011

92

The municipality’s indigent register policy will also assist people who are unable to pay for services.

2. 5. 7 Education attainment

Education is one of the indicators that depict the level of development as well as potential for one to
have better chances of employment; hence the contribution to personal capacity as well as
development of the municipality.

The municipality has recorded decreases in the population with no schooling, while the population with
matric only and those with matric and higher qualifications have increased over the past 15 years (Refer
to figure 2.5.7 below).

Figure 2.5.7: Level of education

Source: Stats SA, 1996, 2001 and 2011

The reason for the increases in no schooling might be caused by the fact that education has been
identified as one of the top 5 national priorities for government in the medium term period. The
Department of Education has introduced programmes to encourage young people to take education
very serious including those that are in remote rural areas. The municipality is also offering bursaries to
students who have passed matric and are interested in furthering their studies.

On the other hand, poverty and lack of access to educational facilities might be a contributing factor for
no schooling as well as the low level of tertiary education. This was confirmed during the IDP
consultative meetings when most wards raised the need for additional schools (primary and secondary)
and tertiary institutions to increase access of education in the municipality. The establishment of the
university in the province specifically within the Mbombela municipal area will encourage those that
have passed matric to further their studies.
According to the Mpumalanga Department of Education, the municipality has 151 public primary
schools, 59 public secondary schools, 25 independent (private) schools and 5 tertiary institutions.
Comparing the number of educational facilities and the total population of 588794, it is clear that there
is a need for the provision of schools in the municipality. The municipality must allocate land for
educational purposes in terms of the Spatial Development Framework and that should also be linked to
the infrastructure master plans for water, roads and electricity.

93

2.6 BASIC SERVICES DELIVERY

Like any other municipality in the country, MLM is faced with service delivery backlogs. Table 2.6 below
outlie the service delivery or infrastructure indicators between 2001 and 2011.

Table 2.6: Service delivery indicators
BASIC SERVICE INFRASTRUCTURE INDICATORS STATS RESULTS
2001 2011
% of households with no toilets or with bucket system 11.1% 8.0%
% of households with connection to piped (tap) water: on site &
off site
86.5% 77.9%
% of households with electricity for lighting 72.3% 90.7%
% of households with weekly municipal refuse removal 25.0% 29.4%
Source: Stats SA, 2011 & Sero Report, 2013
The above table shows that there is an improvement in the level of services between 2001 and 2011,
particularly on access to electricity and refuse removal. Items 2.6.1 to 2.6.4 below give the detailed
analyses per basic service.
2.6.1 Water
The current water backlog is 31 710 households. In terms of Stats SA, 2011, the number of households
with access to water (connected to stand pipes, on site and off site) has decreased from 86.5% in 2001
to 77.9% in 2011. This might be attributed to the rapid growth of the population over the past 10 years
from 2001 until 2011 where the population has increased from 476 903 to 588 794 (Stats SA, 2001 &
2011). On the other hand, it might be due to the mushrooming of informal settlements in the municipal
area caused by MLM being the economic hub of the province.
The municipality has managed to reduce the water supply backlog from 35 752 to 31 710 between 2011
and 2013 (18.8%). Figure 2.6.1 below show detailed information on the access to pipe water.

94

Figure 2.6.1: Access to pipe water
No access to piped (tap) water
22,1%
Source: Stats SA, 2011
The above figure shows that the municipality has done well in ensuring that people get access to water
pipes in their yards. About 64.8% of the households do have water pipes in the yard, 22.1% do not have
access to water pipes and 13.1% access water on a communal stand. Figure 2.6.2 shows the status of
water supply in the municipality per ward.
Figure 2.6.2: Status of water supply per ward
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
W
a
r
d

1
W
a
r
d

2
W
a
r
d

3
W
a
r
d

4
W
a
r
d

5
W
a
r
d

6
W
a
r
d

7
W
a
r
d

8
W
a
r
d

9
W
a
r
d

1
0
W
a
r
d

1
1
W
a
r
d

1
2
W
a
r
d

1
3
W
a
r
d

1
4
W
a
r
d

1
5
W
a
r
d

1
6
W
a
r
d

1
7
W
a
r
d

1
8
W
a
r
d

1
9
W
a
r
d

2
0
W
a
r
d

2
1
W
a
r
d

2
2
W
a
r
d

2
3
W
a
r
d

2
4
W
a
r
d

2
5
W
a
r
d

2
6
W
a
r
d

2
7
W
a
r
d

2
8
W
a
r
d

2
9
W
a
r
d

3
0
W
a
r
d

3
1
W
a
r
d

3
2
W
a
r
d

3
3
W
a
r
d

3
4
W
a
r
d

3
5
W
a
r
d

3
6
W
a
r
d

3
7
W
a
r
d

3
8
W
a
r
d

3
9
STATUS OF WATER SUPPLY
Total No. of HH HH Served HH not Served

Source: MLM Baseline Study 2012
The challenge of water shortage in the municipality, is exacerbated by inadequate bulk water supply
and high level of illegal connections on the bulk water supply. However, the municipality is in the
process of finalising the bulk water strategy which will address the problems of bulk in the municipality.
The implementation of water demand and management strategy will also assist in managing the water
lossed in the municipality.

95

2.6.2 Electricity
The current electricity backlog is 15 180 households, and the number of households with access to
electricity is 147 259. In terms of Stats SA, 2011, the number of households with access to electricity
has increased from 72.3% in 2001 to 90.7% in 2011. This shows a huge improvement in the supply of
electricity in the municipal area.
There are other areas which still need electricity, particularly in the rural areas. The municipality in
partnership with Eskom is in the process of upgrading existing power stations in order to cater for all the
areas within the municipal area.
Moreover, the municipality is in the process of developing a master plan on streets or public lighting
which will address the challenges of street and hight masts requested by the communities during the
IDP consultative meetings.

2.6.3 Sanitation
The current sanitation backlog is 62 409 households. In terms of Stats SA, 2011, the number of
households with no proper sanitation has decreased from 11.1% in 2001 to 8% in 2011. The backlog
has now decreased from 64 709 in 2011 to 62 409 which equates to 40%. Apart from the decrease, the
majority of households still use pit toilets without ventilation. Figure 2.6.3 below show the municipality’s
sanitation status in 2011.

Figure 2.6.3: Status of sanitation, 2011
None 7,2%
Pit toilet without
ventilation 43,6%
Bucket toilet 0,8%
Other 1,4%

Source: Stats SA, 2011
The above figure shows that 43.6% of the households use pit toilets without ventilation, 33.8% use flush
toilets and 13.3% use pit toilets with ventilation. Due to the fact that the municipality comprise of rural
and urban, flush toilets are mostly used in the urban areas whereas the pit toilets are used in the rural
areas which has been previously disadvantaged. During the previous financial years, the municipality
focused on upgrading water treatment works plants in order to ensure that water is available in all the
areas. Henceforth, the municipality will prioritise bulk sanitation infrastructure in order to convert the pit
toilets into water borne sewer, particularly in the rural areas.

96

2.6.4 Refuse removal /waste management

In terms of Stats SA, 2011, the number of households that receives weekly municipal refuse removal
has slightly increased from 25% in 2001 to 29.4% in 2011. It must be noted that the increase is only
applicable in areas where the municipality is rendering services, which is the urban areas.
However, the municipality is currently in the process of extending the waste collection service to the
rural areas and informal settlements, and a feasibility study is underway in this regard. Moreover,
transfer stations in White River, Hazyview, Kabokweni and Matsulu will also be established.

The municipality is currently reviewing the Intergrated Waste Management Plan and compiling section
78 investigation reports as per the requirement of the new National Environmental Management: Waste
Act 39 of 2008. Waste minimization and recycling are being institutionalised to reduce the tonnage of
waste reaching the landfill sites and subsequently creates jobs for those who are interested to
participate in recycling program.

2.6.5 Roads and Storm water

An integrated road network is one of the main drivers of economic development and spatial integration
in Mbombela. Currently, there are ± 539 km of municipal tar and paved roads and ± 2005km of
municipal gravel roads. The municipality has compiled an Asset Management Plan and Asset register
for streets and storm water to guide and manage all the streets in the municipal area.

The municipality also has a Roads Master Plan (RMP) which is updated annually to cater for the
completed and new developments. The new university, ICC, Urban renewal project in Tekwane , Nkosi
City and fresh produce market will have a significant influence on the traffic, therefore the plan will also
be updated to cater for that. Table 2.6.5 below gives estimated.

Table 2.6.4: Estimated amounts required to tar gravel roads and to upgrade existing tar roads in
Mbombela
No Plan Area Amount
1. Roads Master Plan Mbombela R2 513 million
2. Tar all gravel bus roads Nsikazi (154 km) R924 million
3. Tar all gravel Bermuda Roads Nsikazi (31 km) R186 million
4. Tar all other gravel roads Nsikazi (1774 km) R8 870million
Total R13, 724 billion
Source: MLM Roads and Stormwater Section, 2014

Approval is provided to increase the density or rights of areas without upgrading the services, and this
result in the decrease of the efficiency of the services. For example, the extension of the Mbombela
CBD; roads are congested, storm water pipes are too small and people are parking on sidewalks
instead of on the stands (no place for pedestrians to walk). A master plan is required to upgrade all the
services to accommodate all the developments in the future.
The intensity of the rainfall has increased over the past few years and storm damages are increasing
annually. In future, a catchment management strategy will be complied after the finalisation of 1:100
year flood-lines which is in progress for all the rivers and streams in the municipality. The 1:100 year
flood-lines for Mbombela and Kanyamazane are completed, Msogwaba in process and the balance will
be done in future depending of the availability of funds.

97

There is also an urgent need for attenuation ponds in the municipality to decrease the high volumes of
stormwater in the streams and many streams must be rehabilitated.
About R250 million is required for the Nsikazi storm water master plan and R981 million is required for
the 104 pedestrian bridges in Nsikazi.
2. 6.6 Transport
The Municipality Integrated Transport Plan was approved by Council on 16 October 2007, as per
Council Resolution A (8) (b). According to the Municipal Integrated Transport Plan, public transport
services in the Mbombela Local Municipality are provided by means of buses and minibuses (taxis) of
which three quarter of the people are using buses. BusCor is by far the major bus operator and minibus
taxis operating within the municipality are ranges from 750 to 1000.
The following are the peak period screen line occupancy counts, namely, in the morning peak, 80% of
all person trips are in public transport. This high percentage of public transport users might be as a
result that 59% of the population as indicated under household income earn less that basic of R 1 600
per month resulting in non affordability to acquire private transport. The distance between areas of work
at Mbombela / White River/ Rocky’s Drift Corridor is also a contributing factor to the increased demand
for public transport compared to usage of private vehicles.

The municipal SDF indicates that most people from the Eastern Development Corridor travel almost two
hours daily from home to work. The SDF suggest that jobs must be created closer to people’s homes
or low cost housing be developed closer to place of work to reduce long travelling hours.

Figure 2.6.6a: AM Peak Period in Mbombela
Nelspruit AM Peak Period
19%
21%
60%
Private Taxi Bus

Figure 2.6.6b: AM Peak Period in White River/Rocky’s Drift

98

White River/ Rocky's Drift AM Peak Period
21%
15%
64%
Private Taxi Bus

The bus and taxi ranks in Mbombela are well located in the Mbombela CBD in the close proximity to
each other at the north east of the CBD. Both ranks require additional capacity and land has been
acquired for future expansion. In terms of White River, both ranks are about 1km apart making it
inconvenient for commuters to travel between the two ranks.

The Hazyview taxi ranks are currently being consolidated so that all taxis can operate in one rank.
Buscor is also intending to move the current rank, although the issue of land availability is a major
concern. Not all public transport routes are tarred or paved and accessibility to service centres is
restricted in some areas. There is also a need for bus shelters at major loading points.

Mbombela is through 2010 FIFA World Cup learned the good ways of managing the transportation
programs such as park and ride and controlling the metered taxi. These lessons learnt will be populated
in the Transportation Strategy and ensure the improvement in the transportation industry. Mbombela
will first establish the Transport Management Unit to deal with the following strategic matters:
? Management and control of the taxi industry
? Management of all Taxi and Bus Termini
? Conducting the local Transportation Liaison Forum
? Coordinating all transportation related matters.

Moreover, the above matters are being addressed through the Integrated Public Transport Network
Programme implemented by the municipality as per its new mandate enhriched in the National Land
Transport Act, 2009.

99

2. 7 SOCI AL AND COMMUNITY DEVELOPMENT
2.7.1 Community facilities

There is a need to provide more community halls for community meetings and other social functions.
Art galleries, cultural centres and theatres are needed for the development and promotion of arts,
culture and heritage within the municipality area. Community halls are currently an option for such
activities. Moreover, there is a need to develop proper sport fields in the rural areas. In as far as
libraries are concerned, Mbombela B has the highest population compared to the other 3 zones but only
two (2) libraries are available of which one (1) is under the provincial government. The library that is
under the municipality is based at the Matsulu Service Centre. Most of the wards during IDP
consultative meetingss have indicated the need for more community halls, sports facilities, parks and
recreational facilities.

Table 2.7.1: Existing public amenities per zone
Amenities Total
Amenities
within the
Municipality
Average Status
quo/Conditions
of the existing
Amenities
Municipal Zones
Hazyview Mbombela
A
Mbombela
B
Mbombela
C
Nsikazi
1.Community Halls 25 10 good, 7 fair,
and 8 poor,
2 7 6 5 5
2.Cultural Centres 1 Fair 0 0 0 1 0
3.Theatres/ Amphi
theatre
2 1 fair, 1 poor 0 2 0 0 0
4. Art Gallery 1 1good 0 1 0 0 0
5. Libraries 10 8 good, 2 fair 2 3 2 0 3
6. Sports Fields 9 7 fair, 2 poor 1 4 2 0 2
7.Swimming Pools 5 3 good, 2 poor 2 3 0 0 0
8. Multi Purpose
Sports Courts
7 2 good, 1 fair and
4 poor.
2 2 3 0 0
Total 62 - 9 22 13 6 10
Source: MLM Social Development Unit, 2013
Eight (8) of the community halls as well as the amphitheatre need major renovations in order to bring
them to a good standard that will make them user friendly to the communities. These halls include
Elandshoek community hall (which needs reconstruction), Makoko community hall, Luphisi community
hall, Daantjie community hall, Nsikazi/Khumbula community hall, Matsulu B community hall, White River
community hall and Oewersig hall. The plan is to upgrade 2 of these community facilities per year
depending on funding to cover the backlog. The process will involve engagements with the Traditional
Authorities, where applicable, through the relevant Ward Councilors since some of these facilities fall

100

under the Traditional Authorities. Six (6) of the community facilities including the Silulu Cultural Centre
as well as the Mbombela Civic Theatre are in need of minor renovations.

2. 7.2 Sport development
The municipality has Sports Development Unit which is responsible for the promotion of all sporting
codes in collaboration with the relevant stakeholders including the associations. The communities are
participating successfully. Currently, the Soccer sporting code is seen to be dominating due the interest
of the communities. The Unit is seen spending more time in maintenance programs of the infrastructure
from sports field, swimming pools, tennis courts etc. This has been identified as a course for concern to
be addressed.
MLM has been fortunate to inherit the infrastructure which was developed for the 2010 FIFA World cup
such as Kabokweni and KaNyamazane Stadiums. It should be outlined that the state of the art
Mbombela Stadium was beautiful during the world cup and is still well maintained currently. The other
associations locally have been are working with Mbombela on other sporting codes in an uncoordinated
manner.
MLM is a tourist point for most people visiting the Mpumalanga province. Since Mbombela hosted the
World Cup successfully, everybody wishes to visit the city. Due to that, other associations have
expressed interest in investing on sporting codes. Therefore, a strategy on how to explore this
investment opportunities to the best interest of the local citizens will be developed. This will be done in a
coordinated manner and within the perimeter of the law.
The municipality has been successful to obtain funding from LOTTO to upgrade certain sporting
infrastructure. This will create a conducive environment to the youth and those interested to participate
in sports. The council will also develop a strategy which will talk to the systems that must be put in place
to deal effectively with Sports Academies and other Sporting Associations without any prejudice.
The municipality is participating in twining games and inter-governmental activities which involve other
municipalities and other countries such as Maputo and Swaziland. Such type of games serve as the
yardstick for different government spheres to come together share the work experiences and makes fun
through play. In future, the planning for twinning games will be coordinated through Communication and
IGR offices to involve all departments and to ensure that all interested employees participate. The
games will be used for social interaction and cohesion. Furthermore, a strategy will be developed to
enable all relevant stakeholders understand the need for the twining games and its impact on their
involvement.
Lastly, the municipality will develop a maintenance strategy of all sporting facilities to ensure that
facilities are properly maintained and effectively utilized for both Council and the communities.

2.7.3 Cemeteries and Open Spaces

The driving forces affecting cemeteries in the municipality are linked to socio-economic situations in the
area, interlinked with a high mortality rate. The high mortality rate in Mbombela in recent years resulted
in most of the cemeteries managed by the municipality reaching capacity sooner than anticipated.

Some cemeteries are located near riverbanks, springs or boreholes used by the communities as
potable water. This could impact negatively on the water quality, causing health problems such as
diarrhoea. On the other hand, they can could be damaged through floods or high rainfall storms.

101

The majorinty of the cemeteries are located in Mbombela, Tekwane, Matsulu, Msogwaba, White River,
Nsikazi, Makoko, and Phameni areas. Hazyview and Nsikazi zones have a multitude of rural
cemeteries, which are mostly full or nearly full, and due to the environmental impacts associated with
these cemeteries, the municipality in partnership with the Traditional Authorities is in the process of
identifying suitable land for the establishment of regional cemeteries.

Nsikazi and Mbombela B zones do not have any formal or informal cemeteries, and communities are
mostly relying on burial plots on farms (which are decreasing as a result of land claims) or they have to
go to formal cemeteries managed by the municipality which are very far from their place of residence.
The establishment of the proposed regional cemeteries as outlined previously seek to address some of
these problems. The municipality will also ensure that enough land is earmarked for cemeteries during
the development of the Spatial Development Framework (SDF) and Land Use Management Scheme
(LUMS).

The municipality is also maintaining closed cemeteries at Sonheuwel, Nelsville, Matsulu, Kabokweni
and KaNyamazane. The closed sites will be fenced and be maintained as monument for the protection
of the dead and ensuring that they are accessible by the family members for different cultural purposes.
The system to ensure that all the graves are properly recorded and accurate information is filed, the
electronic system will be introduced and an accurate data for all closed and new cemeteries will be
readily available in the system for any related correspondences. It is also anticipated that the bylaw on
cemeteries which is still a draft will assist to address the challenges associated with cemeteries in the
municipality.

With regard to open spaces, the municipality use open spaces for the creation of parks and
conservation of natural resources. Some areas require de-bushing to reduce alien plants and crime hot
spots in the municipality, while sidewalks requires cleaning/clearing and grass cutting. In the case of the
open bushy areas, interventions are sought in the form of appointing service providers to assist in this
regard.

Parks section is in the process of conducting an audit of all municipal parks and other parks for data
collection. The audit will also cover the information on the availability of the public facilities in all the
parks, the number of used graves per area, the amount of space available and the condition of graves.

2. 7.4 Public Safety (Crime, Road Safety, Fire & Rescue and Disaster management)

2.7.4.1 Crime

Crime has reached an unacceptable high level in certain areas of the municipality with Pienaar area
being the highest crime spot in the Ehlanzeni region. This is attributed to the lack of adequate police
stations and lack of capacity within the existing police force and inadequate access roads within the
municiaplity. According to the information received during the IDP consultative meetings, the lack of
street lights in most of the villages and certain environmental factors such as un-maintained parks,
cemeteries and dilapidated buildings are some of the aggravating factors to crime.

In terms of the report received from the Provincial Department of Community Safety, Security and
Liason (2013), the mostly high reported crime cases in the district are property related at 17.3%
followed by social fabric types of crime at 7.4% and lastly violence related crimes at 2.3%. An average
41021 number of people are served by one police station in the district and one police official serving
1000 people (ISDF2006). This ratio does not take into account other constrains like human resource

102

and other related resources. However, the department will be embarking on civilian oversight and social
crime awareness campaigns during the 2014-2015 financial year in order to advocate against crime.

The municipality also participate in the Multi Agency Mechanism (MAM) forum established at both
provincial and district level to deliberate on issues related to crime.

Moreover, the municipality has a Draft Safety Plan which outlines ways of dealing with crime with the
municipal area. The municipality has a toll free hot line for the residents to report any crime and
corruption related activities.

2.7.4.2 Road Safety

There is currently an average of 6581 accidents per annum and most of these accidents happen during
peak hours and after hours. This is confirmed by numerous wards’ that identified the need for visible
traffic policing, pedestrian and overhead bridges to assist in reduction of accidents within Mbombela.
There is also a need to deal with the current dilapidated road infrastructure and poor street lighting as
they are main contributing factors to road accidents and un-road worthy vehicles.

Currently, traffic law enforcement services are delivered through the deployment of Traffic Officers from
the following Service Centres:
? Mbombela (16 x Traffic Officers) (2 x Traffic Officers –Municipal Court Duties)
? White River (6 x Traffic Officers)
? Hazyview (6 x Traffic Officers)
? KaNyamazane (7 x Traffic Officers)

In terms of the criteria set by the CSIR for the employment of Traffic Officers, MLM should consist of
426 Traffic Officers to perform this function based on the following:
? Registered Vehicles;
? Population;
? Kilometre Road; and
? Through roads / National and Provincial roads.

The municipality has managed to appoint 37 Traffic Officers, thus a shortfall of 389. To ensure
maximum visibility and to render a sufficient traffic service more Traffic Officers need to be employed
and be provided with equipment such as traffic patrol vehicles, office accommodation, bulletproof vests,
firearms etc.

2.7.4.3 Vehicle registration and licensing

The Department of Roads & Transport has entered into an agreement with the municipality to render
the services in terms of the section 136 of the Constitution. As a result, the Licensing Unit renders is
currently providing services in Mbombela, White River and Hazyview in accordance with the Service
Level Agreement. The services are as follows:

? Mbombela Services: Registering Authority (RA), Driver’s License Testing Centre (DLTC),
Vehicle Testing Station (VTS);
? White River Services: Registering Authority (RA), Driver’s License Testing Centre (DLTC),
Vehicle Testing Station (VTS);

103

? Hazyview Services: Registering Authority (RA)

The Mbombela Centre is the busiest Centre in the municipality followed by White River and Hazyview. It
services not less than 10 000 people per month on various transactions. The Mbombela DLTCs has
vigorously put systems in place to curb or reduce fraudulent activities. For example, the electronic Natis
System introduced is able to track down the user. The Department of Community Safety, Security &
Liaison has provided the following assets to the municipality with an objective of advancing the service
in Mbombela DLTC:
? 4 X Heavy duty vehicle with computers for testing : Code 10 – 14 (C1- EC)
? 1 X Light motor vehicle with computers for testing : Code 8 (EB)
? 15 X computers for the learners testing (Computerized Learners Class)

The learners test is now conducted electronically through a touch screen computer in all official
languages whilst the driving test is conducted through a tablet that are attached to the electronic
vehicles which are provided at a free cost to the public. The Computerised Learners class has
increased the capacity of test conducted on daily basis from 16 applicants to 45 applicants per day.
After completion of the test, results are given electronically and are non- manipulated. It has been
observed positively that since the introduction of the electronic Natis System, the work has drastically
improved because the system is consistent. This can be evidenced by the severe reduction of
complaints from the public. It must further be noted that the demand of Licensing Services has
increased drastically nationally in the past years. The electronic queuing system was introduced in
Mbombela Centre in February 2011 and is working well. There is still a delay in obtaining driving license
test booking and currently the waiting period is 42 days.

In order to ease access to license services, the municipality is in the process of decentralising or
extending the services to the other Municipal Service Centres in Kanyamazane, Kabokweni and
Matsulu. The extension will be achieved through the following:
? Upgrading of White River Testing Centre to meet Best Practice Model Standard;
? Establishment of Satellite offices in Kanyamazane, Kabokweni, Mbombela Civic Centre and
Matsulu;
? Establishment of Testing Centre in Kanyamazane,
? Establishment of Testing Centre in Hazyview,
? Extension of queuing system in all centres;
? Eradication of fraud and corruption in the workplace.

2.7.4.4 Fire and Rescue

There are currently four (4) fire stations in the municipality, which are Mbombela, KaNyamazane, White
River and Kabokweni. Due to the high volume of accidents, the municipality needs to build more fire
stations in order to enhance ease assess and create a shorter response time to the accident scenes.
The targeted areas are Matsulu, Ngodwana and Hazyview. The Matsulu fire station has already been
budgeted for, and will be constructed in the 2014-2015 financial year.

There is also a need for communication systems that will assist the public to alert the Unit of any
emergency, particularly in rural areas. Road and water infrastructure are of concern, fire fighting
vehicles require lots of water to operate (extinguish fire) and a challenge is when the affected area does
not have enough water supply. Moreover, there is a need to replace outdated fleet and buy off terrain
vehicles.

104

2.7.4.5 Disaster Management

According to the status quo report of the Disaster Management Unit, about 47 000 households in rural
areas are without radio communication system coverage to alert the unit during disasters. Almost 39%
of the households have built houses on wet lines and flood lines which is a serious risk.

The unit does not have a fully fleshed Disaster Management Centre, and is relying on the assistance of
the District and Provincial centres. However, the municipality has entered into an agreement with the
Provincial Department of Co-operative Governance and Traditional Authorities (COGTA) to upgrade
Coouncil’s Disaster and Communications Centre.

The municipality also participate in the Disaster Management Forum where all issues related to disaster
are discussed, and a Disaster Management Plan will be development in the 2014/2015 financial year.

2. 7.5 Health

Mbombela has two (2) district hospitals which are Rob Ferreira and Themba, one (1) TB Hospital which
is Bongani, and three private hospitals. There are also 29 clinics that are providing health services, 2
are accredited and 27 are linked. Table 2.7.5 below shows the accredited and linked clins in Mbombela.

Table 2.7.5: The MLM accredited and linked clinics
Accredited clinic Linked clinic
Kanyamazane CHC Zwelisha, Msogwaba, Eziweni, Sibuyile, Tekwane, Luphisi, Mpakeni
Phola Nsikazi CHC Hazyview, Skukuza, Mthimba, Sandriver, Shabalala, Manzini, Legogote and
Jerusalem
Matsulu CHC Nkwalini and Kaapmuiden
Mbombela CHC Mbombela mobiles and Valencia/Nelsville
Bhuga CHC Clau-clau, Khumbula, Makoko, Mjejane
Kabokweni CHC Mbonisweni, Dwaleni, Gutshwa, Kabokweni/ White River Mobiles
Source: Department of Health, Ehlanzeni District Office, 2013

The newly opened clinic which is operating 24 hours in Mbombela CBD has provided health services
relieve to Rob-Ferreira Hospital which was always overcrowded.

2. 8 TRANSVERSAL SERVICES

The municipality has established a unit, “Transversal Unit” to deal specifically with issues related to
HIV/Aids, women, children, youth, disability, elders (senior citizens), traditional leaders and traditional
healers.

The Unit is aimed at achieving the following objectives:
• To bring forth transformation and mainstreaming all transversal issues, programmes and
projects (gender, children, disability, elderly, HIV/AIDS, youth and traditional healers );
• Advocate, monitor and evaluate the implementation of all transversal issues;
• Coordination and facilitation of all transversal programmes / projects;
• Manage the budget allocation for all transversal programmes /projects.

105

In complementing the above objectives, the Unit has identified nine (9) strategic priority areas and these
are as follows:
• Governance
• Economic Growth and Development
• Infrastructure Provision
• Social Services and Development
• Cross-Cutting Issues
• Institutional Transformation
• The Gender Management System
• The implementation of Masibuyele Emasimini Programme
• All Transversal Services related calendar events (support)

However, in making sure that Transversal issues are mainstreamed in the municipality programmes
and processes, Transversal Services have developed a consolidated draft Mbombela Transversal
Services policy informed by the National Youth Policy Framework, South Africa’s National Policy
Framework for Women’s Empowerment and Gender Equality, DPLG Gender Policy and White Paper
on an Integrated National Disability Strategy which is still going to circulate in Council Committees, but
a copy has been send to SALGA Mpumalanga and CGE for correction and input.
2. 8.1 HIV/ AIDS

HIV/Aids still remain the municipality’s biggest challenge. According to the Stats SA, 2011, the
municipality has an HIV/AIDS prevalence of 45.1%. It is the second highest in Ehlanzeni District and
over 5000 people are already receiving ARV’s.

Moreover, there are 3000 orphans and 2000 vulnerable children in the municipality that need
assistance (Department of Health Survey). Hence, the municipality is involved in 32 home based care
projects, of which 16 are funded by the Department of Social Services, 15 are funded by the
Department of Health and 1 is funded by the Expanded Public Works Programme conditional grant.

The municipality has an HIV/AIDS strategy which is aimed at achieving the following objectives:
• To provide awareness and encourage the spirit of using ABC / VCT methods for the prevention
of HIV/AIDS;
• Creating a decent understanding of risk activities and the prevention strategy of HIV/AIDS
transmission;
• To concoctive and prolong the lives of those already infected to strongly participate on sports
activities;
• To promote social welfare on the Mbombela Local Municipality employees and the youth, this
will hopefully sustain their positive healthy lifestyle;
• To promote the partnership in struggle against HIV/AIDS within government, non-governmental
institutions, Traditional leaders, Churches, Unions and other stakeholders for the betterment of
the campaign mission statement.

\In a move to deal with the HIV/Aids, the municipality has created a fully fleshed department with Senior
Manager, Manager and Coordinators to deal directly with issues of HIV/Aids.

106

The municipality has also established the Mbombela Aids Council which is chaired by the Executive
Mayor. The following are the programmes that the municipality is rolling out:

Programme ‘SQ1’
? Focus on Social and Structural
Approaches to HIV and TB Prevention ,
Care and Impact
? Establishment and mentoring of Ward
AIDS Councils
? Conduct workshop for Traditional
Leadership
? LAC
Programme ‘SQ2’
? Prevention of New HIV related, STI and T
infections
? Conducting Youth dialogues foocusing
Teenage pregnancy & Substance Abuse
? Condom distribution and education
? Zazi Campaign
? LAC
Programme ‘SQ3’
? Sustain Health and Wellness of the
Citizens
? Intesify of HCT campaigns
? Awareness campaigns – Vulnerable
groups (OVC/ sexworkers, women,
elderly, disabled)
? Positive Living Summit
? LAC
Programme ‘SQ4’
? Human rights and access to Justice
? Dialogues focusing (forced marraiges,
human trafficking and child labour or
slavery);
? LAC

2.8.2 Youth

The status quo as reflected in the previous sections revealed that the majority of people in the
municipality are youth. In an attempt to address issues affecting youth, the municipality is in the process
of developing youth strategy. The objectives of the strategy are as follows:
? Create health platform for the signing of the Memorandum of Agreement between Mbombela
Local Municipality and National Youth Agency;
? To promote youth interest in the municipality;
? To advocate and lobby for young people economic support in South Africa in general
Mbombela in particular;
? To initiate youth engagement with the cooperate world both government parrastetal and private
business;
? To initiate and support initiatives that seeks to advance youth economic development;
? To coordinate the implementation of Integrated Youth Development Plan and the both the
provincial growth strategy and the National Youth Strategy;
? To provide unemployed youth, young people with disabilities, young school going youth in and
around Mbombela with career guidance, counselling, life skill, health and well-being and
internet services as an endeavour to create a better future;
? Create an able environment for youth development;
? Assist young people to access sustainable livelihood and obtain employment /self-employment
and/or information in, education and training opportunities;
? To assist youth initiatives in tourism and cultural activities
? To assist young people to establish comparatives.

107

In respect of youth development programmes, the focus of the municipality is mainly on ensuring that
the guidelines of the local government framework on youth development are adhered to. The focus
however, is on the following two levels of mainstreaming:

? Internal mainstreaming that begins with all spheres of government developing and
implementing youth friendly policies and strategies, setting out clear targets and budgets for
youth within their budgetary and programmatic activities. This approach requires that the
municipality looks at its human resources and ensures that its staff component consists of an
acceptable proportion of youth, with opportunities for training and development and possibilities
for career development within the municipality corporate ladder.

? External mainstreaming is a second level which requires that every line department within a
municipality takes into account the issues affecting young people in communities within
municipal areas. The Framework proposes that mainstreaming be considered in areas of Youth
Policy, Strategic Plans and Programmes. The Framework identifies lessons from good practice
examples in Youth Policy development; from South Africa. Further, it identifies key municipality
Programme Priorities, viz; Infrastructure Provisioning; Free Basic Services; Local Economic
Development; Integrated Sustainable Development Programme; Urban Renewal Programme;
Public Participation; and Skills and Leadership Development Programme for Local Government
for the professionalization of youth work.

2.8.2.1 Junior Councilors

The municipality is in a process of establishing a Junior Councilor structure. The rational behind the
establishment of the Junior Councilors is to teach young people how decisions are taken, implemented,
evaluated or monitored by council most important is to develop second layer leadership both politically
and administratively. In responding to this requirement, the municipality must establish Municipal Junior
Council.

2.8.2.2 Youth Development Agency

The Municipality is requested to establish a Youth Local Office, to be known as Mbombela Youth
Development Agency (MYDA). The agency will work hand in hand with the Provincial Youth
Development Agency in creating and promoting coordination in youth development matters. The Youth
Local Office position will be at Level a Coordinator.
The municipality will be rolling out the following programmes:
? National youth services recruitment
? Mbombela young ambassadors on tour guide
? Back to school campaign for child headed families
? Parliament programmes
? 11 March Memorial Lecture
? Masibuyele Emasimini programme
? 16 June celebration
? National youth day celebration
? Youth in agriculture (YARD)
? Recruitment of National rural cooperatives (CORPS)

108

? Recruitment for South African Navy
? Youth crime prevention
? Dialogue for youth with disabilities
? Mandela day celebration
? High school debates competition
? Children focus week
? Take a child to the work place
? Social Security programmes
? Business Training and Cooperatives establishment
? 16 June tournament
? Allocation of books to 5 high school libraries.

2. 8. 3 Gender Development

The municipality has developed an Employment Equity Plan aimed at eliminating unfair discrimination
in employment and to provide for Affirmative Action to redress the imbalances of the past and create
equity in employment. The policy specifically ensures that women are considered in the senior
positions. Mbombela Local Municipality through its Transversal unit has developed a draft gender policy
informed by the DPLG Gender Policy. The overall purpose of this policy document is to provide a
framework that will serve as a guide for development of gender responsive programmes, projects,
policies, and procedures within the municipality in transforming the status of women. The key outcome
of the policy is to ensure the mainstreaming of gender in the broader planning agenda of the
municipality. Refer to Chapter 1 under the organisational structure for more information regarding the
status quo of gender in the municipality.

2. 8.4 Children

Children’s Rights are enshrined in the Constitution of the Republic of South Africa. Departments are,
therefore, obliged to translate the Constitutional Mandate into legislation, policies and programmes at all
spheres of Government to ensure that the human rights of children are meted out to South African
children. According to Ehlanzeni District Municipality, the majority of children in MLM do not have
access to government resources such as clinics, schools, social grants and children who are severely
disabled with no access to assistive devices and education.

The strategic children’s rights agenda of Government is guided by the Children’s Rights Sector’s
obligation to contribute to national initiatives towards delivery on:

• The Constitutional Mandate
• The National Strategic Objective i.e. “A united, democratic, non-racial, non-sexist and
prosperous South Africa”
• The People’s Contract or Election Manifesto
• National priorities
• Regional and International obligations

The Children’s Rights Stakeholder’s Forum was established for the following reasons:
• Is a key structure in enhancing service delivery and equalization of opportunities for children in
the Municipality

109

• Strengthens an enabling environment conducive for Children’s Rights delivery in the
Municipality
• Promotes the legal and political accountability set out in the United Nations Conventions;
• Contributes in all relevant ways to ensure that children’s rights are promoted effectively and to
strengthen accountability which is the hallmark of the realization of these rights;
• will put attention to pertinent issues such as worst forms of child labour, hazardous works,
trafficking and sexual exploitation;
• Promotes cohesion in relation to NGO’s;
• Creates a platform of acquiring data for monitoring children’s rights delivery;
• Advocates for and promotes children’s rights and responsibilities in society;
• Facilitates and coordinates the Programme of Action and the National Plan of Action for
children;
• Promotes constitutional requirements, aspirations of regional and international Children’s
Rights instrument;
• Ensure effective public private partnerships in order to advance delivery of the Constitutional
mandate.

Currently, the municipality has identified donors to assist in allocating books to 5 primary school
libraries.The areas of focus for children’s rights issues will be on early child hood development,
emphasis on education through the back to school campaigns, orphaned and vulnerable children,
substance abuse and social education on teenage pregnancy, career guidance, health education, child
trafficking, general safety of children, social services, infrastructure, nutrition and peer counseling.

The municipality has already compiled a data base for Early Childhood Development Centers (ECD)
and thus far they are 108 Centres. According to the Department of Social Development, 106 ECD’s are
funded and two are still in a process of registration, the total number of ECD learners is 2 713. The
municipality will establish an ECD Forum aiming at creating a platform for ECD Coordinators to engage
Council on issues relating to Early Childhood Development issues. The municipality has visited ECD
centres around its area of jurisdiction with an intention of assessing the governmental services which
resulted in finding out that the is a shortage of sponges and blankets, then the municipality has resolved
to assist through its Transversal Unit in donating 30 sponges and 30 blankets (6 Centres). There is a
fundraising conducted by Mbombela through its Transversal Services in partnership with Ligwalagwala
Fm and Mpumalanga Land & Agriculture Committee for clothing and grocery whereby orphanage
centres will be identified through Ligwalagwala FM to benefit on the programme.

According to the Department of Social Development, MLM has 7152 children who receive foster care
grants and thus far the backlog is approximately 1500 and 2 363 Orphans. This therefore implies that
there is a need to conduct social security programmes.

2. 8. 5 Executive Mayor’s programmes

The Executive Mayor will continue to participate in the programmes that are aimed in improving the
lives of disadvanted special goups. Some of the programmes includes:
? Christmas Party for Mbombela First Citizens, Persons with Disabilities, Orphans and Vulnerable
Children
? Distribution of food parcels, blankets and intervention to poverty stricken families
? Distribution of variations of sidling’s to Primary Schools that provide food nutrition
? Distribution of used clothes/ consignments
? Donation of School uniform to orphans

110

? Donation of gifts by the Executive Mayor to orphanage centres and Inclusive centres
? Donation of spectacles to children with disabilities Albinisms.

2. 8.6 Disability

Historically, disability issues have been addressed in a piecemeal, fragmented way. This has been one
of the key factors contributing to the marginalization of disabled people and the dire poverty of the
circumstances in which the majority fined them in. If the needs of disabled people are to be effectively
addressed and the objectives of the RDP are to be met, disability must be fully integrated into the
principles, strategies and framework of the programme. This will ensure that the effects of apartheid as
they have affected disabled people will be eradicated in a sustainable process of reconstruction.

Thus far the municipality has managed to employ only 5 disabled persons 1 male and 4 females.
Mbombela Civic Center building is accessible for persons with disabilities in terms of toilets, packing
ramps and lift. In terms of database the Municipality have 6 613 persons with disabilities, 43 centres
and one Inclusive School around its jurisdiction.

The municipality does not have a disability strategy, and is currently using Ehlanzeni Disability Strategy.
The strategy aim to achieve the following:

• Facilitation of the integration of disability issues into municipal developmental strategies,
planning and programmes;
• the development of an integrated management system for the coordination of disability
planning, implementation and monitoring in the various line functions at all municipalities in the
District;
• the development of capacity building strategies that will enhance municipality’s ability at all
levels to implement recommendations contained in the Municipal Integrated Disability Strategy;
• a Programme of public education and awareness raising aimed at changing fundamental
prejudices in Ehlanzeni’s societies and communities.

The municipality will establish a Disability Council which will facilitate and coordinate all the
programmes and issues affecting the disable people. The municipality has further compiled a data base
for Albinisms and engaged donors to assist them with spectacles. About twenty (21) Albinisms are
undergoing consultation at Value Mat Center in Dr Stanley and Dekock Surgery. The following are
some of the municipal programmes for disability people:
? Masibuyele Emasimini Programme
? Business training workshop and Cooperatives establishment
? Dialogue on the Rights and safety of persons with disabilities
? Awareness campaign on HIV/AIDS
? Empowerment against any form of abuse
? 16 Days of Activism Programme
? Executive Mayors games
? Social security Programmes
? Women’s Celebration
? Human Rights Celebration
? Sign language workshop
? Disability wheelchair basket ball
? Awareness campaign on building and transport to be accessible(public and private)
? Supported awareness procurement workshop for people with disability
? Supported Ehlanzeni Executive Mayor’s Achievers Awards programme

111

2.8.7 The first citizens of Mbombela

The municipality has compiled a data base for elderly persons with an intension to create a platform for
aged people to be able to engage the municipality in terms of their issues. Thus far according to the
municipal data base there are 22 359 old age persons within the municipal area. The municipality’s
programmes on the first citizens are as follows:

? HIV/AIDS workshop
? Rights and Safety of Elderly people
? Masibuyele Emasimini programme
? Elderly Exchange Experiential programme
? Women’s Day Celebration
? 16 Days of Activism
? International Women’s Day Celebration
? First Citizen Celebration

2.8.8 Traditional Healers

The municipality is in a process of compiling a data base for Traditional Healers to create a platform for
them to raise their issues in the municipality, also for the alignment of HIV/AIDS related issues.

The municipality will be coordinating and facilitating programmes for all target groups to fast track
development of the previously disadvantaged groups. In making sure that issues of Transversal
Services are well mainstreamed, there will be strategic planning on Transversal issues.

2.9 LOCAL ECONOMIC DEVELOPMENT (LED)

2.9.1 Introduction
Local Economic Development (LED) is an approach towards economic development that allows and
encourages local people to work together to achieve sustainable economic growth and development,
thereby bringing economic benefits and improved quality of life for all residents within a specific local
area. It is an on-going process, rather than a single project or a series of steps to follow. It involves
identifying and using local resources, ideas and skills to stimulate economic growth and development.
The aim of LED is to create employment opportunities for local residents, alleviate poverty and
redistribute resources and opportunities to the benefit of all local residents. This section outline the
municipality strategy on local economic development.

2.9.2 Mission statement for the LED
The vision for the municipality is to be a “City of Excellence”. In order to attain this vision, the mission
statement for the LED strategy is as follows:

112

“Together in partnership, stimulating economic development by providing efficient service
delivery, meeting the needs of local communities and creating an enabling environment for
business development, economic growth and employment creation”

2.9.3 LED strategy objectives
In order to achieve the municipal vision and LED mission, the following five (5) development objectives
have been identified:

? Development Objective 1: An Efficient and Enabling Municipality with Exceptional Infrastructure
? Development Objective 2: An Inclusive Municipal Economy
? Development Objective 3: An Innovative and Technologically Advanced Municipality
? Development Objective 4: An Education and Skills Development Orientated Municipality
? Development Objective 5: An Environmentally Friendly and Tourism Centred Municipality

2.9. 4 Economic status of the municipality

2.9.4.1 Economic growth

Figure 2.9.4.1 indicates the economic growth rate between 2003 and 2013 in Mpumalanga, Ehlanzeni
DM and MLM. Since 2007 Mbombela has experienced a decreasing growth rate with slight
improvements in growth in 2010 and 2012. In 2010, the mining sector, the trade sector and the
transport sector all contributed considerably to the local economy while in 2012; there was an increase
in the contribution made by the agricultural sector as well as the utilities sector. Before the economic
downturn (2007-2009), the average growth for MLM was approximately 6% while after the economic
downturn (2009- present) MLM only grows at 2% meaning that it has not fully recovered from the
recession. Before the economic downturn MLM also experienced higher growth rates than the Province
and the District.
Figure 2.9.4.1 Economic Growth Compared to District and Province, 2003 – 2013

(Source: Quantec Research Database & Urban-Econ Calculations, 2014)

113

The sectors that contribute the most to the GVA of MLM include:
? Finance and business sector (22%)
? Manufacturing (17%)
? General government services (17%)
? Trade and accommodation (13%)
Mbombela (town) is the capital of Mpumalanga and is situated closely to Swaziland and Mozambique; it
is therefore not surprising that finance and business services and trade sectors contribute considerably
to the local economy as many consumers travel to Mbombela for their shopping and business needs.

2.9.4.2 Sectoral performance

Table 2.9.4.1 below discusses each economic sector and its performance in MLM in brief. Based on
this Table, it is evident that some sectors in MLM, some sectors contribute significantly to the local
economy and has shown good growth over the last ten years.
It is evident that the economy of Mbombela has not yet recovered from the economic downturn in 2008.
Many of the sectors are growing at much lower rates than before 2009. It is therefore necessary the
projects within MLM stimulate sectors so that there can be an increase in economic growth.
The sectors with very low growth rates but still make a significant contribution to the local economy
include:
? Manufacturing
? Trade and accommodation
? Finance and business services

Table 2.9.4.2 Sectoral Performance
Contribution to
GVA: 2003
Contribution to
GVA: 2013
Growth:
2003 – 2013
Growth:
2012 – 2013
Comment
Agriculture 5% 4% 2% 4% Agriculture in Mbombela contributes little to the local economy compared to other
sectors but due to the ideal location of MLM in terms of exports, tourism, and
trade and the opportunities in this sector for employment creation, the agriculture
sector has lots of potential for development. New developments such as the
Fresh Produce Market will have a positive effect on the local sector by providing
smaller, local farmers easier access to a market.
Mining 3% 3% 5% 1% The mining sector does not contribute much to the local economy due to lack of
commodities to mine, however, the mining of sand provides opportunities for
brick making and other construction uses.
Manufacturing 19% 17% 3% 0% Growth in this sector is declined in recent years but manufacturing in MLM has
potential to expand. This sector can contribute to the trading exports, increase
exports from MLM and stimulate the transport industry.
Utilities 2% 2% 2% 0% The utilities sector in MLM has fluctuating growths and makes little contribution to
the local economy. With new energy technologies (e.g. wind, solar); local
municipalities are open to exploring innovative ways for efficient energy use.
MLM can explore and invest in energy infrastructure for short and long term,
growing this sector will also create job opportunities

Construction 3% 3% 6% 2% The construction sector has shown high average growth rates the last ten years
and more developments in the local municipality will expand this sector and
create the potential for new employment opportunities. The building of large
projects such as the Fresh Produce Market, the high court and legal chambers
and the ICC provide opportunities for employment and growth of this sector.
Trade and 15% 13% 2% 1% It should be noted that, as trade is a sector which derives its demand from other

115

Contribution to
GVA: 2003
Contribution to
GVA: 2013
Growth:
2003 – 2013
Growth:
2012 – 2013
Comment
Accommodation sectors, its growth can be attributed to growth in sectors such as manufacturing,
construction and tourism. Therefore the growth of other sectors will cause the
trade sector to grow. The future ICC development will have a positive effect on
this sector in terms of employment an increased demand for consumable goods.
Transport and
Communication
12% 10% 2% 2% An enabling environment for growth in other sectors includes a good transport
and road network. When the roads are poor and the railway network is weak, it
has a negative effect on investment in the area as investor would rather choose
different locations with more efficient transport linkages
Finance and
Business
Services
18% 22% 6% 2% This is the most prominent sector in MLM. As other sectors achieve growth, the
benefits of that growth will also be experienced in the tertiary sector such as
Finance, insurance and trade. Growth in the finance sector is important for
access to funding by entrepreneurs and SMME’s.

Community
Services Sector
9% 9% 4% 3% Growth in community services indicates self-sufficiency and independence of
communities to create own economic opportunities, therefore an enabling
environment (basic infrastructure & services, communication technology,
linkages to economic nodes, active corridors and training facilities) need to be
created to allow communities to function independently
Government
Services Sector
15% 17% 5% 3% Government investments drive economic development. Prioritisation should to be
given to growing sectors such as finance and business, trade and manufacturing
to further increase their growth and in turn this will trigger an improvement in
other sectors.

116

2.9.4.3 Sectoral employment

Figure 2.9.4.3 illustrates the growth rate for formal employment in Mpumalanga, Ehlanzeni DM and
MLM between 2003 and 2013. Mbombela experienced relatively high employment growth rates
except for the period between 2008 and 2010. During this period, many sectors had to lay off workers,
especially in the construction and manufacturing sectors.
Figure 2.9.4.3: Formal Employment Growth, 2003 – 2013

(Source: Quantec Research Database & Urban-Econ Calculations, 2014)

The sectors that contribute the most to local employment are as follows:
? Government services (22%)
? Finance and business services (17%)
? Trade and accommodation (17%)
? Community services (16%)

2.9.4.4 Level of concentration: Trees index
The Tress Index is a measurement of a region’s economic diversification. If the index is zero it
indicates that the region’s economy is completely diversified, but the closer the index moves to 100
that shows the economy is much more vulnerable to exogenous factors such as climatic conditions
and price fluctuations, and that the economy is considered to be more concentrated.
MLM is a diversified local economy with a Tress Index of 48 (see Table 2.9.4.4). The Mbombela local
economy depends primarily on the government and community services sector as well as the finance
and business sector as well as the trade sector.

117

Table 2.9.4.4: Tress Index, 2013
Sector Contribution (%) Weight Weighted Value
Agriculture 4% 4 15.1
Mining 3% 2 5.7
Manufacturing 17% 7 120.6
Utilities 2% 1 1.9
Construction 3% 3 9.6
Trade Sector 13% 6 79.4
Transport & communication 10% 5 50.1
Finance and business 22% 8 172.5
Services 9% 9 235.7
Total 100% 690.7
Tress Index 48
(Source: Quantec Research Database & Urban-Econ Calculations, 2014)

2.9.4.5 Comparative advantage: location quotient

This subsection aims at revealing the sectors in the study area economy that have a comparative
advantage. Having a competitive advantage is not the same as having a comparative advantage. In
the case of a competitive advantage the definition stems from the possession of a unique set of
various assets (includes natural resources, human resources, locational advantages etc.) what gives
the area/region a competitive edge over other areas.
To have a comparative advantage means that this economy has the ability to render or produce a
product or service more effectively and efficiently, than its counterparts. The element that determines
the comparative advantage of a region is the Location Quotient (LQ) this is used mainly to determine
the levels of concentration within the study area. The industry groups that dominate a specific area
will have a higher LQ and vice versa.
The calculation used to determine the Location Quotient (LQ) in this analysis is as follows:

118

Table 2.9.4.5a: Location Quotient Interpretation
LQ Label Interpretation
Less than 0.75 Low
Local needs are not being met by the resident sector. The region is importing
goods and services in this particular sector.
0.75 – 1.24 Medium
Most of local needs are being met by the resident sector. The region is both
importing and exporting goods and services in the sector.
1.24 – 5.00 High
The sector is serving needs beyond the sector, exporting goods and services
from this sector.
More than 5.00
Very
High
This is an indication of a very high level of local dependence on a sector,
typically a “single-industry” community.

Table 2.9.4.5b: Location Quotient, 2013
Sector LQ Label
Agriculture 0.95 Medium
Mining 0.17 Low
Manufacturing 0.93 Medium
Utilities 0.41 Low
Construction 1.13 Medium
Trade & Accommodation 1.10 Medium
Transport & communication 0.90 Medium
Finance and business services 1.35 High
Community Services 1.23 Medium
Government Services 1.23 Medium
(Source: Urban-Econ calculations based on Quantec Research Database, 2014)
Relative to Mpumalanga, MLM has a high comparative advantage in the finance sector. MLM has a
medium comparative advantage in all other sectors except the mining sector and the utilities sector.
2.9.5 LED objectives
Each of the five (5) objectives will be defined and discussed below, indicating potential projects as
well as important issues that are prevalent in MLM which will have an effect on the successful
implementation of the Mbombela LED Strategy.

2.9.5.1 Development objective 1: an efficient and enabling municipality with
exceptional infrastructure

An efficient and enabling municipality is dependent on the following points:

119

Proper internal municipal capacity: this means that the Municipality must have adequate
staff with sufficient skills to ensure that the Municipality can function at its optimal level

Service delivery & infrastructure: the Municipality is responsible for providing water,
electricity and sanitation services to the communities in MLM. These services are necessary
for any new developments and assists in creating an enabling environment to attract new
investments.

Municipal planning: Policies and by-laws of MLM should be able to create an environment
that is conducive of growth, that promotes public private partnerships and that is favourable
towards private investment in the MLM economy. LED is only successful and sustainable if
the private and public sector strives towards development and the municipality should thus be
encouraging towards such partnerships and private development in its policies and strategies.

Accountability and Transparency: Accountability and transparency is necessary to create
confidence in the local municipality not only for local communities but also for businesses and
future investors (Batho Pele Principles)
The provision of electricity, water, sanitation and the availability of a good road network form the basis
of any economic development. Road development depends in the necessary funds, space and other
environmental factors. Limited space for the expansion of roads in MLM is a very important factor to
consider when planning for new developments. Roads need to be widened to be able to hold to traffic
volumes but road reserves are too small for the required width or nonexistent due to uncontrolled
human settlement in some areas.
In order for new development to take place in the Nsikazi corridor, formal, permanent roads are
needed. Currently, the gravel roads need high levels of maintenance due to the damage caused by
seasonal rain in the area.
MLM will also be responsible to ensure that the necessary infrastructure is in place to be able to
provide services to new developments such as the National Fresh Produce Market, the Mpumalanga
High Court and business chambers, and the International Conference Centre (ICC) as well as the
University of Mpumalanga.

2.9.5.1.1 Municipal Branding
The branding of MLM plays an important role in being an efficient municipality in the sense that
branding is all about communication with the public. Residents in MLM should know that by living in
the ‘municipality of excellence’ that they a have access to proper service delivery and infrastructure.
Not only is branding important for creating an image of unity for Mbombela citizens but also for future
investors. The MLM brand should invoke confidence in the municipality and the services it provides to
businesses. Branding of a municipality should highlight the assets of the municipality and area as well
as the services the municipality provides, not create an unrealistic image.
In order to reach this development objective of MLM the following should occur:

Internal human resource management:
o Internal skills development programme
o Having the people with the right skills in the necessary positions

Decrease service delivery backlogs:

120

o Focus on water provision and sanitation in areas with the highest need
o Building new substations for electricity provision

Provision of infrastructure:
o Precinct plans as well as infrastructure management strategies
o Building roads in areas identified for development in precinct plans and reducing the
amount of gravel roads in the municipality
o Upgrading and widening of roads which have large traffic volumes to provide better
traffic flow and reduce accidents
o Public transport infrastructure (taxi ranks and bus terminals)
o Establishing collaborative partnerships in order to enhance the capabilities of the
Municipality in terms of infrastructure provision

Developing practical implementable municipal strategies and programmes

Support for City Improvement Districts (CID's)
Problems that must be overcome in order to realise this goal include:

A critical lack of basic services in areas such as Mahukule A, Mahukube, Lundi and Nsikazi

New developments will need proper infrastructure for service delivery

Municipal funds must be allocated to prioritised projects and activities

Internal skills development programmes should have a specific focus to ensure that skills
gaps can be appropriately filled

Staff in the municipality should be used where they can be most effective

There should be coordination between departments to ensure a unified focus for the
development of municipality.

In many areas of Mbombela, there is infrastructure and basic service provision which is not up
to standard

Crime is a problem in many areas of the municipality

Electricity theft is a major problem within MLM

2.9.5.2 Development objective 2: an inclusive municipal economy

In order for economic growth in MLM to be sustainable an inclusive economy is essential. An inclusive
economy in MLM would mean that there are no barriers to economic opportunity in the local economy
whether it is geographic or social.
An inclusive economy in MLM would thus mean:

Access to health and education facilities

Access to infrastructure (transport, energy, communication)

Access to government services

An incentivised private sector and partnerships between the private and public sector to
enable to create new economic opportunities

A diversified local economy

121

An enabling environment for the creation of economic opportunities

No barriers to entering the local economy of Municipality (spatial and socio-economic
barriers)
Potential projects towards this development objective include:

Creation of new employment opportunities through the development of value chains in certain
sectors to enhance the value-added procedures within MLM (decreasing imports and
increasing final product exports) by means of cluster and corridor development.

Promoting economic activity and in rural areas by providing basic services, infrastructure and
creating an enabling environment for investment

Skills development programmes so that the unemployed can acquire the necessary skills to
be employed in the jobs that are being created by the LED strategy

Transforming the local informal sector

Aligning LED projects with the spatial planning of MLM

Job linkage centre

Re-establishment of MEDA

SMME support in rural areas (SMME incubator)

Enterprise development strategy
Problems that should be investigated before implementing projects in this development objective
include:

Lack of coordination between IDP, LED and SDF

Lack of communication between the municipality, local communities and the private sector

Large informal sectors in rural areas

Majority of the population lives far away from economic opportunities

Lack of compliance and administering of compliance of the local legislative framework in rural
and informal settlements
Creating an inclusive MLM economy is a long term goal and ideally development should focus on the
economic nodes in the municipality from which corridor and cluster development will follow, to
ultimately be an inclusive economy. The first phase of developing an inclusive economy would be to
create an enabling environment (Development Goal 1) with a focus on roads and transport
development, not only of goods but of people as well. A large obstacle for creating an inclusive
economy in MLM is the distance between employees and their place of employment.

122

Diagram 2.9.5.2: Phased Inclusive Economy Development

Mbombela is a regional activity node and ongoing maintenance and revitalisation of this node shoul d
take place through the development of an inclusive Municipal Economy. Development should take
first take place in the following 1
st
order and 2
nd
order nodal areas as identified in the SDF (2012):
White River, Hazyview, KaNyamazane, Msogwaba, Kabokweni, Swalala and Matsulu. Once the
nodal areas have been development, there should be cluster and corridor development to other areas
in Mbombela. Following this development principle can in the long run lead to an inclusive municipal
economy.
Phase 1: Infrastructure, Roads and Transport
This phase depends on Goal 1 as well as the availability of a public transport sector. Many residents
of MLM live far away from the economic opportunities and make use of public transport to get to these
locations. Public transport in MLM is predominantly the use of bus or taxi services. There are bus
routes from numerous rural areas to the nodal points (Mbombela, White River, Hazyview etc.). The
transport of goods in MLM is mostly done by trucks; the R40 as well as the N4 are important routes in
terms of product transfers. The large volumes of trucks, busses and private vehicles in MLM make
road safety very important. The roads that are used by public transport systems as well as the bus
terminal should be focus points for development as these roads experience large numbers of traffic
volumes every day. Investigating the possibility of rail as a form of public transport can also be
explored.
Phase 1: Enabling
Environment:
Infrastructure, roads &
transport
Phase 2: 1
st
order 2
nd

Order Nodal Point
Development
Primary Industry
Development
Secondary Industry
Development
Tertiary Industry
Development
Phase 3: Development
of Linkages, Corridors
and Clusters
Inclusive MLM
Economy
Ongoing Maintenance within Mbombela (Regional Activity Node)

123

Phase 2: Nodal Development
The sectoral overview and opportunity analysis in previous sectors indicates in which sectors there
are development potential. It is therefore necessary to link the appropriate sectors to the areas in
which their development will be the most beneficial in terms of growth and employment.
The following sectors where identified for development in MLM:

Agriculture

Manufacturing

Utilities

Trade

Tourism
The Table below indicates potential sector development projects based on information from the
enonomic analysis and economic potential analysis.

Table 2.9.5.2: Potential Sector Development Projects
Sector Projects Description
A
g
r
i
c
u
l
t
u
r
e

1. Organic vegetable production Organic vegetables are a recent trend in the agriculture sector.
This project can be in the form of a community project where
organic produce are produced for local markets as well as
exports.
2. Macadamia nut and oil
production
This project would entail establishing new macadamia nut
farms to produce nuts for consumption as well a plant to
produce macadamia nut oil.
3. Compost manufacturing from
farm waste (SMME)
This project would follow the macadamia nut farm project where
shells of macadamia nuts can be used to produce compost for
the use of the farm as well as selling to the local markets.
4. Aquaculture A community fresh water fish farm can promote SMME
development and employment in rural areas of MLM.
M
a
n
u
f
a
c
t
u
r
i
n
g

6. Packaging plant for fruit
exports (KMIA)
Establishing an export market through KMIA for fruits and
vegetables would require a packaging plant near the airport
where produce can be specifically packed according to the
requirements for exports markets.
7. Juice extraction (citrus,
mango)
This project entails establishing a facility where juice can be
extracted from local citrus fruits and mangoes for the local and
export market as a way of adding value to the local agricultural
sector.
8. Production of essential oil
from citrus peel
Citrus fruits are a very prominent crop in MLM; this project
would entail producing essential oil form citrus peel that would
be normally be waste in the production of other citrus products
such as juice.
9. Cosmetics from essential oils This project links with the production of producing essential oils.
This project develops the citrus value chain by producing
cosmetics and soaps from local essential oils extracted from
citrus peel.
10. Eco-friendly packaging
material
This project entails producing boxes and other packaging
materials from recycled paper and plastic items as collected

124

Sector Projects Description
from local recycling projects.
11. Food processing for exports This project can link with the organic food production project
where organic produce as processed and sold for the export
market (dried, juice, sauces etc.)
12. Furniture production This project would provide local communities or SMMEs the
opportunity to learn skills and produce furniture from the wood
of the local forestry industry.
13. Arts & crafts manufacturing
from recycled items
This project links with local recycling projects whereby arts and
crafts from tins, plastic or glass can be produced for the local
tourism market.
U
t
i
l
i
t
i
e
s

14. Solar panel street lights
installation
As a way to save electricity, street lights within Mbombela can
be powered by solar panels.
15. Solar geysers in new
housing developments
New housing developments for local residents should make use
of solar geysers as a way to save energy
16. Business, schools and
household recycling programme
This project entails having special bins or bags for recyclable
materials in schools, local business areas and households as
well as a plant where materials can be sorted to be distributed
to projects for manufacturing (compost, crafts or packaging
materials)
17. Harvesting rain water in
communities without water and
new business developments
Water availability is a concern in MLM and the provision of
water tanks to harvest rain water in communities can help
decrease service delivery backlogs.
18. Programme to encourage
businesses and households to
change to energy saving light
bulbs
This project can be in the form of a marketing campaign to
enlighten households and business about the importance of
saving energy and through this campaign encourage local
households and business to use energy saving light bulbs
where possible.
T
r
a
d
e

19. Informal Trade Management
Programme
Establishing a system to manage informal trade and
establishing ‘markets’ which specifically cater for informal
traders is important tools that can help manage informal trade
in MLM.
20. SMME retail development Creating SMME business incubators which are in the business
of trade in rural areas
Tourism * See Development Goal #5
Phase 3: Corridor and Cluster Development
The third phase of creating an inclusive economy is corridor and cluster development. White River is
an existing forestry cluster while Hazyview is an agriculture cluster and Mbombela is a regional
commercial cluster. Value chain development will grow existing clusters and create opportunities for
new local corridors which will promote a more inclusive economy as employment opportunities will not
be limited to the nodal areas.

125

2.9.5.3 Development objective 3: an innovative and technologically advanced
municipality

Technological advancement can be in the form of service delivery, communication, energy provision
and innovative manufacturing incubators. By ensuring that MLM is an innovative and technologically
advanced municipality can mean that processes, service delivery and economic growth can occur at
an optimal level and that there is an enabling environment for technologically advanced cluster
developments. Partnerships between private sector and public sector are essential for technological
advancements such as broadband and Wi-Fi internet connections in public areas. MLM can become
a technologically advanced municipality through:

Creating functioning ICT infrastructure (broadband connectivity)

Skills development in technological changes in certain sectors, for instance agriculture or
manufacturing

Technologically advanced industrial parks

A computer literate population

Using technology to improve service delivery
Projects towards this development goal can include:

Providing internet connectivity to local schools and skills development institutions

Wi-Fi Hotspots in the CBD and places such as libraries

Community computer literate program

E-services

‘Smart’ crime fighting and emergency management

Mobile internet cafes in rural areas

Improving the municipal call centre to be available 24 hours
Problems in MLM in terms of access to internet and computers:

An estimated 32% of the people in MLM have access to the internet, of which 57% access the
internet via their cell phones and only 17% have access at home.

Access to a computer is limited to 20% of the MLM population

Rural areas in MLM should not be excluded from technological advancements (inclusive
economy).

2.9.5.4 Development objective 4: an education and skills development orientated
municipality

A university city can be defined as a city whose economy is closely related with the activities at the
university and supported by university structures; this would typically include university clinics,
libraries, business incubators etc. A university city is typically a city whose population is dominated by
the university population. Many university cities are also centres for technological research and
innovative start-ups. University cities in South Africa include Stellenbosch and Potchefstroom.

126

Conflict can easily arise between local government and higher education facilities, especially if there
are a large number of students. Issues that normally arise are due to housing concerns, noise levels,
crime concerns and traffic congestions. It is therefore very important that there are open lines of
communication between local government and the higher education facilities.
MLM has a number of higher education facilities, especially in Mbombela. These education facilities
include: a UNISA office, the Ehlanzeni FET College, a Tshwane University of Technology (TUT)
Campus etc. as well as the development of the University of Mpumalanga.
The University of Mpumalanga’s main campus is situated at the Lowveld College of Agriculture and
has two other campuses; the hospitality school in KaNyamazane and the Siyabuswa Education
Campus. The Education Campus is not located within the borders of MLM.
MLM will not be a traditional university city where the local economy is mostly dependant on the
operations of the University but the Mpumalanga University, together with other higher education
facilities will assist to fill some of the economic and socio-economic gaps that are prevalent in the
MLM.
The Diagram below indicates the framework with which the partnership between local education
service providers, business and the local municipality can work together to work towards an education
and skills development municipality.
Diagram 2.9.5.4: Skills Development Framework

Focus points for developing MLM into an education and skills development focused municipality:

There is a large majority of the population that have a lack in education

The University will improve access to higher education for local communities

High youth unemployment rates are prevalent in MLM

The University will assist in developing the local agricultural and tourism sector

The University will create employment (temporary and permanent)
Mbombela Local Municipality
Mpumalanga University
Local Skills Development

Employment
Local Businesses Other Education and Training Facilities

127

By focussing on tourism and agriculture studies, the university can ensure growth in these
sectors

Future commercial studies at the university can be very beneficial towards to local economy
as Mbombela is the finance and business hub of the Province

Together with the municipality and other institutions, skills shortages can be addresses and
the importance of an high school education can be promoted in MLM

By working together with other education and training facilities, the University can provide
assistance in terms of accreditation of courses, guest lecturers etc.

Collaboration volunteer programmes between institutions can directly benefit local
communities

Encouraging post graduate research at higher education facilities in MLM

The municipality can assist in maximising the benefits from the University by:

Ensuring that there are basic services and infrastructure at university developments

Working together with the university to ensure that there is easy access to campus and the
necessary facilities for example, shops, libraries, book stores etc.

Collaborating with university in terms of spatial planning in areas surrounding the municipality

Creating a job linkage programme with the university and local businesses to facilitate linking
graduated with job opportunities or internships within MLM to ensure skills are retained within
the municipality

Creating a partnership with the university to create community and volunteer projects in which
students can participate and build the local community

Higher education institutions can collaborate with each other and the municipality to host
facilitate courses or classes in the rural areas

Developing a skills development centre for vocational education and training
Currently, the university is still in its development phase; with only 100 students being able to enrol for
the B(Ed) and 20 students for the Bachelor of Agriculture programme. There is also space available
for 20 students in for the Diploma in Hospitality Management programme. The municipality can
therefore at this stage only ensure that adequate infrastructure is provided to the University and that
the development of the university is part of MLM spatial planning. As the university develops en
grows, the municipality must collaborate with the University and encourage their participation in local
economic development.

Skills development should be in those sectors which have been identified for development as
well as the prominent sectors in MLM.

Not only is it important to improve skills in MLM to ensure that sectors have adequately skilled
employees and that there is a larger proportion of the population who have higher education
but there should also be a focus on primary and high schools and the importance of obtaining
a National Senior Certificate.

MLM can assist in ensuring that schools are an environment constructive to learning by
ensuring that there are functioning services like running water and electricity. The municipality

128

can also assist in ensuring that schools have books, the necessary equipment and adequate
libraries to help learners make the most of their education.

2.9.5.5 Development objective 5: an environmentally friendly and tourism centred
region

This development objective is based on a two pronged approach:

Diagram 2.9.5.5: Development Objective 5 – Approach

a) Environmentally Friendly Municipality

Developing MLM into an environmentally friendly municipality means that the municipality creates a
favourable environment for recycling and waste management activities; encourages sustainable
production practices and promotes the use of alternative energy sources.

MLM can be transformed into an environmentally friendly municipality by:

Promoting the importance of ‘reduce, re-use and recycle’ in local communities

Encouraging new developments to use products such as solar panels for electricity, solar
geysers, energy saving light bulbs and environmentally friendly building materials and water
tanks to harvest rain water.

Encouraging businesses and households to use energy and water more efficiently and to
reduce waste

Creating more environmentally friendly practices within the day-to-day functioning of the
Municipality.

Utilising alternative energy sources to reduce infrastructure backlogs in rural communities
(electricity and solar geysers)

Reducing the carbon footprint of the Municipality

Lobbying nationally for power to be put back into the grid by residential generation options
Tourism Promotion
Objective: An Environmentally Friendly and
Tourism Centred Region
Environmentally Friendly
Municipality
Regional Conservation and
Management of Biodiversity,
Environmental and Natural
Resources

129

Potential projects:

Recycling programmes (involve schools, businesses and local communities)

Manufacture products from recycled materials for the tourism sector

Organic waste to compost programme

Alternative energy for rural communities

Support for CIDs/keep Mbombela clean projects

Waste to energy production

Advertisement campaign on recycling, water and electricity use in MLM to inspire the local
communities and businesses to become more environmentally conscious

Community involvement in environmental protection is essential but unfortunately very poor waste
management systems are in place in Mbombela; 60% of residents use their own refuse dumps to
dispose of waste which can have very negative environmental impacts. Addressing this issue should
be a priority while transforming MLM into an environmentally friendly municipality.

b) Conservation and Management of Biodiversity, Environmental and Natural Resources.

The natural environment of MLM and surrounding
areas play a very important role in the local
economy of the region. The region is renowned
for the Kruger National Park as well as other
natural tourist attractions. Conservation and
sustainable agricultural methods must thus be of
priority to the region.

The increase in the population, especially in MLM will have a negative effect on the natural
environment. Deforestation, overgrazing, erosion and water pollution as a result of informal human
settlements can all have negative effects on the environment which in turn can have a negative result
on the regional tourism industry and the rural agricultural sector.
It is therefore necessary that local government, tourism stakeholders and the local community work
together to protect the eco-systems and natural environment of the region as it can form valuable
linkages to the tourism sector of the region and assist in creating new employment opportunities for
the local communities.
Potential projects for conservation and tourism promotion in the region includes:

Sustainable agriculture programme in rural areas

Management of rivers, streams, wetlands etc.

Addressing illegal sand mining in rural areas

130

It is very important to educate local communities on the importance of conservation and sustainable
agricultural practises. Not only for its affect on tourism but also on the livelihoods of future generations
c) Tourism Promotion
As previously mentioned the natural environment of MLM as well as in the surrounding areas play an
important role in local tourism development; but this is not the only aspect to tourism in MLM.
The following types of tourism should be developed and promoted within MLM:

Adventure tourism

Cultural tourism

Cross-border shopping tourism (Mozambique and Swaziland)

Events tourism (ICC development, Mbombela Stadium, local festivals, etc.)

Rural/township tourism
Potential projects in terms of tourism development thus include:

Developing existing conservation areas in MLM into tourism attractions

Working together with other local municipalities and tourism stakeholders to create regional
tourism routes and packages

Promoting community tourism in areas surrounding the Kruger National Park (rural tours,
local arts & crafts manufacturing etc.)

Creating a Mbombela Tourism Development Strategy which will promote the different types of
tourism which are mentioned above in MLM as well as marketing an branding of MLM as a
tourist destination
d) Tourism Branding
Branding is an important tool to market an area to potential tourists. MLM falls within the branding
area of Kruger Lowveld Tourism who promotes tourism in the following towns and surrounding areas:

Hoedspruit

Schoemanskloof

Bushbuckridge

eManzana (Badplaas)

Hazyview

Malelane

White River

Komatipoort

Mbombela

Kruger National Park area

131

It is important when branding MLM as a tourist destination and
a gateway to the region, to collaborate and align with existing
branding of the area – such as the Kruger Lowveld brand. By
working together with this brand, together with the Kruger
Lowveld Chamber of Business and Tourism (KLCBT), tourism
linkages to other areas can be strengthened and there can be
collective tourism promotion. It is also important to create a
more aligned branding strategy between private and public
sectors. ‘Kruger Lowveld’ should be used to attract tourists to
all the activities and attractions in the area and ‘the city of
excellence’ should be true to its description in terms of
services delivery and infrastructure, safety and cleanliness to
ensure tourists to stay longer and return to MLM.

2.9.6 LED projects

Each project identified in the MLM LED is classified according to the following of types of projects:

Quick win projects: These projects can be implemented within a maximum of 6 months and
show a quick success. This will ensure that awareness of the strategy is raised, the
commitment of stakeholders is proven and assist stimulate the momentum required to
implement a wide reaching economic strategy.

Anchor projects: These projects are flagship projects aimed primarily at facilitating and
attaining economic development. These projects should be functionally focused and will
represent the primary marketable development drivers in the study area. These projects are
generally aimed at the medium to long term.

Supportive projects: These projects will play a supporting role for both the catalytic as well
as the community need projects. An example in this regard could be upgrading of roads.

Identified need projects: The needs identified by the local community in the study area are
as important as any other project and thus also require facilitation.

Skills linkage projects: These projects relate to opportunities of local economic development
service provision such as municipal labour-intensive projects where local community
members with the appropriate skills can be employed or up-skilled.

132

The Table below indicates the priority of each of the LED projects as well as the type of project.

Table 2.9.4: Project Prioritisation
Project Priority Type
Development Goal 1: An Efficient and Enabling Municipality with Exceptional Infrastructure
1.1 Reduction of service delivery backlogs through inter-departmental
collaboration
1 Anchor
1.2 Building of roads in areas identified for development 2 Supportive
1.3 Creating precinct plans 3 Supportive
1.4 Internal skills development programme 4 Quick win
1.5 Inter-departmental cooperation and teambuilding 5 Quick win
Development Goal 2: An Inclusive Municipal Economy
2.1 SMME Incubator 1 Anchor
2.2 Macadamia nut and oil production 2 Anchor
2.3 Job Linkage Centre 3 Identified need
2.4 Informal Trade Management Programme 4 Quick win
2.5 SMME retail development 5 Identified need
2.6 Packaging plant for fruit exports (KMIA) 6 Anchor
2.7 Food processing for exports 7 Anchor
2.8 Furniture production 8 Anchor
2.9 Organic vegetable production 9 Anchor
2.10 Aquaculture 10 Anchor
2.10 Compost manufacturing from farm waste (SMME) 11 Anchor
2.11Juice extraction (citrus, mango) 12 Anchor
2.12 Production of essential oil from citrus peel 13 Anchor
2.13 Eco-friendly packaging material 14 Anchor
2.14 Re-establishment of MEDA 15 Quick Win
2.15 Mbombela Corporate Social Investment Scheme 16 Quick win
2.16 Cosmetics from essential oils 17 Anchor
2.17 Mbombela Economic Development Partnership 18 Quick Win
2.18 Traffic and public transport strategy

19 Supportive
Development Goal 3: An Innovative & Technologically Advanced Municipality
3.1 Wi-Fi project (CBD, Schools, Libraries) 1 Quick win
3.2 Community Computer Programme 2 Identified need
3.3 E-services 3 Quick win

133

Project Priority Type
Development Goal 4: An Education and Skills Development Orientated Municipality
4.1 Internship and Trainee Programme 1 Identified need
4.2 Youth Development Programme & Skills Centre 2 Identified need
4.3 Mpumalanga University Service Provision 3 Supportive
4.4 Mbombela Higher Education Partnership 4 Quick win
4.5 Sectoral Skills Audit 5 Supportive
4.6 Mbombela Schools Development Programme 6 Identified need
Development Goal 5: An Environmentally Friendly and Tourism Centred Municipality
5.1 Community tourism projects 1 Identified need
5.2 New tourism development in conservation areas 2 Anchor
5.3 Arts & crafts manufacturing from recycled items 3 Skills linkage
5.4 Recycling programmes (involve schools, businesses and local
communities)
4 Skills linkage
5.5 Regional tourism routes and packages 5 Quick win
5.6 City Improvement District (CID) Support Programme 6 Quick win
5.7 Organic waste beneficiation 7 Anchor
5.8 Waste to Energy 8 Anchor
5.9 Sustainable agriculture programme 9 Quick win
5.10 Solar geysers in new housing developments 10 Anchor
5.11 Harvesting rain water in communities without water and new business
developments
11 Anchor
5.12 Solar panel street lights installation 12 Anchor
5.13 Programme to encourage businesses and households to change to
energy saving light bulbs
13 Quick win

2.9.7 LED forum
The LED Forum is the backbone for implementation of LED projects as the stakeholders will analyse
the current economic challenges in the municipality and how to address these challenges, in their
specialised field. The forum plays an important role in ensuring community members and local
stakeholders are informed of economic happenings in their local areas and how to benefit and
contribute to projects.

The main objective to establishing a LED Forum is to ensure:

The participation and input from the local community,

Businesses and other stakeholders within the local municipality that will enable co-ordination
between local stakeholders,

Mobilisation of resources, obtaining commitment as well as establishing and maintaining a
common vision.

134

The forum operates in a partnership approach as indicated in the Diagram below:
Figure 2.9.6: LED Forum

These forums are important and critical tools required in bridging the communication gap and
obtaining a common understanding between the local municipality and the community at large.
Furthermore these forums also provide the platform for the Local Municipality to form partnerships
with the different stakeholders.

In general a LED Forum consists of the private, public and community sectors. MLM should also seek
to involve a greater number of representatives from various government departments. This will
increase access to resources as well as provide a different perspective on ensuring and enabling
economic growth within the local municipality.

2. 10 SPATI AL DEVELOPMENT FRAMEWORK (SDF)

In 2012, the municipality approved its 2030 Spatial Development Framework to guide and informs
land development and management. The approved SDF gives spatial effect to multi-sectoral projects
identified in the IDP as well as assist the municipality to co-ordinate the implementation of the various
sector plans.
This section gives a summary of key spatial aspects and development indicators that will inform the
development of the municipality.

2.10.1 SPATI AL ANALYSIS

This section outlines biophysical factors that influence where and how people in the municipality settle
and organise themselves in space.

135

2.10.1.1 Climate

Mbombela is characterised by a humid subtropical climate with mild winters and warm summers. The
average daily temperature fluctuates from 6 ?C in winter (June and July) to 29 ?C in summer (January,
February). The average rainfall varies from 10mm during the winter (June, July and August) to
120mm during summer (November, December, January and February). The highest average rainfall
is recorded in December and January. The geographic distribution of rainfall is as follows:
? The highest rainfall (800-1500mm) is recorded in the areas surrounding Ngodwana,
Kaapsehoop, and Elandshoek to the west and in the area north-west of White River town.
? The Crocodile River catchment area and a north-south belt, including White River, Sabie
River, Longmere Dam, Klipkoppie Dam and Da Gama Dam fall within a 700–800mm rainfall
zone.
? The eastern areas receive the lowest annual rainfall between 400–700mm.

2.10.1.2 Geology

The geology types occurring in the municipal area can be summarised as follows:
? A large portion of Mbombela is underlain with the Granite Group which covers most of the
central, northern and eastern areas.
? Highly permeable and erodible, colluvial sands and residual soils overlay the granitic bedrock
(Potassic Gneiss and Migmatite) in the Kanyamazane area.
? The western part has a variety of geology groups including Shale, Dolomite, Quartzite,
Andesite, Ultramatic rocks and Gneiss. Dolomite rocks give rise to caustic features; the most
notable in Mbombela is the 1.8km long Sudwala Caves.
? Hazyview is underlain by Granodiorite and Matsulu is underlain by Gneiss.

Economic geology is concerned with earth materials that can be used for economic and/or industrial
purposes. These include precious and base metals, non-metallic mineral, construction grade stone,
petroleum minerals, coal and water.

Minerals and metal deposits deriving from the geology groups in Mbombela include gold, chrysotile
(asbestos) and limestone, mainly located along the escarpment in the western part. The central,
northern and eastern sections of Mbombela do not contain any minerals worthy of exploitation.
Mbombela has limited mining resources worthy of driving the economy as compared to other
municipalities within Mpumalanga that have gold and coal mines. The mining deposits are considered
noteworthy:
? The mine north of Kaapschehoop is continuously producing asbestos.
? Crusher quarries exist at Alkmaar, Karino, White River and Hazyview.
? In the western part there are various localities where gold deposits occur and where it has
already been exploited.
? Two mines situated north and north-east of Kaapsehoop respectively, are abandoned.
? Small scale illegal sand mining is taking place from river beds, mainly in the Nsikaz area
(Gutshwa River).

136

2.10.1.3 Topography

Mbombela lies on the eastern edge of the Drakensberg mountain range. The area can be divided into
three distinct physiographic regions based on the north-south orientation of the drakensburg mountain
range, namely, highveld, escarpment and lowveld.

The topography ranges from mountainous areas in the western parts to gently sloping areas in the
eastern parts. The area falls from a height of approximately 1200m above sea level in the southern-
western part to 350m in the north-eastern parts. A slope analysis, based on slope data received from
the National Department of Agriculture, Forestry and Fisheries, presents areas with slopes that vary
between ?2% (level to very gently slope) and ?20 %( steep slopes). Accordingly, most of the
municipality consists of steep slopes.

2.10.1.4 Hydrology

Mbombela is situated within two sub-catchments that constitute the main Nkomati River catchment
area. The two sub-catchments are the Crocodile River catchment area and the Sabie-Sand
catchment area. The Crocodile River runs in a west-east direction across the middle of the
municipality and the Sabie River runs in a west-east direction along the northern boundary of the
municipality. The Elands River, running south-east to north-west, is the main tributary flowing into the
Crocodile River. The North Sand River, running north-south, is the main tributary flowing into the
Sabie River. Other rivers of note include Ngodwana River, Nels River, White River, White Waters
River, Gutshwa River, Nsikazi River, Houtbosloop River, Lupelule River, Rietspruit River and
Blinkwater River.

The main dams in Mbombela are Longmere, Ngodwana, Da Gama, Klipkopje, Primkop, Nsikazana,
Friedenheim, Kwena (situated outside Mbombela in Thaba Chweu), Witklip (situated outside
Mbombela in Thaba Chweu) and Inyaka (situated outside Mbombela in Bushbuckridge).

2.10.1.5 Geohydrology

The Kanyamazane area is underlain by a granite aquifer which is estimated to store approximately
5000m of water per km² and receives ±25 000m³ per annum of recharge from rainfall. Large
exploitation of groundwater is limited due to the physical hydraulic nature of granite aquifers.
Groundwater quality is good although contamination is taking place. Groundwater drainage is in an
easterly direction. The area to the north of Mbombela is typically underlain by un-oxidised residual
dolomite soils however some of the areas appear to be oxidised and as a consequence are likely to
be very permeable. Other areas may have sinkholes forming as a result of the poor drainage and
where the dolomite rock is less than 6 meter deep.

2.10.1.6 Vegetation

The most dominant vegetation type is the Legogote Sour Bushveld, covering most of the western,
central and northern parts. The Highveld regions in the west is characterised by grassland vegetation.
Typical plants include red-hot pokers, pineapple, lilies, scillas, gladioli, watsonias, brunsvigias and
numerous terrestrial orchards and summer rainfall proteas. The Lowveld region is characterised by
the Croc Gorge Mountain Bushveld, Malalane Mountain Bushveld and Pretoriuskop Sour Bushveld.

137

The Escarpment is characterised by the Northern Escarpment Dolomite Grasslands, Steenkamsberg
Montane Grassland, Northern Escarpment Dolomite Grassland and Long Tom Pass Montane.

2.10.1.7 Biodiversity

Mpumalanga Biodiversity Conservation Plan (MBCP) is a spatial plan that groups the province’s
biodiversity assets into six conservation categories based on the measured distribution of hundreds of
biodiversity and ecological features throughout the province. The MBCP for Mpumalanga was
superimposed on the municipal area. The following is evident from the plan:
? Protected areas such as Kruger National Park, Botanicl Garden,
? Irreplaceable areas mainly include the Crocodile Gorge and western escarpment areas
stretching from Elandshoek to Kaapsehoop, with a few patches scattered in Schoemanskloof.
? Highly significant areas are predominantly found in the western part of the municipality. It is
also found, to a lesser extent, around Barberton Nature Reserve, at Luphisi, Mpakeni, Numbi
and between White River and Rocky Drift.
? Important and necessary – includes an area stretching from Numbi to Legogote, an area at
Rocky Drift, an area stretching from Mataffin to Schagen and further north-east and a few
patches along the southern municipal boundary.
? Least concern – these areas are focused in the eastern part of the municipality, east of the
R40.
? No natural habitat remaining – includes the areas that are settled on, forestry areas and areas
used for irrigation purposes.
? Ecological and aquatic corridors – The Sabie and Crocodile Rivers are both categorised as
ecological and aquatic corridors.
The largest protected area is the Kruger National Park followed by the Mthethomusha Nature Reserve
situated on the border of the Kruger National Park. The plateau at Kaapsehoop is an important area
for conservation of plants, particularly herbaceous grasslands species. This area also has the third
largest breeding population of Blue Swallow in South Africa. The Crocodile Gorge has a high scenic
value and a high diversity of habitats and is considered an area of particular ecological and
conservation importance.

2.10.1.8 Agricultural capability

Agricultural land capability is the total suitability for use, in an ecologically sustainable way, for crops,
for grazing, for woodland and for wildlife. The land with a very low agricultural capability coincides with
the mountainous areas. The land with a low agricultural capability is located in the Kruger National
Park, Schoemanskloof, Ngodwana, at Pienaar and Daantjie and north-east of Legogote. The larger
extent of the municipality contains land with a medium agricultural capability. The land with a high
agricultural capability is located at Kiepersol to the north and along the Crocodile River and its
tributary to the west.The weathering of different geology types determine the type of soils (depth,
texture etc.), minerals and metals to be found in different areas, which together with other factors,
determines mining possibilities, agricultural opportunities and vegetation types.

2.10.2 STRATEGIC SPATI AL FRAMEWORK

138

The municipality’s spatial vision is to achieve sustainable development in respect of people, economy
and environment. In order to achieve the spatial vision, the municipality has identified the following 7
spatial strategies:
? Establish a Municipal Open Space System
? Protect prime and unique agricultural land
? Focus areas for land reform
? Develop and strengthen rural-based tourism
? Establish an integrated movement system
? Direct urban growth and promote compact integrated development
? Consolidate and intensifinancial year development in economic opportunity zones
The above strategies are the once that are going to guide the future development of Mbombela.
Figure 2.10.2 show the desired spatial pattern of the municipality informed by the spatial strategies.

Figure 2.10.2: The MLM strategic spatial framework

Source: MLM SDF, 2012

2.10.2.1 Establish a Municipal Open Space System (MOSS)

Mbombela’s geophysical features (such as mountains and plains), natural resources (such as
biodiversity and hydrological systems) and cultural landscapes are central to the way in which
residents and visitors identifinancial year with Mbombela.
People use natural and more formally developed open spaces for exercise, recreation, and cultural
and religious activities, but also derive a sense of well-being from viewing open space, or merely

139

knowing it is there to be used.In addition, by using the ecological services of nature, Mbombela
reduces some of its operating costs, e.g. reeds in wetlands help purifinancial year stormwater, and
improve river water quality.
For these resources to be used en enjoyed by present and future generations, it is critical that they
are defined and protected. Mbombela’s protection-worthy natural resources and assets will determine
where urban development should not go in the medium and longer term, and or where the impact of
development must be carefully managed. Refer to figure 2.10.2.1 for this strategy map.

Figure 2.10.2.1: Strategy 1: Establish a Municipal Open Space System (MOSS)

Source: MLM SDF, 2012

2.10.2.2 Protect prime and unique Agricultural land

Economic development and national food security depend on the availability of productive and fertile
agricultural land, which is consistently threatened by the demand for land for residential and industrial
development.
The Conservation of Agricultural Resources Act (Act 43 of 1983) provides for the conservation of
natural agricultural resources through prevention of erosion and the destruction of water resources,
and veld protection measures. Currently the retention of productive agricultural land is administered
through the Subdivision of Agricultural Land Act, 1970 (Act 70 of 1970) which controls the subdivision
of agricultural land and its use for purposes other than agriculture. In the near future the use of this
scarce resource will be regulated in terms of the Sustainable Utilisation of Agricultural Resource Bill
(SAUR). Enshrined in the SUAR is the national policy on the protection of high potential and unique

140

agricultural land (HPUAL). The Bill tasks provinces with the responsibility of ensuring that the
principles of the HPUAL policy are incorporated into municipal IDPs and SDFs.
In view of the above, the municipality will ensure that the development does not compromise the
production of prime and unique agricultural land within the municipal area. Figure 2.10.2.2 below
show the strategy.
Figure 2.10.2.2: Strategy 2: Protect prime and unique agricultural land

Source: MLM SDF, 2012
2.10.2.3 Focus areas for land reform

Although the municipality is not the key agent for land reform, the municipality has an obligation to
identifinancial year focus areas for land reform. The Department of Rural Development and Land
Reform should work closely with Mbombela to prepare an Area Based Plan (ABP) in order to
incorporate land and agrarian reform projects into its IDP and SDF.
This strategy aims to identifinancial year land reform focus areas in the municipality in order to
achieve the government objectives of providing tenure security that creates socio-economic
opportunities of people living and working on farms and in communal areas, providing land for
sustainable human settlements, industrial and economic development, providing efficient land use
and land administration services and providing skills development framework for agrarian land reform
to all relevant stakeholders. Figure 2.10.2.3 show the map of this strategy.

141

Figure 2.10.2.3: Strategy 3: Focus areas for land reform

Source: MLM SDF, 2012
2.10.2.4 Develop and strengthen rural-based tourism

The scenic environment (natural resources), coupled with numerous attractions, rich cultural heritage
and Kruger National Park, being one of the top ten tourist attractions in South Africa, make Mbombela
a sought after destination to tourists. These attractions need to be consolidated into a municipal wide
tourism destination network and need to be made even more accessible. Such a network should form
an integral part of the broader Mpumalanga Tourism Growth Strategy. Refer to figure 2.10.2.4 for the
map of the strategy.
Figure 2.10.2.4: Strategy 4: Develop and strengthen rural-based tourism

142

Source: MLM SDF, 2012
2.10.2.5 Establish an integrated movement system

Mbombela must have a movement system that provides all residents with convenient and affordable
access to the municipality’s resources and amenities. This movement system have a profound
impact on spatial development patterns and accessibility, and hence on economic and social
opportunity. The aim of this strategy is improve mobility and linkage between the eastern and
western built-up areas of Mbombela and to promote spatial reconstruction and integration.
In line with Mbombela’s Integrated Transport Plan (ITP) and Land Use Transportation Strategy
(LUTS), the movement system cannot simply be reactive to existing demand patterns but must be
structured to cater for possible future demands. The municipality therefore will focus on taxi feeder
(line haul system), regional roads interventions, bus rapid transit system and commuter rail system.
Refer to figure 2.10.2.5 for the map of this strategy.
Figure 2.10.2.5: Strategy 5: Establish an integrated movement system

Source: MLM SDF, 2012

2.10.2.6 Direct urban growth and promote compact integrated development

Mbombela needs actively to pursue a compact form of development, where growth is directed
towards areas suitable for development, and away from important resource areas and hazards. The
future spatial development of the municipality needs to be efficient; needs to make the most of
existing infrastructure investments and capacities, and the resources required for the adequate
maintenance of these systems, before creating new infrastructure and maintenance demands.
Land is a scare resource in the municipality and a delicate balancing act is needed to deal with
competing needs for conservation, productive land and urban development. The municipality will
improve its efficiency and sustainability by helping to protect the environmentally sensitive land by
reducing demand for this land, making better use of the municipality’s limited resources for
infrastructure investments and maintenance and supporting more transport options, as higher
densities will provide the required thresholds to make public transport viable and offering a better,

143

more convenient lifestyle for people who cannot drive, such as eldery, very young and disable people,
as a greater number of facilities and opportunities will be accessible by foot, bicycle or public
transport.
Compact settlements will be achieved through introducing planning tools that contain the settlement
footprint (through urban edges) and encourage responsible densification (through strategic infilling
and the intensification of land uses within the existing footprint, aligned with concentrations of
economic activity, public transport, infrastructure and amenities). Refer to figure 2.10.2.6 for the map
of this strategy.
Figure 2.10.2.6: Strategy 6: Direct urban growth and promote compact integrated development

Source: MLM SDF, 2012

2.10.2.7 Consolidate and intensify development in Economic Opportunity Zones

This strategy is advocating that economic activity (formal and informal) be encouraged to locate within
economic opportunity zones across the municipality, related to the accessibility grid. These
opportunity zones will be focal points for enabling public sector infrastructure investment (information
communication technology, upgrade of roads and utility services). Public infrastructure investment
and proactive land management strategies will provide a measure of certainty and direction to private
investors.
Such economic opportunity zones should therefore serve as logical investment locations, given their
higher thresholds associated with higher densities and concentrated flows of people, are convenient
and accessible, as they are served by public transport and public amenities and facilities and are
supported by mobility routes that facilitate relative ease of movement of people and freight.
The municipality economic opportunity zones are envisaged on the accessibility grid of nodal
development and corridor development. The nodal development involves areas where a higher
intensity of land uses and activities are supported and promoted. On the other hand, corridor

144

development entails links between nodes, along which an increased intensity of development and
activities may be encouraged. Depending on the intensity of activity, the width of the strip could range
from half a street block to two or more street blocks. Refer to figure 2.10.2.7 for the map of this
strategy.

Figure 2.10.2.7: Strategy 7: Consolidate and intensify development in Economic Opportunity
Zones

Source: MLM SDF, 2013

2.10.3 DESIRED SPATIAL PATTERN

The desired spatial pattern basically distinguishes between urban and rural development areas by
means of an urban edge, where rural areas are typically characterised by primary economic activities
i.e.: agriculture, agri-processing, agri-villages, road related purposes including accommodation and
vehicle related services, regional services (cemeteries, waste sites, reservoirs, electricity lines),
tourism and other uses such as quarries and mining. On the other hand, urban areas are typically
characterised by secondary and tertiary economic activity with some primary i.e.: urban agriculture,
building materials, resource extraction.
Urban-rural distinction in the municipality is made by dividing the municipality into 5 zones, where
zone 1 is mainly urban and zones 2 to 5 are mainly rural in character. Zone 1 is Urban Development
Zone (UDZ), zone 2 is Kruger National Park Conservation Zone, zone 3 is Kiepersol-White River
Agricultural Zone, zone 4 is Western Agricultural Zone and zone 5 is Central Agricultural Zone
By nature, Zones 2-5 are not “development areas”, so the interventions in these areas should be
minimized to aspects such as utilizing certain assets (e.g. high potential agricultural land to promote
intensive agriculture and environmental assets to promote tourism), creating rural service centres
where rural communities can access day-to-day services, creating rural residential settlements to

145

provide housing opportunities for people who are involved in the rural economy and ensuring
sufficient linkages between the rural and urban environments.
Each zone is briefly described below, including strategic objectives and development directives (Note:
The demarcation of these zones is conceptual and not cadastral specific). Refer to figure 2.10.3
below for the desired spatial pattern

Figure 2.10.3: MLM Desired spatial pattern

Source: MLM SDF, 2012

2.10.3.1 Urban Development Zone

Urban development zone includes all land situated within the urban edge, including existing built-up
areas, areas earmarked for future urban development (next 20 to 30 years) as well as undevelopable
land (due to topographical, environmental or any other constraints). The main objective of this zone is
to create a more compact municipality that will improve its efficiency and sustainability and to
consolidate and intensifinancial year development in economic opportunity zones as required in terms
of the spatial strategies 6 and 7 respectively.

2.10.3.2 Kruger National Park Conservation Zone

This zone is located along the length of the Kruger National Park and stretches from the northern to
the southern municipal boundary, from Sabie River to Mbombela.It includes the Methethomusha
Nature Reserve, Crocodile Gorge, Crocriver Mountain Conservancy, Legogote Mountain and the
existing rural settlements of Luphisi, Mpakeni, Sipelanyane, Buyelani, Mahukube, Mjejane, Makoko
and Phameni. Mayfern is an existing agricultural village located east of Mbombela.

146

The Sabie, Crocodile, Gutshwa and Nsikazi Rivers are the main rivers traversing this zone. Minor
districts roads, mainly gravel, characterise this zone with the exception of the N4 highway and road
R536 to Phabeni Gate.
The Maputo railway line is located in the southern part with another railway line running parallel along
the length of the KNP. Numbi and Phabeni Gates are two existing gates to the park, two alternative
gates are proposed at Makoko and another at Luphisi.
The zone aimes to achieve the internationally competitive tourism and conservation initiatives are
supported in this zone to strengthen the Tourism Biodiversity Conservation Initiative between
Swaziland and Mpumalanga; the feel and experience of the Kruger National Park is projected into the
municipality, which need to be retained and strengthened as it serves as a distinguishing feature and
has excellent marketing potential; improve access to the Kruger National Park, especially from the
Kruger Mpumalanga International Airport, N4 highway and railway line running parallel to the park’s
border; exploit the tourism potential provided by the existing Kruger Park Gates and north-south
railway line running along the KNP boundary and the use of land in this zone should be in support and
complimentary to the Kruger National Park and should serve as an interface between the park and
the Urban Development Zone.

2.10.3.3 Kiepersol-White River Agricultural Zone

This area roughly stretches from Sabie River in the north to the R37 Lydenburg road in the south, the
North-Sand River in the east and the municipal boundary in the west. Commercial farming dominates
the area (mainly subtropical farms along the Sabie River and in the Kiepersol area) and forestry
plantations. The Kiepersol and Big 5 Centre provide day-to-day services to surrounding farming
communities. Sabie, North-Sand, White River, Sandspruit and Nelsriver are prominent rivers crossing
this zone including 3 dams namely Da Gama, Longmere and Klipkopje.
The area is backboned by the R40 route, which is the main road from Mbombela to Hazyview. The
R538 is a major collector road linking White River with Hazyview through Swalala. Regional access
roads include the R37 to Lydenburg and the R536 and R537 to Sabie.
Tourist developments opt to locate along the R537 road between Hazyview and Sabie, around the 3
dams and along the R538 road between White River and Legogote. The zome aims to utilise tourism
facilities for permanent or long-term residential use needs to be restricted; develop rivers, natural
forests and wetlands is restricted and shall only be allowed after legal environmental procedures have
been conformed with; promote sand mining and discourage urban encroachment.

2.10.3.4 Western Agricultural Zone

This zone is located in the western part of the municipal area, west of the R40 road and characterised
with steep slopes, high rainfall and various localities where mining took place in the past. Today this
area is dominated by commercial agriculture including forestry plantations on the higher lying areas
and intensive agriculture in the valleys along the Elands and Crocodile Rivers and their tributaries.
Rural service centres includes Ngodwana, Kaapsehoop, Elandshoek and Alkmaar.
A number of small industries have established in the area. Forestry villages are located at
Houtboschoek (SAPPI) and Berlin (Komatiland Forest). Food processing factories are located at
Barvale Farm (SAD), Solomon’s Farm and Alkmaar. Numerous tourist facilities are situated along the
N4 highway, including restaurants, tea rooms, hotels, guest houses, lodges, fruit stalls and curios

147

shops. The Sudwala Caves, Schoemanskloof and Kaapsehoop are the most prominent tourist
attractions in the area.
The N4 highway and Gauteng-Maputo railway line are the main linkages traversing the area. Other
important links include the R539 to Sabie via Sudwala caves and the Ngodwana-Kaapsehoop-
Mbombela link

The zone aim to achieve the following:
? Regional access provided by the N4 Maputo Development Corridor needs to be exploited by
focusing on strategically placed tourism developments as well as agri- and forestry industries.
The mobility function of the N4 should however not be impeded.
? The Sudwala Caves, known to be the world’s oldest dolomite caves needs to be promoted as
a tourism attraction point, together with Kaapsehoop, Schoemanskloof and surrounding
archaeological sites, heritage sites and nature reserves.
? The existing rural service centres of Kaapsehoop, Nogodwana, Elanshoek and Alkmaar
should not be viewed as focus areas for future growth.
? High potential agricultural land along the Crocodile River catchment area needs to be
protected and be used for commercial farming. Linkages should be improved to market
areas.
? Small scale downstream beneficiation of agricultural products should be actively promoted, as
these activities can contribute to the growth of the local economy.
? To optimise and further develop the agricultural, forestry and tourism potential of this area.

2.10.3.5 Central Agricultural Zone

This triangular piece of land is centred between the N4, R40 and R538 surrounded by Mbombela,
White River, Plaston, KMIA and Karino. Mountainous areas and high potential agricultural land
constitutes the area and includes developments such as Wild Fig Country Estate and Likweti Private
Game Reserve.
Prominent rivers traversing the area include White River in the east and the Crocodile River in the
south including the Primkop and Friedenheim Dams. Minor district roads are located the northern
part of this zone.
The zone aimes to achieve the regional access provided by the N4 Maputo Development Corridor,
proximity of the KMIA, R538 and R40 roads needs to be exploited by focusing on strategically placed
tourism developments as well as agri-industries; the mobility function of the N4, R538 and R40 should
be protected by any development in this zone; high potential agricultural land needs to be protected
and be used for commercial farming and land uses in this zone shall support the development
envisaged around the Kruger Mpumalanga International Airport and IDZ along the Karino-KMIA-
Plaston activity corridor.

2.10.4 MBOMBELA GOLDEN TRI ANGLE

The Golden Triangle also plays a role in the overall spatial development of the municipality. The
Golden Triangle has been designed in line with the 7 spatial strategies outlined in the previous section
and the National Spatial Development Perspective principle of developing the area according to its
potential. The N4 has been identified as the area with industrial potential, where as the R40 road has

148

been identified as the area with tourism potential due to the existence of Kruger National Park. The
Spatial Development Framework (SDF) that is in the process of review will give effect to the Golden
Triangle. Figure 2.10.4 below illustrates the Golden Triangle of MLM.

Figure 2.10.4: The Golden Triangle of Mbombela Local Municipality

Source: MLM GIS, 2013

The yellow notation symbolize the “yellow belt” along the N4, starting from Machadodorp/ZASM
tunnel towards Matsulu/Maputo; green notation symbolize the “green belt” for tourism that starts from
Machadodorp/ZASM tunnel to Hazyview. The green notation also covers the R40 road to Hazyview.
The blue notation symbolize the “blue belt” from Hazyview, Nsikazi and towards Matsulu, where
infrastructure, particularly water need to be provided.

2.11 RURAL DEVELOPMENT, AGRICULTURE AND LAND REFORM

Rural development linked with agriculture and land reform is a key strategic priority by all spheres of
government aimed at creating integrated and sustainable human settlements with access to basic
services, viable and sustainable agricultural and none agricultural rural-based enterprises
development geared to build the local rural economy enhance rural livelihood development and food
security.

The basis and the rationale behind the MLM rural development strategy, linked with agriculture and
land reform is informed by the following government policy provisions and promulgations:

? Integrated and Sustainable Rural Development Strategy (ISRDS)

149

? Comprehensive Rural Development Program( CRDP)
? Land Tenure Security Bill
? Agricultural Sector Plan( ASP)
? Accelerated and Shared Growth Initiative for SA ( ASGISA)
? Industrial Policy Action Plan 2 ( IPAP 2)
? New Growth Path (NGP)

The MLM convened an all-inclusive Rural Development Summit on the 9
th
and 10
th
September 2011,
with the overriding objective to develop an integrated MLM home-grown rural development strategy
adaptive and aligned with the above policies for implementation purposes. The following primary
stakeholders participated into the Summit, as:

? Sector Departments: (7 National Departments): Department of Agriculture, Fisheries and
Forestry; Department of Rural Development and Land Reform+ regional Land Claims
Commission; Department of Trade and Industry; Department of Economic Development;
Department of Corporative Governance and Traditional Affairs; Department of Monitoring and
Evaluation; National Planning Commission.
? Sector Department: (3 Provincial Departments): Department of Agriculture, Rural
Development and Land Administration; Department of Economic Development, Environment
and Tourism; Department of Human Settlements.
? Research and Development Institutions: Council for Scientific and Industrial Research,
Agricultural Research Council & GTZ
? Commodity-based Organizations: Grain South Africa; SA Poultry Association/Developing
Poultry Farmers Organization; South African Pork Producers Organization
? Development Finance Institutions: Industrial Development Corporation, Development Bank of
Southern Africa, National Development Agency, National Youth Development Agency,
Mpumalanga Economic and Growth Agency.
? Livestock/Poultry Producers: Communal/tribal projects, Redistributed land projects &
Restituted land projects.
? Crop/Grain Producers: Communal/tribal projects, Redistributed land projects & Restituted
land projects.
? Private Sector partners: Heidel Eggs, Earth-oil SA; Naledi Developments; Lehakwe Capital,
B.Biyela Consultants; Feed-master.

The Summit adopted the MLM Rural Development Strategy, anchored by key three pillars, as:
? Rural infrastructure planning in the areas of basic infrastructure and ward-level planning and
governance through harnessing the functionalities of existing community-based institutions
and utilization of the National Youth Service Corps/Brigades.
? Institutional mechanisms and co-ordination on development of a statutory legal entity(
Mbombela Rural Development Council), a replica of the Presidential Advisory Group model,
to act as a strategizing Think Tank/Fora to advice the MLM on rural development, human
settlements, agriculture, land reform and economic development in general
? Establishment of an agricultural-based development zone/development corridor ( to be
captioned as the ADZ) based on a mixed farming model incorporating priority high impact
commodities with potential to stimulate and raise the MLM GGP/GDP.

150

The Rural Development Strategy will be reviewed in the 2015/2016 financial year in order to align with
the IDP priorities.

151

2.11.1 Implementation of Summit Resolutions

The pre-Summit and immediate post-Summit era has been characterized by extensive consultative
processes, which as part of the Summit proceeds the following milestones have been achieved:
? Ten (10) MLM-based Co-ops have been established to represent the small-scale commodity
producers across the agricultural value chain, and the 10 Co-ops are : Broilers, including free-
range chickens; Layers/Eggs; Hatchery; Feed-mill/Granular Plant; Abattoir; Grain; Essential
Oils; Fisheries; Piggeries; Nursery & Vegetables)
? The Co-ops will qualifinancial year for grants, captioned as Co-ops Incentive Scheme, for
purposes of acquiring initial seed capital.
? A site research and visitations were conducted by the MLM with the 10 Co-ops to the North
West( Poultry Value-Chain/Koster at the invitation of the Kuipers Group/ an RSA and Holland-
based entity& Essential Oils/Vegetables/Kroondale at the invitation of Earth-oil SA headed by
former CSIR chemistry specialists) with the objective to access hands-on
? Business Development Planning (BDP) for the overall value chain to be conducted and
underway, with Requests for Proposals from Professional Services Providers being evaluated
for immediate appointment.
? Detailed conceptualization processes of the ADZ were interacted with relevant sector
departments and involved entities towards an extent of soliciting maximum collaboration, buy-
ins and consent for the de-commissioning of the ADZ.

2. 11.2 Current Situational Analysis on the ADZ processes

The MLM seeks to engage with a project-based strategy and approach geared to facilitate the
establishment of an Agricultural-based Development Zone(ADZ), be located in the Eastern Corridor
development axis as follows:
? A centralized production and processing facilities in the short term for the overall poultry value
chain to be located at the farm described as Peebles 31 JU a land Restitution project under
the Mbayane Community Trust, adjacent Mganduzweni, Jerusalema, Swalala, Mshadza
Communal/tribal land
? Decentralized poultry production units with broiler inherited through the land and agrarian
reform program across the MLM jurisdiction, which will enter into Out-grower or Contract-
buying Schemes with the ADZ in the medium term
? Essential Oils cluster with a 100ha plantation and Distillation Factory in the short term to be
located at the farm Kaapscheblock a land Redistribution project under the Sibuyela
KaMajabula Trust adjacent Sandriver and Mahushu Communal land; project to undertake the
Out-grower or Contract-buying scheme/model in the medium term.
? Fisheries and piggeries cluster with units/houses and processing facilities to be located at the
farm described as Peebles 31 JU a land Restitution project under the Mbayane Community
Trust, adjacent Mganduzweni, Jerusalema, Swalala, Mshadza Communal/tribal land
? Nursery and Vegetables production and packaging facilities in the short term at the farm
described as Hermansburg a land Restitution project under the Endlovini Communal Property
Association adjacent Mataffin/old Airport

152

? Nursery and Vegetables production in the medium term to be located at the Daanjie,
Mpakeni, Luphisi, Spelanyane & Mahuhube Communal land to undertake Out-grower or
Contract-buying scheme/model
? Out-grower/Contract-buying schemes to be explored through provision of seedlings and
fertilizers/manure to explore Masibuyele Emasimini surplus production in the areas of grain(
maize, sunflower, soya) to complement the ADZ grain components of the Feed-mill/Granular
Plant( stock-piling perspective)
? The South African Poultry Association/Developing Poultry farmers Organization and the
South African Pork Producers Organization have pledged to inject human resources (poultry
and veterinary specialists) respectively to support the ADZ, with respective remunerations to
be procured through the poultry and pork levy respectively.

2. 11.3 Project Commissioning Phase

The ADZ project has been commissioned through the appointment of Professional Services Providers
to develop a detailed Business Development Plan (BDP) as a roadmap to inform the implementation
of the mixed farming model. The BDP will present a sound and a commercial business case, with the
final product to reflect:
a) Determinations on the Capital Expenditure (CAPEX) for the whole ADZ with regards to
acquisition of requisite infrastructure and assets; CAPEX to be financed through the
Department of Trade and Industry grants/incentives and soft loan funding
b) Determinations on the Operational Expenditure (OPEX) for the whole ADZ with regards to
requisite recurrent/overhead costs to be incurred: OPEX to be financed through the MLM,
Development Finance Institutions (DBSA; IDC) and private equity conduits including
commercial banks
c) Determinations on the CAPEX for the requisite ADZ economic infrastructure requirements
and components (roads including access points to production units/facilities;
Energy/Electricity; Information and Communication Technology; Water; Sanitation), to be
financed through a joint Department of Trade and Industry Infrastructure Grant and
COGTA/DBSA/MLM Municipal Infrastructure Grant.
d) The Out-grower/Contract-buying scheme/model revitalization costs to be financed under the
DTI grants, and ADZ to retrieve 80% of live stock with 20% including mortality rates to be
reserved for poverty alleviation purposes sold at reasonable and affordable pricing structure
e) Determinations on the ADZ impact to the GGP/DGP ( rate and pace considerations)
f) Determinations on the ADZ employment intensity (rate and pace considerations on
sustainable and decent jobs).
g) Registration and formalization of a share equity company (Special Purpose Vehicle/SPV) to
develop best-use business practices on the business ownership and management model for
the ADZ not land ownership including infrastructure and assets which are under the nominal
ownership of government on behalf of the 10 Co-ops.

153

2. 11.4 Project De-commissioning Phase
It is the MLM considered opinion that the de-commissioning phase should commence prior end of
2014/15 Financial Year, with the initial commencement phases build around site establishment.
The other two pillars of the MLM Rural Development Strategy including possible crop or commodity
diversification models in particular citrus (lemon and navels) value chains to be initiated in the
immediate post-financial year end. Note that the DBSA has established a rural development
Department hence critical interactions and engagements will be forthcoming in the new fiscus year.

2.12 HUMAN SETTLEMENT AND LAND ADMINISTRATION

The municipality is faced with housing shortage or backlog. This problem has been exaggerated by
the lack of suitable land for residential development; shortage of serviced stands and inadequate
supply of housing subsidies by the Provincial Department of Human Settlements.

According to the Human Settlement Unit, the municipality is experiencing an estimated housing
backlog of 32 554 units. However, since 2009 new applicants were never taken as the national
government has introduced a new system of capturing applicants on the waiting list. The new waiting
list is now called National Demand Data Base [NDDB], which means that municipalities no longer own
such, but national would be controlling the process of allocation of units according to the database.
Accordingly, the waiting list would be phased out to allow the national demand database to its full
course in this financial year.

The municipality has developed a Housing Chapter which among other things highlights the housing
demand database or waiting list information for the entire municipality. The housing waiting list as per
the Housing Charter was prepared in consultation with the ward councillors, ward committee’s,
community development workers (CDW’s) as well as municipal officials, specifically from Human
Settlement Unit. Table 2.12 below indicates the housing waiting list per ward.

Table 2.12: The MLM housing waiting list per ward
WARD 1 WARD 2 WARD 3 WARD 4 WARD 5 WARD 6 WARD 7 WARD 8 WARD 9 WARD 10 WARD 11
550 1400 600 600 710 380 800 875 670 870 650
WARD 12 WARD 13 WARD 14 WARD
15
WARD
16
WARD
17
WARD
18
WARD
19
WARD
20
WARD 21 WARD 22
625 910 207 23 12 780 1705 1760 1900 780

1010
WARD 23 WARD 24 WARD 25 WARD
26
WARD
27
WARD
28
WARD
29
WARD
30
WARD
31
WARD 32 WARD 33
1150 1040 750 1350 1800 1080 765 400 400 575 2200
WARD 34 WARD 35 WARD 36 WARD
37
WARD
38
WARD
39

650

1100 650 475

310 710
Source: Mbombela Housing Charter, 2013

154

According to the above table, the total number of registered applicants on the waiting demand
database was 33 522 applicants, and 648 applicants have benefitted from the housing schemes.

The shortage of housing problem is also linked with the rapid population growth caused by the
migration of people in search of better job opportunities. The majority of these people come from the
two neighbouring rural municipalities such as Nkomazi Local Municipality and Bushbuckridge Local
Municipality. This has been exacerbated by the lack of a migration plan by the municipality, which the
municipality will prepare in the next financial year.

However, the municipality has identified suitable land for housing development around Mbombela,
Plaston, and White River. The suitable identified land is owned by the private sector, and the owners
have already made offers to the municipality. Hence the only challenge is funding. The municipality
has engaged other sister Departments to assist financially to acquire such land for integrated human
settlement.

Moreover, three (3) portions of land have been acquired by the Department of Human Settlements
and Rural development and Land reform. The properties will be used for the development of
integrated sustainable human settlement with full services. The properties include Casa da Lua (will
provide approximately 500 stands); White River (will provide approximately 400 stands) and
Maggiesdal (will provide approximately 800 stands). The municiapality has also identified Tekwane
North Extension 1 (will provide approximately 550 stands) and Matsulu Extension 6 (will provide
approximately 2500) for human settlement. All these properties have not been serviced as yet.

Currently the implementation of the housing projects is done by the Provincial Department of Human
Settlement and there is nothing that the municipality can do to fastract the delivery of houses.
Hovever, the municipality has applied for accreditation to administer all the housing related projects
and it is expected that the accreditation will assist the municipality in addressing its housing backlog.

In a bid to address the housing challenge, the municipality is in the process of drafting the Integrated
Housing Plan for the entire municipality. This will be done concurrently with the land audit, since it is
impossible to separate housing provision with land.

Moreover, the municipality has approved Alienation Policy that seeks to regulate the disposal and
acquisition of municipal land. The challenge is that the municipality does not have a Rapid Response
(Reaction Unit) Unit that is legislatively empowered to deal with illegal occupation immediately. The
newly established Law enforcement unit is not empowered to deal with such cases; they can only
accompany peace officers to deliver notices. It is important that the issue of the establishment of a
rapid response unit be investigated or the powers vested to the Law enforcement unit be revised in
order to deal with this matters urgently so.

2.13 ENVIRONMENTAL MANAGEMENT

The municipality is encountering the following challenges that have negative impact on the
environment:
? Destruction and pollution of wetlands;
? Illegal dumping/rubble dumping due to construction increasing as result of increasing
developments;
? Cleanliness of towns and unmanaged disposal sites;
? Illegal burials ( next to the streams or rivers)

155

? Illegal sand mining leaving the area un-rehabilitated
? Pollution of natural resources due to dilapidated / ageing sewage treatment networks;
? Air pollution as a result of emissions from some industries and high vehicle congestions on
the municipal roads.
? Climate change mitigating measures.
The municipality has a challenge of being exemplary in compliance with all environmental laws
especially in areas such as Water Works, Waste Treatment Works, and Solid Waste Disposal Sites
etc. Adherence to Environmental Management plans where soil excavations were conducted and
safe disposal of the remains after road constructions and any other structural developments. The
private sectors with interests in environmental management matters may not adhere to such laws.
The sensitive challenges identified on compliance with environmental laws are the construction of the
houses/industries in wetlands. The Section dealing with Environmental Management issues is having
one official. The size of the municipality requires at least seven officials at the minimum including the
Manager.

The municipality launched the Environmental Management Forum which comprises of both internal
and external stakeholders to address the environmental management programmes in a co-ordinated
and integrated manner. Various consultations were made with Communities to educate them on the
importance of wetlands. Working groups were formulated to represent the various zones.

The municipality will be reviewing the Environmental Management Framework in the 2014-2015
financial year in order to comply with environmental legislation. The framework will cover the
following:
? Environmental Management System
? The updated Environmental Management Policy
? Environmental Management by-laws

The municipality will also engage its communities to serve as watchdogs in identifinancial yearing the
environmental pollution. Council will through structured communication strive to ensure that
environmental pollution problems are identified early and addressed soon before they cause major
impact in the lives of flora and fauna as well as aquatic. The sporadic inspections will be conducted in
all corners of Mbombela boundaries. The availability of Environmental Science qualified Interns (while
the appointment of permanent officials is pending) will assist the department to ensure that regular
visits are conducted in all wards.

2.13.1 Environmental Education and awareness

The Environmental Management Section has realized the need to deal with environmental awareness
and education to create a platform for the experts to interact with the public to share any
environmental related matter for the purpose of learning and identifinancial yearing certain behavioral
trends from the side of the society. The strategy will be developed to ensure that the impact is felt
when the educational programmes are rolled out in the next financial years. The unit is encouraging
the public to participate in Adopt – a- spot initiatives. This means identification of the open space or
parks and making request to council to adopt the spot and green it. There are more than ten areas
adopted by the public and private sectors. All areas known to be unsafe and untidy are changing and
look green and safe as a result of adopt a spot initiative. Council is currently striving to mainstream
the waste minimization and recycling programmes to ensure that less waste reaches the landfill site.
The interested parties will through Local Economic Development concept be engaged and be guided
to follow proper legislative requirements while participating in recycling of waste in different forms.

156

Waste recycling has now become legislated in terms of National Environmental: Waste Act 59 of
2008. The environmental awareness and education programme strategy will be developed annually to
highlight all awareness programmes for the entire year. The programme will cover the community and
schools participation. The world calendar dates for the environmental programmes will be observed
such World Environmental Day (June month) etc.

2.13.2 Air quality management

Mbombela embarked on the sampling programme to detect the level of pollution in the ambient air;
this study will assist the National Department of Environmental Affairs to categorize the municipality
according to its level of exposure as far as air pollution is concerned. The six months results obtained
have depicted that the level of pollution is not exceeding those areas that are heavily polluted such as
Secunda. Concurrently council will develop its Air Quality Plan as required by National Environment:
Air Quality Act 2004. It will form part of the sector plans for the IDP in future. During the awareness
and education campaign the public is taught on the need to protect the environment by not burning
waste reduce dust by sprinkling the ground with water before sweeping. The unnecessary burning of
the land is totally discouraged in Mbombela. Any intentions to burn the dried grass need to be
communicated with the Fire and Rescue Services for control purposes. The continuous education
programmes on the radio and provision of pamphlets will make the society change their mindset and
stop burning waste or wood without any apparent reasons. The sister Municipality, Ehlanzeni District
Municipality is currently conducting the sampling programme to detect the level of pollutants emitted
by specific industries and provide advice where necessary. There is good relationship between
Mbombela and Ehlanzeni District Municipality (EDM) on matters of Air Quality legislative
requirements. The EDM have embarked on the Section 78 Feasibility study regarding the air quality
management matters. Mbombela is participating in the Air Quality Forums for the sharing of
knowledge and skills. In future there will be council air quality management plan and implementation
plans to deal with problems identified. It will link with Climate change mitigating measures strategies
for Mbombela.

2.14 EXPANDED PUBLIC WORKS PROGRAMME (EPWP)

Expanded Public Works programme (EPWP) is a nationwide programme covering all spheres of
government and state owned enterprises. It originates in the Growth and Development Summit 2003.
It aims to draw significant numbers of unemployed, unskilled people into productive work so that they
increase their capacity to earn an income It further serves as an opportunity to address social welfare
gap. It was launched in April 2004 to promote economic growth and create sustainable development.
The EPWP Phase 1 was to help alleviate unemployment by creating at least work opportunity, of
which 40% of beneficiaries will be women, 30% youth and 2% people with disabilities. The EPWP
Phase 2 aims at creating 2million Full Time Equivalent (FTE) jobs for poor and unemployed people in
South Africa so as to contribute to halving unemployment by 2014, through the delivery of public and
community services. Drawing on the success and lessons of this programme over the past five years,
R4 billion is added to this programme to incentivise the creation of long term more stable employment
in the province, municipalities and non- governmental organisations.
Mbombela has already committed itself to participate in EPWP by signing the declaration (March
2011). All the IDP capital projects will be registered under EPWP and will be reported accordingly to
the department of Public Works .The reporting model is available in the system and is user friendly.
The unit coordinating the EPWP projects will in collaboration with IDP office ensure that all IDP
projects indicate the estimated number of jobs to be created to ensure that EPWP projects are

157

properly coordinated and the reporting of jobs created improved. The prescripts of the EPWP policy
will be implemented for compliance with all National EPWP policy guidelines. The policy is clear on
the number of jobs to be created; this approach will serve as a tool for council to monitor itself against
the national targets.
All EPWP officials will offer the accredited Training programme to enable them to acquire skills which
will help them when they look for permanent jobs elsewhere. Every Friday the Political Principals
(Councillors) will visit the projects in all Planning areas. This day will be declared as EPWP Friday.
The deployment of EPWP beneficiaries in all corners of Mbombela will make the Mbombela City with
its small towns clean and health.
The EPWP Phase 2 term expires on the 31
st
of March 2014 and Phase 3 will start from 1
st
April 2014
until 31
st
March 2019 (five year National Programme). During the road show on awareness and
education for the EPWP Phase 3 it was learnt that municipalities will have to adhere to the DORA
(Division of Revenue Act) in terms of grant allocation and account on the actual grant expenditure.
The EPWP Unit in collaboration with the Department of Finance will ensure that the reporting of
EPWP jobs and expenditure thereof is done according to Public Finance Management Act 1999 and
Municipal Finance Management Act 2003. The implementation of the Municipal EPWP Policy will be
intensified to ensure that all jobs created are reported including the personal details of the
beneficiaries. Quarterly meetings will be held with all Departmental EPWP Patrons to improve on the
reporting of jobs to the National Department of Public Works. Business plans will be required from all
departments indicating the manner in which intensive labour will be utilised.

2.15 SWOT ANALYSIS

Based on the situation analyisis discussed above, the municipality’s SWOT analysis can be
summarized as outlined in table 2.15 below.

Table 2.15: MLM SWOT analysis

Strengths Weaknesses
? Good road network (N4 & R40)
? Close proximity to Swaziland, Mozambique, Gauteng
and Limpopo
? KMIA
? Subtropical climate is favourable for agriculture
? Kruger National Park and other tourist attractions
? Mbombela Stadium
? Numerous private developments in Mbombela
? Prominent finance and business sector
? Development of fresh produce market
? Development of Mpumalanga University
? Natural resources
? Lack of service infrastructure and many rural
gravel roads
? Poor service delivery
? Low levels of education
? High unemployment
? Large informal sector
? Poor infrastructure maintenance
? Poor waste management practices
? Traffic congestions
? Lack of funding for developments
? Uncoordinated planning

Opportunities Threats
? Maputo development corridor
? Growth in tourism sector
? Using technology and ICT infrastructure for service
? High crime rates
? Pollution and environmental degradation due
to overgrazing, erosion and deforestation,

158

delivery
? Green economy
? Technological changes in manufacturing
? Organic fruits and vegetables
? Numerous tourist attractions in surrounding
municipalities

mining and unmanaged manufacturing
? Large number of migrations into MLM
? Unplanned human settlements
? Electricity theft
? Lack of water for irrigation and human
consumption
? HIV/Aids
? Poaching

159

CHAPTER 3
MBOMBELA DEVELOPMENT STRATEGIES
_________________________________________________________________________________

3.1 INTRODUCTION

Section 25 of the Municipal Systems Act, 32 of 2000 requires that each municipal council must within
a prescribed period after the start of its elected term adopt a single, inclusive and strategic plan,
commonly known as Integrated Development Plan (IDP). The IDP must guide and inform all planning,
development, budgeting decisions of the municipality.
Section 26 (a) of the above said act also requires that the IDP must reflect the municipal council’s
vision for the long term development of the municipality. This chapter outline the municipal vision,
mission, motto, development objectives and priorities.

3. 2 VISION

A vision is defined as a statement that outlines what the organization wants to be in future. The
municipality’s vision is set out as follows:
“City of Excellence”

3. 3 MISSION STATEMENT

The municipality’s mission statement is as follows:
“A high performing and learning municipality that excels in development facilitation and
sustainable service delivery through Batho Pele and sound corporate governance principles”.

3. 4 CORE VALUES

In order to maintain a high level of service, the municipality adopted a set of values to guide the
behavior of all people towards the achievement of the mission and ultimately, the vision of the
municipality. The values seek to develop a culture that informs both the administrative as well as the
political components, to achieve the municipality’s vision. The values, commonly known as “THE
PEACESS” as be outlined as follow:

- T: Transparency
- H: Honesty
- E: Excellence to Communities
- P: Passion
- E: Efficiency
- A: Accountability
- C: Commitment
- E: Empathy

160

- S: Sustainability
- S: Selflessness

3.5 MOTTO

In addition to the core values, the municipality has adopted the following statement as a Motto:

“We never forget, we work with the communities”

3. 6 DEVELOPMENT PRIORITI ES

The municipality has adopted the following 13 priorities to be implemented within the period of 5 years
(2012-2017):

? Water supply
? Road infrastructure development and storm water
? Electricity supply and management
? Integrated human settlement
? Good governance and public participation
? Sanitation/sewerage
? Community development
? Rural development
? Economic development
? Waste management and greening
? Financial management and viability
? Public transport
? Revenue Enhancement
? 2010 legacy

3. 7 IDP DEVELOPMENT OBJECTIVES

In order to achieve the above development priorities, the municipality has adopted the following 7
objectives:

? To provide infrastructure and sustainable basic services
? To provide sustainable social amenties to the communities
? To strengthen the delivery of sustainable integrated human settlement and
environmental management
? To initiate a strong and sustainable economic development
? To build a strong good governance and institutional development
? To ensure legally sound financial viability and management
? To maintain and sustain the 2010 legacy projects

161

3. 8 ALIGNMENT OF IDP DEVELOPMENT OBJECTIVE AND PRIORITIES

Table 3.8 below shows the alignment between the Key Perfomance Areas, IDP development
objectives and development priorities.

KEY PERFORMANCE AREA
(KPA)
IDP DEVELOPMENT
OBJECTIVE
IDP DEVELOPMENT PRIORITY
Service Delivery and Infrastructure
Development
1. To provide infrastructure and
sustainable basic services
Water supply
Roads infrastructure development and
storm water
Electricity supply & energy
management
Sanitation / sewerage
Public transport
Rural development
Waste and environmental
management
Service Delivery and Infrastructure
Development
2. To provide sustainable social
amenities to the communities
Community development
Service Delivery and Infrastructure
Development
3. To strengthen the delivery of
sustainable integrated human
settlement and environmental
management
Integrated human settlement
Local Economic Development 4. To initiate a strong and
sustainable economic
development
Economic development
Institutional Development and
Transformation
Public Participation and Good
Governance
5. To build a strong good
governance and institutional
development
Good governance & public
participation
Public Participation and Good
Governance
Financial viability and
management
6. To ensure legally sound
financial viability and management
Financial management
Revenue enhancement
Cross Cutting Issues 7. To maintain and sustain the
2010 legacy projects
2010 legacy
Community development

162

CHAPTER 4
AUDITOR GENERAL (AG) REPORT AND MEC’S COMMENTS
_________________________________________________________________________

4.1 INTRODUCTION

This chapter outlines the findings from the Auditor General (AG) and comments of the MEC for
Coorperative Governance and Traditional Affairs.

4.2 AUDITOR GENERAL ( AG) REPORT

MLM received unqualified audit reports in the 2013/2014 financial year. The AG has raised certain
issues that need to be addressed, and table 4.2 below outlines the issues raised by the AG and how
the municipality is going address them.

Table 4.2: Matters raised by AG and the municipality intervention plan

No. Audit Matters Action plan to address findings as per the
Audit Report
Completion Date
1.

Emphasis of Matters:
Restatement of
corresponding figures

1.1 Annual update of the immovable asset
register.
30 June 2015
1.2 Annual update of the movable asset
register
30 June 2015
1.3 Prepare interim financial statements 28 February 2015
1.4 Implement financial year-end plan 30 June 2015
1.5 Outstanding invoices and purchase
orders to form part of standing item on
monthly departmental meetings agendas
Monthly and
ongoing
2.

Emphasis of matters:
Material losses

2.1 Implement the water conservation and
demand management strategy – repair of
water leaks, remove illegal connections.
30 June 2015
2.2 Repair and replace of faulty bulk and
domestic water meters.
30 June 2015
2.3 Securing of water tankers filling points,
installing bulk water meters at the filling
points and introduce a private water tankers
tariff charge
30 June 2015
3.

Emphasis of matters:
Material impairments

Implement revenue enhancement strategy -: 30 June 2015
3.1 Handover of outstanding municipal debts
to debt collectors
31 January 2015
3.2 Verification of municipal properties under
private occupation
30 June 2015
3.3 Payment incentive scheme – Rand to
Rand implementation
Ongoing
3.4 Intensify indigent registration strategy 28 February 2015

163

No. Audit Matters Action plan to address findings as per the
Audit Report
Completion Date
4. Predetermined objectives:
Adjustment of material
misstatements
4.1 Revise 2014/2015 Service Delivery and
Budget Implementation Plan
28 February 2015
5.

Compliance with legislation:
Expenditure management

5.1 Outstanding invoices and purchase
orders to form part of standing item on
monthly departmental meetings agendas
Ongoing and
Monthly
5.2 Improve cash flow management by
implementing austerity measures and
revenue enhancement strategy
31 January 2015
5.3 Implement activity based costing system
on water and sanitation services
Ongoing
5.4 Improve the invoice and purchase orders
tracking system
Ongoing
5.5 Implement the policy and procedures on
irregular, unauthorised, and fruitless and
wasteful expenditure approved by council on
08 August 2014.
Ongoing
5.6 Integrate the National Treasury tender
defaulters register on the electronic
procurement system.
28 February 2015
5.7 Update of the suppliers’ database 31 March 2015
5.8 Conduct verification of declarations
information by bidders
31 March 2015
5.9 Conduct internal supply chain
management awareness campaign
Ongoing
5.10 Appoint maintenance contractors on a
biennal contracts
30 June 2015
5.11 Intensify contract management 30 June 2015
5.12 Review all month to month contracts 31 March 2015
5.13 Review financial and supply chain
management delegations
31 December 2015
6.

Compliance with legislation:
Procurement and contract
management

6.1 Integrate the National Treasury tender
defaulters register on the electronic
procurement system.
28 February 2015
6.2 Intensify contract management 30 June 2015
7. Internal control: Leadership 7.1 The appointment of Municipal Manager to
fast track the appointment of the Chief
Financial Officer
31 June 2015

164

No. Audit Matters Action plan to address findings as per the
Audit Report
Completion Date
8.

Investigations

8.1 The investigation was concluded on 22
October 2013 and resulted in disciplinary
hearings and criminal proceedings being
instituted against two employees
30 June 2015
8.2 An independent consulting firm is
performing an investigation at the request of
the municipality, which covers the period
2011 to 2014
15 December 2014
8.3 Implement the findings and
recommendations of the excess overtime
claims report
31 January 2015
8.4 An independent consulting firm is
performing an investigation at the request of
the municipality, which covers the period
2013 to 2014
15 December 2015
8.5 Implement the findings and
recommendations of the security services
report
31 January 2015

4.3 MEC’S COMMENTS
The municipality has received positive comments from the MEC for Department of Co-operative
Governance and Traditional Affairs. Table 4.3 outlines the issues raised by the MEC and how the
municipality has managed to address them.
Table 4.3: Matters raised by MEC and the municipality intervention plan

No. MEC Query Intervention
1. The municipality must include the
capital investment framework of
the SDF in the IDP
SDF is the component of the IDP. All the projects in
the IDP are informed by the SDF.
2. The municipality must develop a
Comprehensive Infrastructure
Plan that will promote integrated
provision of infrastructure
services
The Comprehensive Infrastructure Plan will be
developed in the 2015/16 financial year. Refer to the
municipal projects in Chapter 7.
3. The sectoral strategies from the
LED strategy are not included in
the IDP
The sectoral strategies from the LED strategy are
included in the IDP. Refer to Chapter 2, under item
2.9.
4. There is no status quo with regard
to current transformation needs
and progress reporting in the
The information on the implementation of the HR
policies and WSP is provided in Chapter under item

165

No. MEC Query Intervention
implementation of the HR related
policies and WSP
2.2.2 of the IDP.
5. There is no chapter on disaster
management to include the risk
profile and the municipal capacity
to deal with possible disasters
The Chapter will be included in the 2016/17 financial
year after the finalisation of the disaster management
plan.
6. The municipality did not include
the 5-year performance plan which
contains Council’s objectives and
targets per year.
Council’s 5-year development objectives and priorities
are included in Chapter 3 of the IDP. The 5-years
targets will be included in the new IDP which will be
developed in the 2016/17 financial year after the local
government elections.
7. The Municipal Manager must
spearhead the IDP Review process
to ensure institutional support on
the IDP process
IDP is spearhead by the Municipal Manager. The
Municipal Manager is the Chairperson of the IDP
Technical Committee which report to the IDP Steering
Committee chaired by the Executive Mayor.
8. There is no proper 3 year
infrastructure planning and
MTREF budgeting
There is proper 3 year infrastructure planning. The
MTREF budgeting is provided in Chapter 7 of the IDP.
9. The municipality must repriotize
the 2014/15 IDP and direct 100% of
its budget to water projects
The 2014/15 IDP was amended on 21 August 2014,
Resolution A (2) to repriotise water projects as the
PCF resolution.
10. Instracture O & M plans must be
developed and the O & M budget
must be ring-fenced in the IDP
The municipality do have Infrastructure O & M plan
and its budget is ring-fenced in the IDP. Refer to the
financial plan in Chapter 5 of the IDP.
11. The municipality must prioritise
projects in line with the SDF to
accommodate future growth
As alluded in 1 above, projects in the IDP are
informed by the municipal approved SDF.
12. The 2015/16 IDP review process
must be aligned with the
provincial planning & budgeting
cycle as adopted by Exco in June
2012.
The municipality will ensure that the 2016/2017 IDP
process is aligned to the provincial planning &
budgeting cycle as per Exco resolution.

166

4.4 CONCLUSION
In a bid to achieve the Clean Audit, the municipality has developed an implementation /intervention
plan commonly known as the Clean Audit Road Map to address the matters raised by the Auditor
General (AG) in the 2013/2014 financial year.
Moreover, the municipality has addressed the issues raised by the MEC for Co-operative Governance
and Traditional Affairs.

167

CHAPTER 5
FINANCI AL PLAN (2014-2017)
_________________________________________________________________________________

5.1 INTRODUCTION

The 2015/2016 – 2017/2018 draft budget and medium-term revenue and expenditure framework
(MTREF) was prepared based on the fundamentals of the municipal developmental priorities
tabulated on the Integrated Development Plan. The following are the municipal developmental
priorities which the budget should be responding to in terms of prioritisation and allocation of funds
and resources;

(a) Water supply;
(b) Road infrastructure development and storm water;
(c) Electricity supply and management;
(d) Integrated human settlement;
(e) Good governance and public participation;
(f) Sanitation;
(g) Community development;
(h) Rural development;
(i) Economic development;
(j) Waste and environment management;
(k) Financial management and viability;
(l) Public transport;
(m) Revenue enhancement; and
(n) 2010 legacy.

The guidelines and assumptions in accordance with the Municipal Finance Management Act and its
Regulations and Circulars as well as other relevant legislations have also been taken into
consideration, including the prevalent macro and internal environment factors.

The 2015/2016 draft budget is prepared in the midst of the implementation of the turnaround strategy
approved by the municipal council on 21 August 2014, under item A(3). The turnaround strategy is
implemented in order to address in the following key matters which impact negatively on the
administrative and operational capacity of the municipality;

(e) Financial Management – comprising of matters of revenue enhancement, cost curtailment,
fleet management, supply chain management and clean audit roadmap.

(f) Service Delivery – comprising of acceleration of spending on capital projects, water supply
interventions, waste management and cleanliness, repairs and maintenance of the municipal
infrastructure.

(g) Governance and Institutional Development – comprising of filling of critical vacant positions,
risk management, performance monitoring and evaluation, internal audit, system of delegations of
powers and functions, ICT governance etc.

(h) Social and Economic Development – comprising of local economic development strategy,
rural development, spatial planning, integrated human settlement etc.

168

The aforementioned matters formed the basis of the following budget objectives over the medium-
term;

(g) To manage risks associated with unstable financial position, underperformance on service
delivery, address governance and institutional development challenges;
(h) To improve financial performance and sustainability over the long term;
(i) To ensure the citizens of the municipality are provided with acceptable levels of services;
(j) To maintain the existing assets and infrastructure base by ensuring adequate repairs and
maintenance is undertaken;
(k) To achieve a clean audit outcome.
(l) To enable local economic development initiatives and sustainable employment creation.

The municipality has started addressing the challenges that have been affecting the performance of
the municipality in the previous financial year in the 2014/2015 financial year with the implementation
of the turnaround strategy. The preparation of the 2015/2016 draft budget takes cognizance of the
fact that the municipality is in the midst of the implementation of the turnaround strategy and should
these factors continuously addressed as per the turnaround strategy, the aforementioned objectives
of the budget will not be achieved.
.
5. 2 MACRO ENVIRONMENT FACTORS – ECONOMIC OUTLOOK

From a macro environment perspective, the economic performance over the medium-term looks bleak
as a slow economic growth trends has been forecasted and the reflections of this unfavourable
economic growth condition will impact negatively on all spheres of government. The revenue base of
the municipality will be under pressure as no new revenues will be derived at the moment due to the
slow economic growth and local circumstances.

As a consequence of the distress economy a conservative approach will need to be adopted when
projections are made for expected revenues cash receipts in the next medium-term.

On the expenditure side - careful analysis and evaluation of the current spending patterns need to be
conducted so that the allocation of funds in the next medium-term is in line with the key municipal
priorities and non-priority spending is eliminated (austerity measures need to be implemented).

The South African economic growth outlook measured in terms of real Gross Domestic Product
(GDP) in 2014 to 2018 is expected to be as follows;

Description 2014
Actual
2015
Actual
2016
Estimate
2017
Forecast
2018
Forecast
Real GDP 2.2% 1.4% 2.0% 2.4% 3.0%

The consumer price inflation is expected to stay within the 3 to 6 per cent inflation target set by the
South African Reserve Bank over the medium-term. The national economic growth will be under
pressure and as the economy will be growing on an average of 2.5 per cent over the medium-term
which is far less than the annual national economic growth target of 5 to 7 per cent set by the National
Development Plan. The slow economic growth impacts negatively on the reduction of poverty,
inequality and unemployment.

169

The forecasted headline inflation for medium-term will be as follows;

Description 2014
Actual
2015
Actual
2016
Estimate
2017
Forecast
2018
Forecast
Inflation Outlook 5.6% 6.2% 5.8% 5.5% 5.3%

5. 3 REVENUE ENHANCEMENT ASSUMPTIONS

(a) Grants allocations

The total grants allocated to the municipality in terms of the 2015 Division of Revenue Bill (DoRB)
amounts R3 143 billion over the medium-term, reflecting an increase of R264 million (8%) and the
total allocation for 2015/2016 budget year is R981 million. The table below provides details regarding
the 2015/2016 grants allocation over the medium. The total grant in-kind allocation over the medium-
term amounts to R313 million.

170

The table below provides details regarding the 2015/2016 grants allocation over the medium.

DESCRIPTION Forecast Forecast Forecast Forecast
GRANT 2014/2015 2015/2016 2016/2017 2017/2018
OPERATING GRANT 14% 19% 9% 8%
Equitable Share 388,663,000 R 462,073,000 R 503,877,000 R 544,750,000 R
Municipal Sytems Improvement Grant (MSIG) 934,000 R 930,000 R 957,000 R 1,033,000 R
Financial Management Grant (FMG) 1,600,000 R 1,600,000 R 1,625,000 R 1,700,000 R
Expanded Public Works Programme 6,040,000 R 6,899,000 R - R - R
Water Service Operating Grant
TOTAL OPERATIONAL ALLOCATION 397,237,000 R 471,502,000 R 506,459,000 R 547,483,000 R
Growth (%) 15% 19% 7% 8%
CAPITAL GRANTS
Municipal Infrastructure Grant (MIG) 286,043,000 R 298,264,000 R 310,919,000 R 329,889,000 R
Municipal Water Infrastructure Grant (MWIG) - R 55,000,000 R 47,372,000 R 42,550,000 R
Neighbourhood Development Partnership Grant 5,000,000 R 20,000,000 R 30,000,000 R 35,000,000 R
Public Transport Infrastructure and Systems Grant 195,191,000 R 116,540,000 R 122,088,000 R 132,498,000 R
Water Service Operating Subsidy Grant 15,000,000 R 20,000,000 R 15,000,000 R 20,825,000 R
Intergrated National Electrification Programme 10,000,000 R - R 7,000,000 R 15,000,000 R
Electricity Demand Side Management - R - R - R
TOTAL CAPITAL ALLOCATION 511,234,000 R 509,804,000 R 532,379,000 R 575,762,000 R
Growth (%) 29% 0% -4% 8%
TOTAL ALLOCATION 908,471,000 981,306,000 1,038,838,000 1,123,245,000
Growth (%) 22% 8% 6% 8%
IN-KIND ALLOCATIONS
Regional Bulk Infrastructure - 30,000,000 30,000,000 48,000,000
Intergrated National Electrification Programme 76,117,000 50,438,000 74,115,000 77,321,000
Water Services Operating Subsidy 300,000
Municipal Water Infrastructure Grant 18,151,000
Neighbourhood Development Partnership Grant 1,567,000 1,785,000 600,000 600,000
TOTAL IN-KIND ALLOCATION 96,135,000 82,223,000 104,715,000 125,921,000

(b) Revising of rates, tariffs and other charges

The revision of the rates, tariffs and other charges for the 2015/2016 budgets and MTREF should take
into account the labour (i.e. the wage agreements with unions) and other input costs of services
provided by the municipality, the need to ensure financial sustainability, local economic conditions and
the affordability of services, taking into consideration the municipality’s indigent policy.

National Treasury continues to encourage municipalities to keep increases in rates, tariffs and other
charges at levels that reflect an appropriate balance between the interests of poor households, other
customers and ensuring the financial sustainability of the municipality.

To ensure the municipality continue to efficiently deliver services, eradicate backlogs in term of
services and social infrastructure, maintain, upgrade and renewal of the existing infrastructure as well
as ensuring financial stability and long-term sustainability, the increase of rates, tariffs and other
charges over the medium-term is proposed to be as follows;

Description 2012/13
Actual
2013/14
Actual
2014/15
Actual
2015/16
Propose
d
2016/17
Forecast
2017/18
Forecast
Electricity 12.0% 8.0% 8.06% 12.20% 12.20% 12.20%
Water 9.75% 8.0% 8.5% 38.0% 37.0% 35.0%

171

Sewer 9.75% 8.0% 8.5% -18.0% -18.0% -18.0%
Refuse Removal 10.25% 9.50% 10.0% 8.0% 8.4% 8.8%
Property Rates 6.5% 6.5% 0.0% 6.0% 6.0% 6.0%
Other tariffs 11.0% 12.0% 12.0% 12.0% 12.0% 12.0%
Sembcorp Water and
Sewerage –
Domestic users
10.42% 9.0% -
13.5%
10.33% 10.31% CPI + 3% CPI + 3%
Sembcorp Water and
Sewerage –
Business users
10.42% 9.0% -
18.0%
10.33% 10.31% CPI + 3% CPI + 3%

The above table reflects that the average increase on rates and service charge tariffs for 2015/2016 in
the municipality serviced areas will be 9.24 per cent and 9.06 per cent over the medium-term.

Sembcorp tariffs increase is determined in accordance with tariff model stipulated on the Service
Agreement Three (3) which takes the current consumer price indexes (CPI) per commodity plus a
margin of 3% and other economic factors into account.

The municipality should ensure the revision of its electricity tariffs is in line with the National Energy
Regulator of South Africa (NERSA) guidelines of 12.20 per cent increase in 2015/2016. The recent
reapplication by Eskom to have an additional electricity tariff increase of 12.31 per cent in 2015/2016
in addition to the 12.69 per cent approved by Nersa poses a serious financial risk to the municipality.

In ensuring the municipal tariffs and fees for services are cost reflective, the following processes will
be conducted by the municipality;

? The water and sanitation tariffs and fees which are cost-reflective (A new water and sanitation
cost structure based on the activity based costing system) will be implemented in 2015/2016
resulting in an increase of water tariffs by an average of 36 per cent over the medium-term and
decrease in sanitation tariffs by an average of 18 per cent over the next five (5) years.

? The electricity cost structure will be reviewed utilising the activity based costing system and the
revised cost structure and cost reflective tariffs will be implemented in 2016/2017.

? The solid waste cost-reflective tariffs will be implemented in 2016/2017 when a new solid waste
cost structure based on the activity based costing system is implemented.

? The Licensing function will be subjected to a cost structure review by 30 July 2015 and the
agency agreement with the Provincial Department of Safety and Security will be reviewed in
order to recovery the full cost of the rendering the services on behalf of the Department through
the agency fees.

172

(c) The ability of municipality to collect revenue

The payment level trend for the past three years and the forecast for the next medium-term, including
current financial year estimate is as follows;

Description
Actual
2012/13
Actual
2013/14
Estimate
2014/15
Estimate
2015/16
Forecast
2016/17
Forecast
2017/18
Payment Levels 93% 95% 93% 95% 95% 95%

5.4 OPERATING EXPENDITURE GUIDELINES AND ASSUMPTIONS

The operating expenditure will increase by an average of 7.19% in 2015/16, 8.14% in 2016/17 and
8.01% in 2017/18 with an exception of the key cost or expenditure drivers stated on the table below;

Operating Expenditure: 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018
Employees Related Cost 6.85% 6.80% 6.00% 6.90% 6.70%
Councillors Remuneration 5.80% 6.10% 6.00% 6.00% 6.00%
Contracted Services 7.49% 6.28% 5.08% 6.28% 6.13%
Bulk Purchases: Electricity 9.00% 8.06% 14.24% 14.24% 14.24%
Bulk Purchases: Water 5.80% 8.30% 6.50% 8.10% 7.90%
Other Materials 8.80% 8.44% 7.12% 8.40% 8.24%
Transfers and Grants 6.10% 7.68% 6.28% 7.62% 7.45%
Other Expenditure 6.10% 7.68% 6.28% 7.62% 7.45%
Average Increase % 6.99% 7.42% 7.19% 8.14% 8.01%

5.5 CAPITAL EXPENDITURE OVER THE MEDIUM-TERM

The funding of the capital expenditure will be sourced from conditional grants allocations, external
loans (borrowings) and internal reserves. No new external loans (borrowings) will be sourced during
the medium-term. The borrowings funding source in 2014/2015 will be a portion of the external loan
of R160 million taken in October 2013.

5.6 PROVISION OF FREE BASIC SERVICES

The Indigent Policy of the municipality as approved by Council in 2003 is in line with the National
Policy on provision of Free Basic Services with its objective of providing free access to basic services
to the poor and enhancing the fight against poverty. This policy is being reviewed to be in line with the
requirements proposed by the National Department of Cooperative Governance and Traditional
Affairs on an annual basis.

173

The following assumptions were also taken into consideration towards the provision of free basic
services;

? Reducing the impact of poverty through free basic service provision.
? Protecting the poor from the harsh economic realities.

The municipality will be offering the following free basic services:

Free Basic Water 6kl per month
Free Basic Electricity 50kW per month
Free Basic refuse removal 100 % subsidy on tariff
Rebate on property rates Rebates ranging from 25% to 100% and first R80 000.00
market value being 100% exempted from rates.
Free Basic Sewer 6kl per month

5.7 OTHER CONSIDERATIONS

(a) The implementation of National Treasury Standard of Chart of Accounts (SCOA) by all
municipalities on 01 July 2017.

(b) The re-demarcation of the municipal boundary (proposed amalgamation with uMjindi Local
Municipality).

(c) To ensure maximum participation of the nine (9) Traditional Leaders Council in the municipal
council business a sitting allowance will be introduced in line with the Ehlanzeni District
Municipality’s policy.

(d) As part of the process of the implementation of the turnaround strategy to improve financial
performance and cashflow, the following measures (Twelve (12) point plan) are proposed to be
implemented;

174

No. Item Description
Projected revenue /
savings
Responsible Time frame
1 Overtime
Expenditure
Reduction of overtime expenditure of
R52 million per annum by 25% per
annum.
Cost reduction of R13
million per annum will be
realised
All Departments 01-Apr-15 to 30-
Jun-16
2 Fleet management Reduction of fleet related expenditure
of R31 million for 310 motor vehicles
by 15% per annum.
Cost reduction of R4,7
million to be realised per
annum
Finance 01-Nov-14 to 30-
Jun-16
3 Water losses Reduction of water losses from 40,5
(R54 million) % to 25 % over the
medium term at 15 % per annum
Additional revenue R8
million revenue will be
generated
Finance, and Water
and Sanitation
01-Apri-15 to 30-
Jun-2016
4 Electricity losses Reduction of electricity losses from
21% (R42 million) to the norm of 10 %
over the medium term
Additional revenue of R20
million can be generated.
Finance and
Infrastructure
Development
01-Apr-15 to 30-
Jun-16
Capital expenditure performance of
70% is achieved
All Departments 30-Jun-15
Capital expenditure performance of
90% is achieved in 2015/2016
Procurement planning for
2015/2016 to start in April
2015 after adoption of
2015/2016 draft budget
All Departments 30-Jun-16
6 Expired contract for
supply of goods
and services
Repairs and maintenance contracts
for supply of goods and services to be
reviewed and advertised
Reduction in cost due to
non-essential of certain
contracts for supply of
goods and services
All Departments 01-Apr-15 to 30-
Jun-16
7 Eskom Bulk
Electricity Account
Arrears
Settle the Eskom bulk electricity
account arrears
The saving on interest
charges of R1.2 million
average per month will be
realised
Finance 31-Mar-15
8 Cost reflective tarif
structure
Implementation of the cost reflective
tariff structure for the water and
sanitation tariffs over the medium
term
Additioanl revenue of R 76
million to be generated over
the medium term
Finance 1-Jul-15
9 Equitable share Implementation of the new equitable
share formula by National
Treasurywhich indicates an increase
of the grant by 19% from an average
of 11 % in 2015 / 2016
Equitable share allocation
for 2015/2016 increase by
R74 million to R462 million -
if the average 11% was
applied, it would have
increase by R43 million
Finance 2015/2016
Handing over of outstanding municpal
debt of R 237 million to external debt
collectors with a projected collection
of 60% over the medium term
28-Feb-15
Incentivise the collectors with an
additional 3% subject to collection
within the required time frames
31-Mar-15
Incentive Scheme
for good payers
Introduction of a reliable customer
payment discount incentive. 1 %
discount on accounts that are paid in
full on a monthly basis not later than
7th of each month.
R12m in foregone income. Finance 1-Jul-15
Introduction of a once - off traffic fines
amnesty programme on outstanding
traffic fines amounting to R65 million
for the month of May and June 2015.
A 50 % discount on outstanding traffic
fines be implemented during the
amnesty period
Community Services 30-Jun-15
Appointment of external debt collector
for the collection of outstanding traffic
fines after the amnesty period on a
commission basis.
Finance 31-Aug-15
12 Stadium
Management
Selling of naming rights for the
Mbombela Stadium
A projection of R5 to R10
million per annum is
projected.
Community Services 1-Jul-15
TWELVE (12) POINT PLAN CASHFLOW PERFORMANCE IMPROVEMENT
11 Traffic fines
R 142 million collected
over the medium term
projected as follows:
R43m - 2015/16
R43m - 2016/17
R56m - 2017/18
A hit rate of 60% is
projected resulting in
estimated collection of
R19m in outstanding fines.
Finance Debt Collection 10
5 Capital Expenditure
Performance

175

5. 8 BUDGET RELATED POLICIES

In order to manage the finances, the municipality has prepared financial policies as per the
requirement of the Municipal Financial Management Act, 2003 (Act 56 of 2003). This includes the
budget policy; funding and reserves policy; credit control and debt collection policy; investment policy;
tariff policy; rate policy; asset management policy; virement policy; budget policy; indigent policy and
supply chain management policy; economic investment and promotion policy; payroll discrepancy
policy; supplier performance monitoring policy; contract management policy and insurance policy.

5. 8. 1 Budget policy

The municipality has a budget policy which aims to achieve the following:

? The principles which the municipality will follow in preparing each medium term revenue and
expenditure framework budget;
? The responsibilities of the executive mayor, the accounting officer, the chief financial officer
and other senior managers in compiling the budget;
? To establish and maintain procedures to ensure adherence to Mbombela Local Municipality
IDP review and budget processes.
5. 8.2 Funding and reserves policy

The municipality has developed a funding and reserves policy that sets out the assumptions and
methodology for estimating the following:

? Projected billings, collections and all direct revenues
? Provision for revenue that will not be collected
? Funds that the municipality can expect from investments
? Proceeds the municipality can expect to receive from the transfer or disposal of assets
? Council ‘s borrowing requirements
? Funds to be set aside in reserves

5. 8.3 Credit control and debt collection policy

The municipality has a credit control and debt collection policy which aims to achieve the following
objectives:

? Provide a framework within which the municipal council can exercise its executive and
legislative authority with regard to credit control and debt collection;
? Ensure that all monies due and payable to the municipality are collected and used to deliver
municipal services in the best interests of the community, residents and ratepayers and in a
financially sustainable manner;
? Outline the procedures that will ensure that the members of the local community is afforded
the opportunity to contribute in the decision-making processes of the municipality and that
they are informed of the decisions and affairs of the municipality;
? Set realistic targets for debt collection;
? Outline credit control and debt collection policy procedures and mechanisms;

176

? Provide a framework to link the municipal budget to indigent support and tariff policies.

5. 8.4 Investment policy

The municipality has an investment policy which aims to achieve the following objectives:

? To ensure Mbombela Local Municipality and its Chief Financial Officer, as trustee of public
funds, exercise their obligation to ensure that cash resources are preserved and safe guarded
against loss;
? To ensure the investments of Mbombela Local Municipality are managed in the most efficient,
effective and economical manner possible;
? To ensure that an appropriate level of investment diversification is implemented to achieve
the above objectives;
? To ensure the liquidity needs of the municipality are appropriately planned and provided for
through the investment process;
? To clearly lay down broad investment parameters to ensure a reasonable return on surplus
cash without incurring an unacceptable risk of capital loss;
? To ensure compliance and transparency in all processes
5. 8.5 Tariff policy

The municipality has a tariff policy which aims to achieve the following objectives:

? The tariffs approved during the budget process by Council fund services must be consistent
with this policy
? The municipal services are financially sustainable, affordable and equitable
? The needs of the poor households are taken into consideration
? There is consistency on how tariffs are applied throughout the municipality
5. 8.6 Rates policy

The municipality has a property rates policy which aims to achive the following objectives:

? Comply with the provision of the Municipal Property Rates Act, specifically Section 3
? Give effect to the principles outlined hereunder
? Ensure the equitable treatment of persons liable for rates
? Determine criteria to be applied for the levying of differential rates for different categories of
properties
? Determine or provide criteria for the determination of categories of properties and categories
of owners of properties
? Determine criteria to be applied for granting exemptions, rebates and reductions
? Determine how the municipality’s powers must be exercised in relation to multi-purposes
properties
? Determine measures to promote local economic and social development, and
? Identifinancial year which categories of properties the municipality has elected not to rate as
provided for in section 7 of the act.

177

5. 8.7 Supply chain management policy

The municipality has a supply chain management policy which aims to provide effective systems for
the following:

? Demand management
? Acquisition management
? Logistics management
? Risk management
? Performance management

The policy gives provision for the establishment of committees that are responsible for evaluation of
competitive bids. The committees are as follows:

? Bid specification committee
? Bid evaluation committee
? Bid adjudication committee

5.9 CONCLUSION

The table below provides a summary of the budget and MTREF divided into seven segments namely;
Financial Performance Budget, Capital Budget, Financial Position Budget, Cashflow Budget,
Cashbacking/Surplus Reconciliation, Asset Management Budget and Free Basic Services.

178

Description 2011/12 2012/13 2013/14
R thousands
Audited
Outcome
Audited
Outcome
Audited
Outcome
Original
Budget
Adjusted
Budget
Full Year
Forecast
Pre-audit
outcome
Budget Year
2015/16
Budget Year
+1 2016/17
Budget Year
+2 2017/18
Financial Performance
Property rates 245,816 274,262 290,608 324,308 334,063 334,063 334,063 374,063 405,315 442,708
Serv ice charges 586,181 635,229 709,239 800,233 803,485 803,485 803,485 903,936 1,033,145 1,187,361
Inv estment rev enue – – – 6,226 6,226 6,226 6,226 9,475 10,611 11,885
Transfers recognised - operational 375,143 382,171 359,287 397,237 395,322 395,322 395,322 574,714 614,100 669,574
Other own rev enue 126,062 215,973 178,536 200,148 207,345 207,345 207,345 295,264 318,654 352,548
Total Revenue (excluding capital transfers
and contributions)
1,333,202 1,507,635 1,537,671 1,728,151 1,746,441 1,746,441 1,746,441 2,157,452 2,381,826 2,664,076
Employ ee costs 389,231 418,218 459,897 483,443 492,574 492,574 492,574 546,092 617,057 682,730
Remuneration of councillors 19,302 20,925 25,892 27,724 27,724 27,724 27,724 29,411 31,176 33,046
Depreciation & asset impairment 291,288 240,802 217,955 234,411 211,098 211,098 211,098 191,056 197,235 203,613
Finance charges 42,703 46,639 52,684 51,682 52,563 52,563 52,563 54,340 52,233 50,195
Materials and bulk purchases 369,832 419,565 437,831 489,230 492,554 492,554 492,554 577,732 651,790 735,838
Transfers and grants – 25,874 23,707 138,363 148,697 148,697 148,697 150,039 152,229 168,884
Other ex penditure 560,428 623,529 629,735 493,600 548,282 548,282 548,282 632,875 667,498 709,995
Total Expenditure 1,672,784 1,795,551 1,847,700 1,918,454 1,973,492 1,973,492 1,973,492 2,181,545 2,369,218 2,584,301
Surplus/(Deficit) (339,582) (287,916) (310,030) (190,302) (227,050) (227,050) (227,050) (24,093) 12,608 79,775
Transfers recognised - capital 89,511 168,277 170,643 511,234 615,304 615,304 615,304 406,592 424,738 453,671
Contributions recognised - capital & contributed assets – – – – – – – – – –
Surplus/(Deficit) after capital transfers &
contributions
(250,071) (119,639) (139,386) 320,932 388,254 388,254 388,254 382,499 437,346 533,446
Share of surplus/ (deficit) of associate – – – – – – – – – –
Surplus/(Deficit) for the year (250,071) (119,639) (139,386) 320,932 388,254 388,254 388,254 382,499 437,346 533,446
Capital expenditure & funds sources
Capital expenditure 194,948 236,732 230,742 522,517 698,262 698,262 698,262 582,416 557,834 622,618
Transfers recognised - capital
90,336 163,788 176,109 418,672 505,691 505,691 505,691 436,592 424,738 453,671
Public contributions & donations 2,886 3,904 4,072 3,150 5,042 5,042 5,042 3,058 3,425 3,836
Borrowing 33,130 28,497 15,044 40,656 108,496 108,496 108,496 35,280 – –
Internally generated funds 68,597 40,544 35,517 60,039 79,033 79,033 79,033 107,486 129,672 165,111
Total sources of capital funds 194,948 236,732 230,742 522,517 698,262 698,262 698,262 582,416 557,834 622,618
Financial position
Total current assets 209,942 189,657 279,661 450,748 277,765 277,765 277,765 416,433 547,243 759,069
Total non current assets 5,556,114 5,487,244 5,505,817 6,255,304 5,636,897 5,636,897 5,636,897 5,894,451 6,196,761 6,547,556
Total current liabilities 556,235 668,456 842,239 268,979 476,152 476,152 476,152 405,105 398,119 430,385
Total non current liabilities 468,813 411,415 485,594 476,309 592,446 592,446 592,446 639,573 642,331 644,182
Community wealth/Equity 4,741,008 4,597,030 4,457,644 5,960,765 4,846,064 4,846,064 4,846,064 5,266,208 5,703,554 6,232,059
Cash flows
Net cash from (used) operating 169,427 237,553 267,046 567,094 574,177 574,177 574,177 673,088 746,050 858,913
Net cash from (used) inv esting (177,919) (236,531) (226,517) (436,529) (608,353) (608,353) (608,353) (578,026) (552,917) (617,111)
Net cash from (used) financing 28,511 (17,256) 36,026 60,322 91,850 91,850 91,850 25,889 (20,560) (23,451)
Cash/cash equivalents at the year end 35,792 19,558 96,112 310,163 153,786 153,786 153,786 274,737 447,311 665,662
Cash backing/surplus reconciliation
Cash and inv estments av ailable 49,425 33,255 110,496 348,900 169,443 169,443 169,443 291,779 465,860 685,853
Application of cash and inv estments 385,297 490,034 652,439 113,557 335,629 335,629 335,629 235,048 267,525 303,177
Balance - surplus (shortfall) (335,872) (456,779) (541,943) 235,343 (166,187) (166,187) (166,187) 56,731 198,336 382,676
Asset management
Asset register summary (WDV) 5,541,848 5,473,075 5,490,998 6,216,567 5,620,819 5,620,819 5,877,001 5,877,001 6,177,815 6,526,356
Depreciation & asset impairment 291,288 240,802 217,955 234,411 211,098 211,098 191,056 191,056 197,235 203,613
Renewal of Ex isting Assets 43,869 73,709 69,523 318,296 370,310 370,310 370,310 345,447 360,155 407,969
Repairs and Maintenance 133,564 153,645 148,020 119,283 172,915 172,915 181,561 181,561 188,872 197,407
Free services
Cost of Free Basic Serv ices prov ided 27,813 50,764 51,779 138,363 138,363 138,363 150,039 150,039 152,229 168,884
Rev enue cost of free serv ices prov ided 120,431 152,994 156,054 432,724 432,724 432,724 489,735 489,735 515,906 543,487
Households below minimum service level
Water: 21 21 21 21 21 21 22 22 22 22
Sanitation/sewerage: – – – – – – – – – –
Energy : 16 16 16 18 18 18 20 20 20 20
Refuse: 114 114 114 117 117 117 120 120 120 120
2015/16 Medium Term Revenue &
Expenditure Framework
Current Year 2014/15

The total budget for 2015/2016 will increase to R2 677 million from a total budget of R2 441 billion in
2014/2015, showing an increase of 13 per cent or R322 million and further increases to R3 207 billion
over the medium-term.

The operating expenditure budget for 2015/2016 will increase to R2 182 billion, showing an increase
of 14 per cent or R264 million from the 2014/2015 budget of R1 918 billion and increases to R2 584
billion over the medium-term.

179

The capital expenditure budget which is 21 per cent of the total budget, will amount to R582 million in
2015/2016, showing an increase of 11 per cent or R59 million from the 2014/2015 budget of R523
million and further increases to R623 million over the medium-term.

The operating revenue budget will increase to R2 157 billion, showing an increase of 25 per cent or
R429 million from the 2014/2015 budget of R1 728 billion and further increases to R2 664 billion over
the medium-term.

The operating revenue from property rates and services charges increase by 14 per cent from R1 125
billion to R1 278 billion in 2015/2016 and further increases to R1 630 billion over the medium-term.

The total grants allocation in 2015/2016 amounts to R981 million, showing an increase of 8 per cent
from the 2014/2015 allocation of R908 million – Operating grants increases by 19 per cent to R472
million and conditional grants decreases to R510 million.

180

CHAPTER 6
PERFORMANCE MONITORI NG AND EVALUATION
_________________________________________________________________________

6.1 INTRODUCTION

Performance Monitoring and evaluation (PM&E) provides decision makers with the ability to draw on
causal linkages between the choice of policy priorities, resourcing, programmes, the services actually
delivered and the ultimate impact on communities. PM&E provides answers to the “so what” question,
thus addressing the accountability concerns of stakeholders and give public sector managers
information on progress toward achieving stated targets and goals. It also provides substantial
evidence as the basis for any necessary corrections in policies, programmes, or projects. Its main aim
is to help improve performance and achieve the desired results, by measuring and assessing
performance in order to more effectively manage the outcomes and associated outputs known as
development results.

Section 19 (1) of the Municipal Structures Act states that a municipal council must strive within its
capacity to achieve the objectives set out in Section 152 of the Constitution. Section 19 (2) of the
same Act stipulates that a municipal council must annually review its overall performance in achieving
the objectives referred to in subsection 19(1). The Performance Management System (PMS) is one of
the mechanisms through which Mbombela aims to improve organisational and individual performance
to enhance service delivery. The performance management framework for Mbombela comprises of
two components, namely:

? Organisational Performance Management and
? Individual Performance Management for Section 57 employees

The Organisational PMS is a tool used to measure the performance of the municipality with regard to
development priorities and objectives outlined in the IDP. Once the municipality starts to implement its
IDP, it is important to monitor that:

? the delivery is happening as planned in the SDBIP;
? the municipality is using its resources most efficiently;
? it is producing the quality of delivery envisaged;

The PMS Framework is currently being reviewed, Mbombela Monitoring and Evaluation Framework
(PMS will be part of the Framework) will be produced to ensure that the following areas are
addressed through monitoring:

? Early warning reports are produced;
? Quarterly analysis reports are produced;
? Municipal Evaluations plan is developed;
? Evaluations are conducted;
? Projects verification is conducted;
? Excelent Awards are awarded to the best performing Department/ section.

181

6.2 LEGISLATIVE FRAMEWORK FOR PERFORMANCE MANAGEMENT

Legislation that governs performance management in local government includes Local Government:
Municipal Systems Act, 2000 (Act 32 of 2000), Local Government: Municipal Planning and
Performance Management Regulations, 2001, Local Government: Municipal Finance Management
Act 53 of 2003 and Local Government: Municipal Performance Regulations for Municipal Managers
and Managers Directly Accountable to Municipal Managers, 2006, Provincial Monitoring and
Evaluation Framework 2009, National Evaluation Policy 2011.

6.2.1 Municipal Systems Act, 2000 ( Act 32 of 2000)

Chapter 6 of the MSA requires all municipalities to promote a culture of performance through the
following:

? Developing a performance management system;
? Setting targets, monitor and review performance based on indicators linked to the IDP;
? Publish an annual report on performance management for the Councilors, staff, the public
and other spheres of government;
? Incorporate and report on a set of general indicators prescribed nationally by the Minister
responsible for Local Government;
? Conduct an internal audit on performance before tabling the report;
? Have the annual performance report audited by the Auditor-General;
? Involve the community in setting indicators and targets and reviewing municipal performance.

6.2.2 Municipal Planning and Performance Management Regulations, 2001
(MPPMR)

The MPPMR, published by the then Department of Provincial and Local Government (DPLG), which
requires a municipality to ensure that its PMS complies with the requirements of the MSA,
demonstrate the operation and management of the PMS; clarifinancial year roles and responsibilities,
as well as ensure alignment with employee performance management and the IDP processes.

6.2.3 Municipal Finance Management Act, 2003 ( Act 56 of 2003)

The MFMA requires a municipality to develop a Service Delivery and Budget Implementation Plan
(SDBIP) based on specific targets and performance indicators derived from the IDP, thus linking the
IDP, the performance management system and the budget. Section 67 of the MSA regards the
monitoring, measuring and evaluating of performance of staff as a platform to develop human
resources and to develop an efficient and effective culture. The MFMA further requires the Mayor to
ensure that the performance agreements of Section 57 employees comply with the requirements of
the MSA to promote sound financial management and are linked to measurable performance
objectives, approved with the budget and included in the Service Delivery and Budget Implementation
Plan (SDBIP).

182

6.2.4 Local Government: Municipal Performance Regulations for Municipal
Managers and Managers Directly Accountable to Municipal Managers, 2006

The then DPLG now Cooperative Governance and Traditional Affairs, in August 2006, promulgated
Regulations for Section 57 Managers on how the performance of municipal managers, should prepare
reports, review, improve and reward performance. The regulations provide for the conclusion of
performance agreements and personal development plans.

6.2.5 Implementation and Reporting on the Organisational Performance
Management System

The PMS is a tool that reflects the level of the implementation of Mbombela IDP and the role played
by individual staff members in the process. It involves the translation of the IDP and sector plans, into
the Service Delivery and Budget Implementation Plan (SDBIP). The SDBIP further translate the IDP
into the municipal or corporate score cards with quarterly targets. The Municipal Manager is the
custodian of the SDBIP Score Cards and agrees with the Executive Mayor, as representative of the
Employer, on the delivery aspects of the scorecard.

6.2.6 Provincial Monitoring and Evaluation Framework

The Provincial M&E Framework is a guiding document to ensure that all public institutions in the
province develop M&E Framework and establish M&E Units that will monitor the performance of the
institution and produce early warning reports.

6.2.7 National Evaluation Policy Framework: November 2011

The Policy Framework seeks to:
? Foreground the importance of Evaluation;
? Provide for an institutionalised system across government linking to planning and budget;
? Provide common language and conceptual base for evaluation in government;
? Indicate clear roles and responsibilities related to evaluations;
? Improve the quality of evaluations;
? Ensure the utilisation of evaluation findings to improve performance.

The purpose underlying is:
? Improving policy programme performance, providing feedback to managers;
? Improving accountability for where public spending is going and the difference it is making;
? Improving decision-making, e.g. on what is working or not working;
? Increasing knowledge about what works and what does not with regards to a public policy, plan,
programme, or project.

6.3 ROLE PLAYERS IN THE MANAGEMENT OF PERFORMANCE MANAGEMENT

The roles players that manage the performance management system of MLM include the following:

183

6.3.1 Internal Audit

The Internal Audit Services plays an internal performance auditing role, which includes monitoring the
functioning of the PMS and compliance to legislative requirements. Its role is also to assist the
municipality in validating the evidence provided by the General Managers in support of their
performance achievements.

6.3.2 Performance Audit Committee

The committee monitors the quality and integrity of the Performance Management System, to ensure
equity and consistency in the application of evaluation norms and standards. The committee further
provides impartial recommendations on performance ratings to the Mayoral Committee, following the
completion of objective appraisals.
6.3.3 Evaluation Panel

The Evaluation Panel evaluates the performance of Section 57 employees, including the Municipal
Manager’s performance, through approval of their final performance ratings.

6.3.4 Executive Mayor and Members of the Mayoral Committee

The Executive Mayor and the Members of the Mayoral Committee manage the development of the
municipal PMS and oversee the performance of the Municipal Manager and the General Managers.

6.3.5 Council and Section 79 Committees

Section 79 Committees play an oversight role and consider reports from Council on the functioning of
different portfolios and the impact on the overall objectives and performance of the municipality.

6.3.6 Community

The community plays a role in the PMS through the annual IDP consultation processes, which are
managed by the Office of the Speaker, working in close collaboration with the IDP and Public
Participation Unit.

6.4 REPORTS

The legislative framework requires that the municipality should develop reports on particular intervals
that must submit to various institutions for validation and monitoring. The table below outlines a
summary of the reports that have been developed in MLM.
Report Type Description
Monthly reports Section 71 of the MFMA requires that reports be prepared. A financial report is prepared based on
municipal programmes and projects.
Quarterly IDP and
SDBIP reporting
The SDBIP is a key management, implementation and monitoring tool, which provides operational
content to the end-of-year service delivery targets, set in the budget and IDP. It determines the
performance agreements for the municipal

184

Report Type Description
Manager, Top Managers and other levels of staff, whose performance can then be monitored
through Section 71 monthly reports, and evaluated through the annual report process.

The SDBIP information on revenue will be monitored and reported monthly by the Municipal
Manager in terms of Section 71(1) (a) and (e). For example, if there is lower than anticipated
revenue and an overall cash shortage in a particular month the municipality may have to revise its
spending downwards to ensure that it does not borrow more than anticipated. More importantly,
such information requires the municipality to take urgent remedial steps to ensure it improves on
its revenue collection capacity if the municipality wants to maintain its levels of service delivery
and expenditure.

Section 1 of the MFMA states that the SDBIPs a detailed plan approved by the Mayor of a
municipality in terms of service delivery should make projections for each month of the revenue to
be collected, by source, as well as the operational and capital expenditure, by vote. The service
delivery targets and performance indicators need to be reported on quarterly (MFMA, 2003).

Mid-year budget and
CGTA report
Section 72 of the MFMA requires the Accounting Officer to prepare and submit a report on the
performance of the municipality during the first half of the financial year. The report must be
submitted to the mayor, National Treasury as well as the relevant Provincial Treasury and CGTA.
As with all other reports this is a crucial report for the Council to consider mid-year performance
and what adjustments should be made, if necessary.

Annual Performance
report (Section 46)
Section 46 of the MSA states that a municipality must prepare for each financial year, a
performance report that reflects the following:
? The performance of the municipality and of each external service provided during that
financial year;
? A comparison of the performances referred to in the above paragraph with targets set
for and performances in the previous financial year; and
? Measures to be taken to improve on the performance.

The performance report must be submitted at the end of the financial year and will be made public
as part of the annual report in terms of Chapter 12 of the MFMA.

The publication thereof will also afford the public the opportunity to judge the performance of the
municipality against the targets set in the various planning instruments.

Annual report Every municipality and every municipal entity under the municipality’s control is
required by Section 121 to prepare an annual report for each financial year, which
must include:
? the annual financial statements of the municipality or municipal entity as
? submitted to the Auditor-General for audit (and, if applicable, consolidated annual
financial statements);
? the Auditor-General’s audit report on the financial statements;
? an assessment by the Accounting Officer of any arrears on municipal taxes
? and service charges;
? particulars of any corrective action taken or to be taken in response to issues raised in
the audit reports;
? any explanations that may be necessary to clarifinancial year issues in connection with
the financial statements;
? any information as determined by the municipality, or, in the case of a

185

Report Type Description
? municipal entity, the entity or its parent municipality;
? any recommendations of the municipality’s audit committee, or, in the case of a
municipal entity, the audit committee of the entity or of its parent municipality;
? an assessment by the Accounting Officer of the municipality’s performance against the
measurable performance objectives for revenue collection and for each vote in the
municipality’s approved budget for the relevant financial year;
? an assessment by the Accounting Officer of the municipality’s performance against any
measurable performance objectives set in terms the service delivery agreement or other
agreement between the entity and its parent municipality;
? the annual performance report prepared by a municipality;
? Any other information as may be prescribed.

Section 127 prescribes the submission and tabling of annual reports. This section also gives
provision for the following:
1. The Accounting Officer of a municipal entity must, within six months after the end of a
financial year, submit the entity’s annual report for that financial year to the Municipal
Manager of its parent municipality;
2. The Mayor of a municipality must, within seven months after the end of a financial year,
table in the municipal council the annual report of the municipality and of any municipal
entity under the municipality’s sole or shared control;
3. If the Mayor, for whatever reason, is unable to table in the council the annual report of
the municipality, or the annual report of any municipal entity under the municipality’s
sole or shared control, within seven months after the end of the financial year to which
the report relates, the mayor must:
a. submit to the Council a written explanation setting out the reasons for
the delay, together with any components of the annual report that are
ready;
b. submit to the Council the outstanding annual report or the outstanding components of
the annual report as soon as may be possible.

Oversight report The Council of a municipality must consider the municipality’s annual report (and
that of any municipal entity under the municipality’s control), and in terms of
Section 129, within two months from the date of tabling of the annual report, must adopt an
oversight report containing the Council’s comments, which must include a statement whether the
Council:
a) has approved the annual report with or without reservations;
b) has rejected the annual report; or
c) has referred the annual report back for revision of those components that can be
revised.

In terms of Section 132, the following documents must be submitted by the
Accounting Officer to the provincial legislature within seven days after the
municipal council has adopted the relevant oversight report:
a) the annual report (or any components thereof) of each municipality and
each municipal entity in the province; and
b) all oversight reports adopted on those annual reports. It is important to note that the
Oversight Committee working with these reports should be chaired by the opposition
party.

186

6.5 CONCLUSION

The performance management system is links both the organisational and individual performance
management to ensure that there is seamless integration with the performance of the municipality and
performance of section 57 Managers.

187

CHAPTER 7
MUNICIPAL PROJECTS
________________________________________________________________________________

7.1 INTRODUCTION

This chapter outlines the capital and operating projects for the 2015/2016 IDP and 2015/2016 –
2017/2018 Budget and Medium-Term Revenue and Expenditure Framework (MTREF).

7.2: FUNDED CAPITAL PROJECTS
7.3: FUNDED OPERATING PROJECTS
7.4 FUNDED PROJECTS FROM SECTOR DEPARTMENTS
7.5: PROJECTS FROM ESKOM
7.6 UNFUNDED PROJECTS

188

7.2 FUNDED CAPITAL PROJECTS

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM001 Water Supply Matsulu Water
Supply
Matsulu 13, 27, 28,39 R10 376 008 % of installation of
new water
reticulation
completed
- R - R
-
MIG
MLM002 Water Supply Provision Of
Nsikazi South Via
Karino Bulk Water
Supply Scheme
Phase 2
Karino 2, 4, 10, 11, 18,
19, 20, 21, 22,
23, 24, 26, 29,
33,34, 35,37,39
R 62 802 936 % of construction of
bulk line, pump
station and
reservoir completed
- R76 999 999 R104 740 000 MIG
MLM003 Water Supply Construction of
Elandshoek Water
Supply
Elandshoek 12 R5 000 000 % of installation of
new water
reticulation
completed
- R - R
-
MIG
MLM004 Water Supply Nsikazi North
water reticulation
scheme
Nsikazi North 1, 3, 5, 6, 7, 8,
9, 34,39
R 1 000 000 Designs completed Designs finalised R19 826 120 R35 167 500 MIG
MLM005 Water Supply Nsikazi South
water reticulation
scheme
Tekwane North
Tekane South,
Msogwaba, Dwaleni,
Kabokweni, Teka
Tako, Emoyeni,
Msogwaba,Zwelishan
a,Newscom
2,18,22;23,26,2
9 32, 33,36
R 1 000 000 Designs completed Designs finalised R 19 826 119 R33 000 000 MIG
MLM006 Water Supply Upgrade of
Hazyview Water
Treatment Works
Hazyview 1 R 500 000 Designs completed Designs finalised R10 545 833 R50 000 000 MIG
MLM007 Water Supply Upgrading of
Hazyview Water
Purification Plant
Hazyview 1 R 15 000 000 % upgrading of
Hazyview water
purification plant
completed
100% upgrading
of Hazyview
water purification
plant completed
R
-
R - Borrowings
MLM008 Water supply Additional 1.5MI
Reservoir for
Phumlani &
associate
infrastructure
Phumlani 14 R 7 500 000 % construction of
additional 1.5MI
Reservoir for
Phumlani
80% construction
of additional
1.5MI Reservoir
for Phumlani
R 2 000 000 R - MIG

189

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM009 Water supply Construction of bulk
water services
Tekwane South 18 R 30 000 000 % construction of
bulk water services
100%
construction of
bulk water
services
R - R - Dept. Human
Settlement
MLM010 Water Supply Refurbishment of
Water Infrastructure
Civil Assets
All wards All wards R 1 500 000 % of refurbishment
project
implemented

100%
construction
R 1 500
000
R - CRR
MLM011 Water Supply Refurbishment of
Water Infrastructure
(Electrical and
Mechanical) Assets
All wards All wards R 1 000 000 % of refurbishment
project
implemented

100%
construction.
R 1 500
000
R 2 000 000 CRR
MLM012 Water Supply Implementation of
Water Conversation
& Demand
Management
Programme
All wards All wards R 2 698 617 Number of
interventions
implemented

Implementation at
100%
R 3 130
378
R 100 000 CRR
MLM013 Water Supply Upgarde of Water
Pipeline Link Phola
to Mshadza
Phola 5 R 800 000 length of pipe
installed/refurbishe
d

100%
construction
complete
R - R - CRR
MLM014 Water Supply Refurbishment of
Phola Water
reticulation Network
Phola 5 R - Its funded in the
2017/18
- R - R 1 000 000 CRR
MLM015 Water Supply Construction of
Jerusalem Water
Package Plant,
storage, pump line
and reticulation
Jerusalem 8 R 2 250 000 % of construction of
package plant and
km of bulk line
installed.

10% Construction
of the pump line
R 3 000
000
R10 000 000 MWIG
MLM016 Water Supply White River/ Sand
River: construction
of sunction pump
line
White River 30 R 1 348 602 % construction of
the pump line

Construction at
100%
R 800
000
R 1 000 000 CRR
MLM017 Water Supply Upgrade of
Additional 1MI
Hillsview Water
reservoir
Hillsview 38 R - Its funded in the
2016/17
- R 1 727
668
R 1 200 000 CRR

190

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM018 Water Supply Installation of
back-up Generators
All wards All wards R 2 295 838 Number of
generators installed

Installation of 4
generators.
R 1 866
168
R - CRR
MLM019 Water Supply Refurbishment Of
Kanyamazane to
Pienaar Bulk Line
(Valves, Damage to
pipe lines,
Chambers, etc,)
Kanyamazane,
Pienaar
2 , 4, 10, 11,18,
19, 20, 21, 22,
23, 24, 26, 29,
33,34, 35,37,39
R 4 000 000 % of refurbishment
project
implemented
(project
implemented in
phases)

100% refurbished
items.
R 3 157
895
R10 267 544 WSOSG
MLM020 Water Supply Installation of
Water SCADA
System
All wards All wards R 600 000 No of stations
installed

Installation of the
identified
stations.
R 600
000
R 2 700 000 CRR
MLM021 Water Supply Drilling of
Boreholes and
associated
infrastructure
All wards All wards R 600 000 Number of
boreholes installed
2 boreholes
installed.
R - R - CRR
MLM022 Water Supply Refurbishment of
Package Plants
(Mshadza, Majika,
Mganduzweni)
Phola, Majika &
Mganduzweni
5, 9, 25 R - Its funded in the
2017/18
- R - R 5 000 000 WSOSG
MLM023 Water Supply Pipe Replacement
Programme and
Storage Capacity
Refurbishment
Mbombela All wards R 500 000 Length of pipeline
replaced

100%
construction.
R 1 000
000
R 1 000 000 CRR
MLM024 Water Supply Procurement of
Laboratory
equipment
Institutional Institutional R 300 000 Number of
instruments
procured

Delivery of
procured items.
R 300
000
R 500 000 CRR
MLM025 Water Supply Procurement of
Plants and
Equipment
Institutional Institutional R 300 000 Number of
equipment and
plant procured

Equipment
delivered

R 400 000 R 2 600 000 CRR
MLM026 Water Supply Procurement of
Fleet
Institutional Institutional R - Its funded in
2016/17
- R 5 000
000
R 3 000 000 CRR

191

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM027 Water Supply SCW 902 - Old
Airport Pumpline &
pump station
Mbombela CBD 14, 15, 16, 17 R 1 234 585 % of bulk water
pipeline upgrade for
Old airport
completed
100% of bulk
water pipeline
upgrade for Old
airport completed
R - R - Service
Contribution
MLM028 Water Supply SCW 1201 Water
Upgrades -
Sonheuwel Upper
Plan
Sonheuwel 15 R - Its funded in the
2016/17
- R 1 800
000
R - Service
Contribution
MLM029 Water Supply SCW1401 - Water:
Bulk & Network
upgrades
Mbombela 15, 16, 17 R - Its funded in the
2017/18
- R - R 2 301 303 Service
Contribution
MLM030 Water Supply SCW 1302 Water:
Network upgrading
Central Zone -
Brander Street)
Mbombela CBD 15,16,17 R - Its funded in the
2016/17
- R 254
735
R - Service
Contribution
MLM031 Water Supply Construction of a
Weir Nsikazi
Regional Raw
Water Pump
Station
Kanyamazane 2, 4, 10, 11,
18, 19, 20, 21,
22, 23, 24, 26,
29, 33, 34, 35,
36, 37 , 39
R 1 500 000 EIA completed,
water licence
approval
application and
detailed design

EIA completed
submitted for
ROD approval.
Detailed designs
submitted.
R 7 500
000
R - WSOSG
MLM032 Water Supply Procurement of 4
Clear Water Pumps
For Nyongane
Nyongane 1, 3, 5, 6, 7, 8,
9, 25, 34, 37,
39
R 4 000 000 Number of pumps
procured

4 pumps
delivered

R - R - WSOSG
MLM033 Water Supply Procurement of 5
Raw Water Pumps
For Sabie River
Pump Station
Nyongane 1, 3, 5, 6, 7, 8,
9, 25, 34, 37,
39
R 4 500 000 Number of pumps
procured

5 pumps
delivered

R - R - WSOSG
MLM034 Water Supply Kanyamazane
mechanical/electric
al refurbishment
(WTW)
Nsikazi 2, 4, 10, 11,
18, 19, 20, 21,
22, 23, 24, 26,
29, 33, 34, 35,
36, 37 , 39
R 3 543 860 % of refurbishment
project
implemented

100%
construction.
R 2 500 000 R 3 000 000 WSOSG
MLM035 Water Supply Upgrade of
Phumlani to White
river bulk water line
Phumlani 14 R 2 800 000 % construction

Construction at
100%
R 3 000 000 R - MWIG

192

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM036 Water Supply Kanyamazane Ext
6 (Mhlume) water
supply
Kanyamazane
(Mhlume)
21 R 9 000 000 % construction

Construction at
100%
R - R - MWIG
MLM037 Water Supply Daantjie tribal
office concrete
reservoir and
refurbishment of
the bulk line
Daantjie 23 R 500 000 % construction

Construction at
100%
R - R - MWIG
MLM038 Water Supply Refurbishment of
Kabokweni Water
Network
Kabokweni 33 R 1 600 000 Length of pipeline
replaced

Construction at
100%
R 5 904
386
R 5 000 000 WSOSG
MLM039 Water Supply Makoko 1.5 ML
Package Plant
Makoko 37 R 2 150 000 % of package plant
completed

40% construction. R 1 200
000
R 2 000 000 MWIG
MLM040 Water Supply Construction of
Bongani 1.5
MLPackage Plant
Bongani 3 R - Its funded in the
2016/17
R 2 150
000
R 3 000 000 MWIG
MLM041 Water Supply Majika Bulk Water
Upgrade and
Refurbishment
Majika 25 R 12 200 000 % of construction
completed

Construction 75% R
-
R -- MWIG
MLM042 Water Supply Water Network
Refurbishment and
Bulk Water Supply
Institutional Institutional R - Its funded in the
2017/18
- R - R17 324 561 MWIG
MLM043 Water Supply Upgrading of bulk
infrastructure and
extention of
reticulation in
Gutshwakop
Gutshwakop 31 R - Its funded in the
2016/17
- R 4 000
000
R - MWIG
MLM044 Water Supply Backdoor,
Mbonisweni,
Phathwa -
Augmentation line
Backdoor,
Mbonizweni, Phathwa
32, 38 R 5 395 613 % of
implementation of
the augmentation
scheme

- R 1 500
000
R - MWIG
MLM045 Water Supply Construction of
new water rising
main bulk supply
line and 2ML
Mahushu 3 R 12 350 000 % of construction
completed

Construction
100%
R 800
000
R - MWIG

193

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
reservoir and
extention of
reticulation in
Mahushu
MLM046 Water Supply Refurbishment of
existing reticulation
in Bhekiswayo
Bhekiswayo 5 R - Its funded in the
2016/17
- R 3 000 000 R - MWIG
MLM047 Water Supply Refurbishment of
reticulation in
Chweni and
Khumbula
Chweni, Khumbula 34 R - Its funded in the
2016/17
- R 4 500
000
R - MWIG
MLM048 Water Supply Upgrading of
infrastructure and
extention of
reticulation in
Malekutu Informal
and refurbishment
of reticulation in
Malekutu, Makoko
and Phameni
Malekutu, Makoko,
Phameni
34, 37 R - Its funded in the
2016/17
- R 3 500
000
R - MWIG
MLM049 Water Supply Refurbishment of
reticulation in Clau-
Clau
Clau-Clau 10 R - Its funded in the
2016/17
- R 3 000
000
R - MWIG
MLM050 Water Supply Refurbishment of
reticulation in
Daantjie
Daantjie 23 R - Its funded in the
2016/17
- R 6 000
000
R - MWIG
MLM051 Sanitation Upgrade of
Matsulu WTW
extension (6MI/d)
Matsulu 13,27, 28,39 R 12 000 000 % of upgrade of
Matsulu WTW
extension
completed
40% of upgrade
of Matsulu WTW
extension
completed
R 14 454
167
R - MWIG
MLM052 Sanitation Tekwane North
outfall sewer
Tekwane North 26 R 4 000 000 % of construction of
Tekwane North
outfall sewer
completed
100% of
construction of
Tekwane North
outfall sewer
completed
R - R - MIG
MLM053 Sanitation Upgrading of
Mbombela /
Mataffin Northern
Mataffin 14 R 4 000 000 % of upgrade of
Nelspruit/Mataffin
100% of upgrade
of
R - R - MIG

194

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
outfall sewer Northern outfall
sewer completed
Nelspruit/Mataffin
Northern outfall
sewer completed
MLM054 Sanitation Refurbishment of
Waste Water
Infrastructure Civil
Assets
All wards All wards R 1 500 000 % of refurbishment
project
implemented

100%
construction
R 1 500
000
R 3 000 000 CRR
MLM055 Sanitation Refurbishment of
Waste Water
Infrastructure
(Electrical and
Mechanical) Assets
All wards All wards R 2 200 000 % of refurbishment
project
implemented

100%
construction.
R 1 000
000
R - CRR
MLM056 Sanitation Construction of a
new Kabokweni
sewer pump
station, outfall
sewer and
associated
infrastructure
Kabokweni 33 R 2 500 000 % construction of a
new Kabokweni
sewer pump
station, outfall
sewer
80% construction
of a new
Kabokweni sewer
pump station,
outfall sewer
R 1 500 000 R - CRR
MLM057 Sanitation Construction of
Hazyview
Vakansiedorp
Sewer Main Outfall
Hazyview 1 R 200 000 length of bulk line
completed

Detailed designs
submitted.
R 2 500
000
R 1 700 000 CRR
MLM058 Sanitation SCS 1013 - Sewer
: Network
Upgrading AC
Mains
Mbombela 14, 15, 16,17 R 600 000 % upgrading of AC
Mains
100% upgrading
of AC Mains
R - R 500 000 Service
Contribution
MLM059 Sanitation SCS 1402 - Sewer
: Network Upgrade
Bulk & Reticulation
Mbombela 14, 15, 16,17 R - Its funded in the
2016/17
- R 369 823 R 534 202 Service
Contribution
MLM060 Sanitation SCS 1011 - Sewer
Network Upgrades
Central (Sonh x 8)
Mbombela 16 R - Its funded in the
2017/18
- R - R 500 000 Service
Contribution
MLM061 Sanitation SCS 910 - Sewer
Extensions to
Existing Networks
Development
Needs
Mbombela 14, 15, 16, 17 R - Its funded in the
2016/17
- R 500 000 R - Service
Contribution

195

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM062 Sanitation SCS 908 Sewer
main outfall
upgrades -
Sonheuwel &
Central (Impala
Str)
Mbombela 17 R 1 223 056 % sewer outfall
upgrades -
Sonheuwel &
Central (Impala
Str)
80% sewer main
outfall upgrades -
Sonheuwel &
Central (Impala
Str)
R 500 000 R - Service
Contribution
MLM063 Sanitation Planning, design
and construction of
Elandshoek
WWTW and Water
borne toilet
Elandshoek 12 R 3 000 000 Planning, design
and % construction
of Elandshoek
WWTW and Water
borne toilet
Complete
planning, design
and 40%
construction of
Elandshoek
WWTW and
Water borne toilet
R 7 000 000 R - MIG
MLM064 Roads and
Stormwater
Upgrading of
Daantjie Cemetery
road
Daantjie 2 R 15 129 659 % of construction of
7.9km road
completed
100% of
construction of
7.9km road
completed
R - R - MIG
MLM065 Roads and
Stormwater
Upgrading of Phola
Collector road
Phola 5 R 7 500 000 % of upgrading of
Phola collector road
completed
100% of
upgrading of
Phola collector
road completed
R - R - MIG
MLM066 Roads and
Stormwater
Construction of
paved roads &
stormwater-Mkheyi
Road
Mkheyi 23 R 6 335 446 % of construction of
1km road
completed
100% of
construction of
1km road
completed
R - R - MIG
MLM067 Roads and
Stormwater
Construction of
paved roads &
stormwater-Sibuyile
Clinic Road
Sibuyile 24 R 3 687 587 % of construction of
1km road
completed
100% of
construction of
1km road
completed
R - R - MIG
MLM068 Roads and
Stormwater
Upgrading of
Kanyamazane
Internal Roads from
gravel to tar
(Robben Island))
Kanyamazane 20 R 9 774 476 % of construction of
1.4km road
completed
100% of
construction of
1.4km road
completed
R - R - MIG

196

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM069 Roads and
Stormwater
Upgrading of
Kanyamazane
Internal Roads from
gravel to tar
(Hercules street)
Kanyamazane 21 R 6 000 000 % of construction of
1.65kmroad
completed
50% of
construction of
1.65kmroad
completed
R 15 000 000 R - MIG
MLM070 Roads and
Stormwater
Upgrading of
Kanyamazane
Internal Roads from
gravel to tar
(Hornet street))
Kanyamazane 19 R 3 000 000 % of construction of
road completed
50% of
construction of
road completed
R 3 000 000 R - MIG
MLM071 Roads and
Stormwater
Construction of
Zomba to Moyeni
bus route
Moyeni 36 R 2 000 000 % of construction of
road completed
50% of
construction of
road completed
R 12 000 000 R - MIG
MLM072 Roads and
Stormwater
Construction of
Tekwane North
Ext1 Bus Route
Tekwane North Ext1 26 R 15 000 000 % of construction of
2.5km road
completed
100% of
construction of
2.5km road
completed
R - R - MIG
MLM073 Roads and
Stormwater
Construction of
paved roads and
stormwater-
Somcuba
Somcuba 29 R 12 595 812 % of construction of
2.4km road
completed
100% of
construction of
2.4km road
completed
R - R - MIG
MLM074 Roads and
Stormwater
Upgrade of
Mataffin Bus route
Mataffin 14 R 1 000 000 Designs completed Designs finalised R - R 10 000 000 MIG
MLM075 Roads and
Stormwater
Plans and Desings
and Upgrade of
Mjejane Access
Road to Tar
Mjejane
(Mdlankomo)
39 R 500 000 Designs completed Designs finalised R 9 000 000 R - MIG
MLM076 Roads and
Stormwater
Construction of
Pedestrian bridges
Zwelisha,
Jerricco,Mafambisa,
Mganduzweni,
Msogwaba,
Matsulu,Gutshwa
4, 9, 10,
22,21,28,27,31
(designs )
R 20 000 000 Number of
pedestrian bridges
constructed
7 pedestrian
bridges
constructed
R 21 000 000 R 30 000 000 MIG

197

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM077 Roads and
Stormwater
Sand Ford Access
Road
Sand Ford 1 R 10 000 000 % of road
construction
completed
30% of road
construction
completed
R 5 000 000 R - MIG
MLM078 Roads and
Stormwater
Upgrade of Elijah
Mango Bus Route
Phase 3
Elijah Mango 11 R 500 000 Designs completed Designs finalised R 14 000
000
R - MIG
MLM079 Roads and
Stormwater
Upgrade of
TV/Nkomeni
Mangozeni
Busroute
Nkomeni Ermelo 11 R 500 000 Designs completed Designs finalised R 12 000 000 R 12 000 000 MIG
MLM080 Roads and
Stormwater
Replacement of
Plant and
Equipment
Institutional Institutional R 1 800 000 Number of LDV’s
and trucks
delivered
Delivery of 2 x 4
ton truck and 3
LDV’s delivered
R 1 770
000
R 2 000 000 CRR
MLM081 Roads and
Stormwater
Replace of Small
Equipment
Institutional Institutional R 200 000 % of funds spent 100% of funds
spent
R 200 000 R 200 000 CRR
MLM082 Roads and
Stormwater
West Acres Storm
Water
Refurbishment
(Phase 2): Design
and Tender
West Acres 15 R 480 000 % of designs and
tender documents
completed
100% of designs
and tender
documents
completed
R - R 600 000 CRR
MLM083 Roads and
Stormwater
West Acres Storm
Water
Refurbishment
(Phase 1):
Construction.
(Tender to be
awarded in current
financial year -
contract will be
done over 2 years)
West Acres 15 R 1 150 000 % construction of
620m pipe lines
completed
100%
construction of
620m pipe lines
completed
R - R - CRR
MLM084 Roads and
Stormwater
Old Pretoria Rd:
Relocate storm
water pipe
West Acres Ext 11 14 R 350 000 Metres (M) of new
900mm pipe across
road Installed
40 Metres new
900mm pipe
across road
Installed
R - R - CRR
MLM085 Roads and
Stormwater
New kerbs in Piet
Retief Street,
Sonpark and Rob
Ferreira Hospital.
Sonheuwel 16 R 400 000 Metres (M) of new
kerbs installed
600 metres of
new kerbs
R - R - CRR

198

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
Dangerous
conditions
installed
MLM086 Roads and
Stormwater
Upgrade of
intersection:
Samora Machel
Dr/Valencia Rd
Valencia Park 14 R 500 000 % of northern
section of
intersection
widened to 4 lanes
100% of funds
spend
R - R - CRR
MLM087 Roads and
Stormwater
Conduct Tom
Lawrence Street
Geotechnical
evaluation
White River 30 R 700 000 % of structural
analysis completed
100 % of
structural
analysis
completed
R - R - CRR
MLM088 Roads and
Stormwater
Conduct
Gedlebane Road
Geotechnical
evaluation
Msogwaba 29 R 700 000 % of structural
analysis completed
100%of structural
analysis
completed
R - R - CRR
MLM089 Roads and
Stormwater
Kaapche Hoop Rd
(Phase 1):
Widening &
Reconstruction
West Acres 15 R 2 384 278 % of construction
completed
Multi Year project
: 70% of
reconstruction of
260m of 5 lane
road
R 3 780 000 R 7 500 000 CRR
MLM090 Roads and
Stormwater
Construction of two
Speed humps per
ward.
All wards All wards R 780 000 Number of speed
humps installed
78 speed humps
installed
R 780 000 R 780 000 CRR
MLM091 Roads and
Stormwater
R40 through
Hazyview:
Reconstruction
Hazyview 1 R - Its funded in the
2016/17
- R 2 500 000 R 8 500 000 CRR
MLM092 Roads and
Stormwater
Msogwaba-
Tekwane Rd:
Construction of 2
culverts in
Msogwaba
(Culverts on site)
Msogwaba 26 R - Its funded in the
2016/17
- R 3 860 000 R - CRR
MLM093 Roads and
Stormwater
Dr Enos Mabuza
Dr (Phase 1):
Widening to 4 lanes
(Madiba to Ferreira)
Mbombela 15,16,17 R 2 000 000 % of completion of
design for 4 lane
road
100% Completion
of planning,
design and
tender
R 1 000 000 R - CRR

199

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
documentation
for doubling of
road
MLM094 Public
Transport
Construction of
Kanyamazane
Public Transport
Facility
Kanyamazane 19, 21 R 3 000 000 % of construction
completed
10% of
construction
completed
R 5 000 000 R 5 000 000 MIG
MLM095 Public
Transport
Construction of
Matsulu Public
Transport Facility
Matsulu 13, 27 R 3 000 000 % of construction
completed
10% of
construction
completed
R 5 000
000
R 5 000 000 PTIS
MLM96 Public
Transport
Construction of
TUT Public
Transport Facilities
Mbombela 15, 16 R 3 000 000 % of construction
completed
10% of
construction
completed
R 5 000
000
R 5 000 000 PTIS
MLM97 Public
Transport
Construction of
Swalala Public
Transport Facilities
Swalala 6 R 4 228 070 % of construction
completed
15% of
construction
completed
R 5 000 000 R 5 000 000 PTIS
MLM98 Public
Transport
Construction of
Kabokweni Public
Transport Facilities
Kabokweni 33 R 4 000 000 % of construction
completed
15% of
construction
completed
R 5 000
000
R 5 000 000 PTIS
MLM99 Public
Transport
Upgrade of R40
Road – Central
Section
Mbombela, White
River
14, 30 R - Its funded in the
2016/17
- R 5 000
000
R 5 000 000 PTIS
MLM100 Public
Transport
Upgrade of
Mbombela CBD
Intersection/Public
Transport Priority
Lanes
Mbombela 14 R 10 000 000 % of road
completed
100% of road
completed
R 10 000
000
R20 000 000 PTIS
MLM101 Public
Transport
Construction of
Riverside Park
Public Transport
Station
Riverside Park 14 R - Its funded in the
2016/17
- R 3 000
000
R 3 000 000 PTIS
MLM102 Public
Transport
Construction of
Bosch Street Public
Transport Station
Mbombela 15, 16 R 3 000 000 % of construction
completed
10% of
construction
completed
R 3 000
000
R 3 000 000 PTIS
MLM103 Public
Transport
Construction of
Rob Ferreira Public
Transport Facility
Mbombela 15, 16 R 3 000 000 % of construction
completed
10% of
construction
completed
R 3 000
000
R 3 000 000 PTIS

200

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM104 Public
Transport
Construction of
Hazyview Public
Transport Facility
Hazyview 1 R - Its funded in the
2017/18
- R 5 000
000
R 4 094 737 PTIS
MLM105 Public
Transport
Purchase of
Integrated
Transport System
(Operating
Systems)
Institutional Institutional R 8 000 000 Integrated transport
system purchased
Integrated
transport system
procured
R 7 000
000
R 6 000 000 PTIS
MLM106 Public
Transport
Upgrading of
existing
R40/Plaston road
intersection
Rocky’s Drift 14, 30 R 5 000 000 % of upgrade of
existing
R40/Plaston road
intersection
completed
20% of upgrade
of existing
R40/Plaston road
intersection
completed
R 6 000
000
R 5 000 000 PTIS
MLM107 Public
Transport
Construction of
Karino Intersection
Priority Routing
Karino 18 R 5 000 000 % of construction of
Karino intersection
completed
20% of
construction of
Karino
intersection
completed
R 5 000
000
R 2 000 000 PTIS
MLM108 Public
Transport
Construction of
Lehawu Public
Transport Facility
Lehawu 4, 26 R 5 000 000 % of construction of
Lehawu public
transport facility
completed
20% of
construction of
Lehawu public
transport facility
completed
R 5 000
000
R 2 000 000 PTIS
MLM1109 Public
Transport
Upgrade of R40 –
HOV Rocky Drift to
White River/ white
river to Swalala
White River 14, 30 R 2 000 000 Designs finalised,
contractor
appointed and site
established
Designs finalised,
contractor
appointed and
site established
R 2 000
000
R 2 000 000 PTIS
MLM110 Public
Transport
Upgrade of R40-
HOV from Nelsriver
to Rocky’s Drift
Mbombela 14, 15 R - Its funded in the
2017/18
- R 2 000
000
R 2 000 000 PTIS
MLM111 Public
Transport
Upgrade of R40
road to Dr. Enos
Mabuza and TUT
Mbombela 14, 15 R 7 500 000 % of upgrade of
road completed
100% of upgrade
of road
completed
R - R - PTIS
MLM112 Public
Transport
Construction of the
Mbombela Public
Transport Facilities
Mbombela 14 R 11 277 193 % of construction
completed
100% of
construction
completed
R - R - PTIS

201

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM113 Electricity
supply
management
Electrification of
500 households in
Phumlani
Phumlani 14 R 4 200 000 Number of
households
connected and
energised
500 households
connected and
energised
R 4 000
000
R - CRR
MLM114 Electricity
supply
management
Electrification of
2890 households
Msholozi 14 R - Its funded in the
2017/18
- R 6 140
351
R13 157 895 INEP
MLM115 Electricity
supply
management
Upgrade of West
Acres 8 and No.2
Substations
Mbombela 14; 15; 16; 17 R 5 280 000 Switchgear and
control panels
installed

Switchgear and
control panels
installed

R - R - Borrowings
MLM116 Electricity
supply
management
Construction of
public lightening
Tekwane South,
Tekwane North,
Kanyamazane,
Matsulu
18;19;20;26;39 R 3 203 399 Streetlights
installed
66 streetlights
and two high
masts installed
R - R - CRR
MLM117 Electricity
supply
management
Upgrade of
Valencia Park
Substation
Valencia 14 R 15 000 000 Switchgear and
control panels
installed

Switchgear and
control panels
installed

R - R - Borrowings
MLM118 Electricity
supply
management
New streetlights on
the R37 and R40
Road
Riverside (R37) and
White River (R40)
14, 30 R 1 055 423 Streetlights
installed
10 streetlights
installed
R - R - CRR
MLM119 Electricity
supply
management
Upgrade of Town
North Substation
White River 30 R - Its funded in the
2017/18
- R - R15 949 495 CRR
MLM120 Electricity
supply
management
Upgrade of
Matsafeni-Ilanga
Substation
Matsafeni & West
Acres
14, 15 R - Its funded in the
2016/17
- R 10 864
045
R - CRR
MLM121 Community
Development
Construction of
Phola Community
hall
Phola 5 R 3 947 403 % of Community
hall completed
100% of
Community hall
completed
R - R - MIG

202

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM122 Community
Development
Construction of
Elandshoek
community hall
Elandshoek 12 R 5 921 105 % of Community
hall completed
100% of
Community hall
completed
R - R - MIG
MLM123 Community
Development
Construction of
Nkomeni Ermelo
community hall
Nkomeni Ermelo 11 R 3 550 000 % of Community
hall completed
100% of
Community hall
completed
R - R - MIG
MLM124 Community
Development
Construction of
Phameni
community hall
Phameni 34 R 5 432 902 % of Community
hall completed
100% of
Community hall
completed
R - R - MIG
MLM125 Community
Development
Construction of
multi-purpose
courts and
upgrading of
stadium
Matsulu Msogwaba
Zwelisha Nsikazi
Salubinza Masoyi
2, 4, 5,6, 37, 28 R 5 000 000 % of Multi-Purpose
Courts
100% of Multi-
purpose court
completed
R 17 446
929
R - MIG
MLM126 Community
Development
Purchase of 18
Seater Bus for
Transport of
Employees
Institutional Institutional R 1 850 000 Number of Seater
Bus for Transport of
Employees
13 Seater Bus for
Transport of
Employees
R 750
000
R - CRR
MLM127 Community
Development
Upgrading of
existing courts and
change rooms
Nelsville; Valencia;
Kamagugu,Matsulu
14, 17, 28, 38 R 500 000 Upgrading of
existing courts and
change rooms
Upgrading of
existing courts
and change
rooms
R 1 500
000
R 1 500 000 CRR
MLM128 Community
Development
Swimming pool
equipment
Institutional Institutional R 250 000 % of swimming
pool equipment
purchased
100% of
swimming pool
equipment
procured
R 500
000
R 500 000 CRR
MLM129 Community
Development
Purchase of
Computer P.O.S.
system for the
swimming pools
Institutional Institutional R 300 000 Point of sale
system for VRP
swimming pool
purchased and
installed

Point of sale
system for VRP
swimming pool
procured and
installed
R 200
000
R 300 000 CRR
MLM130 Community
Development
Purchasing of
Vehicles for Sports
Section
Institutional Institutional R 500 000 Number of bakkies
with canopies
purchased
1 bakkie with
canopy procured
R - R - CRR

203

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM131 Community
Development
Purchasing of
Brushcutters and
Ride-on lawn
mowers for Sports
section
Institutional Institutional R 500 000 Number of lawn
mowers,
brushcutters, push
lawnmowers,
chainsaws, leaf
blowers, pole
pruners and hedge
trimmers
3 ride on lawn
mowers, 9
brushcutters, 4
push
lawnmowers, 1
chainsaw, 3 leaf
blowers, 1 pole
pruner and 1
hedge trimmer

R 500
000
R 1 000 000 CRR
MLM132 Community
Development
Erection of fencing
of Kanyamazane
and Kabokweni
stadiums
Kabokweni,
Kanyamazane
21, 33 R 500 000 Palisade fence and
gate erected
Palisade fence
and gate erected
R 300
000
R - CRR
MLM133 Community
Development
Upgrade of
Mbombela civic
theatre
Institutional Institutional R 150 000 Number of new
theatre seats
purchased and
installed
100 new theatre
seats procured
and installed

R - R - CRR
MLM134 Community
Development
Upgrade of
Mbombela Stadium
Institutional Institutional R 1 542 067 Number of flood
lights upgraded
4 flood Lights
upgraded
R 2 217
359
R 3 255 303 CRR
MLM135 Community
development
Purchase of New
Motorcycles (16)
(Traffic Services)
Institutional Institutional R 1 500 00 Number of
Motorcycles
purchased
16 x Motorcycles
procured
R 800
000
R - CRR
MLM136 Community
development
Purchase of Road
Marking Machine
Institutional Institutional R 500 000 Number of road
marking machines
purchased
1 x Road Marking
Machine
procured
R 625
000
R 1 200 000 CRR
MLM137 Community
development
Purchase of
Unterrupted Power
Supply (UPS) X 10
Institutional Institutional R 300 000 Number of Un-
interrupted Power
Supplies purchased
10 x Un-
interrupted Power
Supply (UPS
procured
R 600
000
R 800 000 CRR
MLM138 Community
development
Purchase of Traffic
Controllers x 5
Institutional Institutional R 300 000 Number of Traffic
Light Controllers
purchased
5 x Traffic Light
Controllers
procured
R 600
000
R 800 000 CRR
MLM139 Community
development
Purchase of Traffic
Services Motor
Vehicles
Institutional Institutional R 1 500 000 Number of Traffic
Services Motor
Vehicles purchased
8 x Traffic
Services Motor
Vehicles
procured
R 1 000
000
R 2 400 000 CRR

204

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM140 Community
development
Purchase of 15
collapsible
structures
Institutional Institutional R 500 000 Number of
collapsible
structures
purchased
15 collapsible
structures
purchased
R 900
000
R - CRR
MLM141 Community
development
Purchase of 15
Guard houses
Institutional Institutional R 500 000 Number of guard
houses purchased
15 guard houses
purchased
R - R - CRR
MLM142 Community
development
Purchasing of
Mbombela Fire
station Backup
generator
Institutional Institutional R 500 000 Number of Backup
Generators
purchased
1 backup
generator
procured
R - R - CRR
MLM143 Community
development
Upgrading of
Mbombela Fire
station
Institutional Institutional R 800 000 % of Mbombela
Fire Station
upgrade completed
100% of
Mbombela Fire
Station upgrade
completed
R 150
000
R - CRR
MLM144 Community
development
Outsource Motor
Vehicle Record
System
Institutional Institutional R 500 000 Motor vehicle filing
system outsourced
Motor vehicle
filing system in
place
R 500
000
R 500 000 CRR
MLM145 Community
development
Purchase of
Furniture Nine
Traditional Council
Offices
Institutional Institutional R 500 000 % of furniture for
Traditional Leaders
purchased
100% of furniture
for Traditional
Leaders procured
R - R - CRR
MLM146 Community
development
Backup Generator
for Mbombela
Testing Station
Institutional Institutional R 500 000 Number of back-up
generators
procured and
installed
1 back-up
generator
procured and
installed
R - R - CRR
MLM147 Community
development
K- 53 Test Track
for Motorcycle -
White river
Institutional Institutional R 500 000 Number of Test
Track K-53 for
motor cycle
constructed
1 Test Track K-53
for motor cycle
constructed
R - R - CRR
MLM148 Community
development
Upgrade of
Licencing Security
Institutional Institutional R 500 000 % of upgrade of
licensing security
system
100% of upgrade
of licensing
security system
R 500
000
R 750 000 CRR
MLM149 Community
development
Construction of
Traffic Technical
Services paint store
and staff kitchen
(Mbombela)
Institutional Institutional R 700 000 % of construction of
Traffic Technical
Services paint store
and staff kitchen
(Mbombela)
completed
100% of
construction of
Traffic Technical
Services paint
store and staff
kitchen
(Mbombela)
R 1 000
000
R 1 000 000 CRR

205

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
completed
MLM150 Community
development
Purchase of
Prolazer III Speed
Measuring Machine
Institutional Institutional R 500 000 Number of Pro-
Lazer IV Speed
Measuring Machine
delivered
4 x Pro-Lazer IV
Speed Measuring
Machine
procured
R 1 800
000
R 2 200 000 CRR
MLM151 Community
development
Establishment and
upgrading of parks
including purchase
of play equipment
Institutional Institutional R 300 000 Establishment and
upgrading of parks
40% complete R 500
000
R 550 000 CRR
MLM152 Community
development
Development of
Nkambeni
Cemetery
Nkambeni 25 R 500 000 % development of
Nkambeni
Cemetery
30%
development of
Nkambeni
Cemetery
R 500
000
R 550 000 CRR
MLM153 Waste and
Environmental
Management
Warehousing,
Parking Space and
Wash-bay for solid
waste management
assets
Mbombela White
River Kabokweni
Hazyview
1; 16; 30 ;33 R - Its funded in
2016/17
- R 2 500
000
R - CRR
MLM154 Waste and
Environmental
Management
Staff Transport Bus Mbombela White
River Kabokweni
Hazyview
1; 16; 30; 33 R800 000 Number of Staff
Transport Bus
One (1) R 615
598
R 1 393 346 CRR
MLM155 Waste and
Environmental
Management
Construction of
Tekwane West
Central Waste
Disposal Site Cell 2
Tekwane West 18 R4 000 352 % construction of
Tekwane West
Central Waste
Disposal Site Cell
40% construction
of Tekwane West
Central Waste
Disposal Site Cell
R 5 000
000
R 7 000 000 CRR
MLM156 Waste and
Environmental
Management
Construction of
Waste Transfer
Stations
White River Nsikazi
Central Matsulu
Hazyview
1, 28, 30, 35 R600 000 Number of ablution
blocks completed
1 ablution block
constructed in
White River
R 5 000
000
R 6 070 578 CRR
MLM157 Waste and
Environmental
Management
Purchase of Waste
Collection Fleet
Institutional Institutional 4 200 000 Number of Waste
Collection Fleet
Three (3) R 3 184
023
R10 000 000 CRR

206

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM158 Waste and
Environmental
Management
Back-up
Generators for
Waste Disposal
Facilities
Institutional Institutional 500 000 Number of Back-up
Generators for
Waste Disposal
Facilities
Three (3) R - R - CRR
MLM159 Waste and
Environmental
Management
Purchase of Waste
Storage Facilities
Institutional Institutional R - Its funded in the
2017/18
- R - R 2 500 000 CRR
MLM160 Economic
Development
Construction of Job
Linkage Scheme
Msogwaba 26 R 6 400 000 Phase one
completed
80% of phase
one construction
completed
R 8 000
000
R15 000 000 CRR
MLM161 Economic
Development
Purchase of Aerial
Photograph
Institutional Institutional R 600 000 Updated aerial
photography of
identified areas
Updated aerial
photography of
identified areas
R - R - CRR
MLM162 Economic
Development
UNS-Upgrade of
Kanyamazane-
Msogwaba-Luphisi
link network
(Phase 1)
Kanyamazane,
Msogwaba, Luphisi
4, 10, 20, 21,
22, 23, 26, 29
R 15 243 860 % of construction
completed
80% of
construction
completed
R 23 785
789
R27 918 754 NDPG
MLM163 Economic
Development
Construction of
Informal Trade
Stalls
Kanyamazane,
Matsulu, Mbombela,
Kabokweni
15,20,27,28,33 R 2 000 000 Number of Street
Trading stalls
completed
13 street trading
stalls completed
in Kabokweni & 8
at Mahushu
R 3 000
000
R 4 382 954 CRR
MLM164 Economic
Development
Provision of Barber
Stalls
Institutional Institutional R 426 201 Number of barber
stall procured and
supplied
25 Barber stalls
procured and
supplied
R 326
038
R 500 000 CRR
MLM165 Integrated
Human
Settlements
Purchase of motor
vehicles (LDV)
Institutional Institutional R 470 000 Number of motor
vehicle (LDV)
purchased
2 motor vehicle
(LDV) procured
R
-
R
-
CRR
MLM166 Rural
Development
Construction of
Piggery House
Msogwaba, Swalala,
Phola, Jerusalem,
Phameni, Manyeveni,
Clau-Clau No 3,
Mataffin.
5,6,8,
11,14,26,34, 37
R 1 500 000 Appoint the
contractor
Contractor
appointed
R 1 917
184
R 2 814 617 Services
Contributions

207

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM167 Rural
Development
Purchase of motor
vehicles (LDV)
Institutional Institutional R 500 000 Number of motor
vehicle (LDV)
purchased
3 motor vehicle
(LDV) purchased
R - R - Services
Contributions
MLM168 Good
governance
and institutional
development
Purchase of
Environmental
Management
Equipment
Institutional Institutional R 500 000 Number of LDVs
purchased
2 LDVs procured R 350
000
R 350 000 CRR
MLM169 Good
governance
and institutional
development
Procurement of
Performance
Tracking ICT
System
Institutional Institutional R 4 228 182 % Implementation
of Tracking ICT
systems
100%
Implementation of
Tracking ICT
systems
R 5 536 426 R 7 722 917 CRR
MLM170 Good
governance
and institutional
development
Procurement of
Motor Vehicles
Institutional Institutional R 1 600 000 Number of Motor
Vehicles
Four (4) R 1 700
000
R 1 800 000 CRR
MLM171 Good
governance
and institutional
development
Ablution and
Change Room
Facilities
Institutional Institutional R 500 000 Number of Ablution
and Change Room
Facilities
Two (2) R - R - CRR
MLM172 Good
governance
and institutional
development
Construction of
Emergency escape
facilities - White
River Civic Centre
Institutional Institutional R 500 000 % construction of
Emergency escape
facilities - White
River Civic Centre
100%
construction of
Emergency
escape facilities -
White River Civic
Centre
R - R - CRR
MLM173 Good
governance
and institutional
development
Purchase of
Equipment for
Medical
examinations
Institutional Institutional R 350 000 Number of medical
equipment
purchased
Three (3) set of
medical
equipment
procured
R 700
000
R 700 000 CRR
MLM174 Good
governance
and institutional
development
New and
upgrading of ICT
Hardware

Institutional Institutional R 5 300 000 % of old servers,
PC, laptops voice
routers, wireless
and switches
upgraded /
replaced
100% of old
servers, PC,
laptops voice
routers, wireless
and switches
,tape drive,
routers, upgraded
/ replaced
R 2 509
180
R 4 132 738 CRR

208

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM175 Good
governance
and institutional
development
New and
upgrading of ICT
software

Institutional Institutional R 400 000 % of new/
upgrading of
electronic software
25% of new/
upgrading of
electronic
software
R 1 200
000
R 1 200 000 CRR
MLM176 Good
governance
and institutional
development
Implementation of
disaster recovery
plan and business
continuity systems
Institutional Institutional R 3 000 000 DRP/BC strategy /
plan and DRP/BC
systems
DRP/BC strategy
/ plan and
DRP/BC systems
R 3 500
000
R 5 000 000 CRR
MLM177 Good
governance
and institutional
development
Upgrade of ablution
facilities
Institutional Institutional R 500 000 % of upgrade of
Mbombela ablution
facility completed
100% of upgrade
of Mbombela
ablution facility
completed
R - R - CRR
MLM178 Good
governance
and institutional
development
Purchase of
Lawnmowers and
Brushcutters
Institutional Institutional R 500 000 Number of Ride on
Lawnmowers
purchased
2 Ride on
Lawnmowers
purchased
R 600
000
R 600 000 CRR
MLM179 Good
governance
and institutional
development
Purchase of Fleet
for Parks
Institutional Institutional R 700 000 Number of Trucks
& LDV's purchased
1 Truck and 1
LDV procured
R 2 000
000
R 800 000 CRR
MLM180 Good
governance
and institutional
development
Purchase of
Cemetery ITC
System
Institutional Institutional R 650 000 Number of
cemetery IT
systems Purchased
and installed
1 Cemetery IT
systems
Purchased and
installed
R 100
000
R 100 000 CRR
MLM181 Good
governance
and institutional
development
Ablution and
Change Room
Facilities
Institutional Institutional R 500 000 % of construction of
Hazyview ablution
facility completed
100% of
construction of
Hazyview
ablution facility
completed
R - R - CRR
MLM182 Financial
Management
Renovation of
Mbombela and
White River
Municipal stores
Institutional Institutional R 1 500 000 Municipal stores
renovated
Municipal stores
renovated
R 1 800
000
R 2 000 000 CRR

209

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
KPI TARGET 2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MLM183 Financial
Management
Purchase of Mobile
Fuelling Tankers
Institutional Institutional R 1 000 000 Mobile refuelling
tankers purchased
Mobile refuelling
tankers procured
R - R - CRR
MLM184 Financial
Management
Purchase of asset
tracking and
scanning system.
Institutional Institutional R 700 000 Assets tracking and
scanning system
purchased
Assets tracking
and scanning
system procured
R - R 1 818 549 CRR
MLM185 Financial
Management
Purchase of
Standard Chart of
Accounts
Complaint System
Institutional Institutional R 1 359 987 Standard Chart of
Accounts
Complaint System
purchased
Standard Chart of
Accounts
Complaint
System procured
R 3 000
000
R 3 000 000 CRR
MLM186 Revenue
enhancement
Property Valuation
Management
System
Institutional Institutional R 600 000 Property Valuation
Management
System procured
and licensed.
Operational
property valuation
management
system
R 660
000
R 726 000 CRR
MLM187 Revenue
enhancement
AMR meters-
Commercial
Mbombela; White
River & Hazyview
1; 14; 15; 16;
17; 30; 38
R 3 084 134 Number of meters
installed
380 meters
installed
R - R - CRR
MLM188 Revenue
enhancement
AMR meters-
Residential
Mbombela; White
River & Hazyview
1; 14; 15; 16;
17; 30; 38
R - Its funded in
2016/17
- R 3 234
718
R 5 510 606 CRR

210

7.3: FUNDED OPERATING PROJECTS

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB001 Water Supply &
Sanitation
Calibration of
equipment
Institutional Institutional R 100 000 R 1 300 000 R 1 300 000 CRR
MB002 Water Supply &
Sanitation
Ground Water Protocol, Institutional Institutional R 600 000 R - R - CRR
MB003 Water Supply &
Sanitation
Development of WSDP Institutional Institutional R 500 000 R 500 000 R 500 000 CRR
MB004 Water Supply &
Sanitation
Review of By-Laws Institutional Institutional R 400 000 R - R - CRR
MB005 Water Supply &
Sanitation
Section 78 Assessment Institutional Institutional R 1 000 000 R 500 000 R - CRR
MB006 Water Supply &
Sanitation
Review of Service
Level Agreements
Institutional Institutional R - R - R 200 000 CRR
MB007 Water Supply &
Sanitation
Review and
Development Of
Operations and
Maintenance Manuals,
Operational Procedures
and Plans and Asset
Management
Institutional Institutional R 500 000 R 550 000 R 300 000 CRR
MB008 Water Supply Water tretament works
audits and review of
safety plans
Institutional Institutional R 1 107 408 R 1 457 663 R 1 715 706 CRR
MB009 Water Supply Bureau services (water) Institutional Institutional R 400 000 R 500 000 R 500 000 CRR
MB010 Waste and
Environmental
Management
Integrated Waste
Management Plan
Institutional Institutional R 700 000 R - R - CRR

211

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB011 Waste and
Environmental
Management
Integrated Waste
Management
Programme
Hazyview,
Mbombela,
White River,
Kabokweni
1,16, 30, 33 R 300 000 R 387 983 R - NDPG
MB012 Waste and
Environmental
Management
Solid Waste
Management Business
Plans
Institutional Institutional R 500 000 R - R - CRR
MB013 Waste and
Environmental
Management
Waste Separation at
Source
Hazyview,
Mbombela,
White River,
Kabokweni
1,16, 30, 33 R 1 273 026 R 1 527 631 R 750 000 CRR
MB014 Sanitation Development of
Sanitation Master plan
Institutional Institutional R 1 708 938 R 1 514 534 R 2 000 000 CRR
MB015 Sanitation Waste water tretament
works audits and
review of risk
abatement plans
Institutional Institutional R 1 000 000 R 1 300 000 R 1 528 124 CRR
MB016 Sanitation Bureau services
(sanitation)
Institutional Institutional R 400 000 R 500 000 R 500 000 CRR
MB017 Rural
Development
Development of the
Rural Development
Strategy
Institutional Institutional R 500 000 R 530 000 R 561 000 CRR
MB018 Rural
Development
Rural Cooperative
Development and
Training
Instituitional nstituitional R 210 000 R 220 500 R 551 250 CRR
MB019 Rural
Development
Purchase equipment
for Rural Cooperatives
Instituitional Instituitional R 544 289 R 571 503 R - CRR
MB020 Roads and
Stormwater
Continues upgrading
of Roads Master Plan
Institutional Institutional R 1 000 000 R 800 000 R 800 000 CRR

212

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB021 Roads and
Stormwater
Determination of 1:100
Year Flood Lines in
Mbombela
Institutional Institutional R 700 000 R 700 000 R 700 000 CRR
MB022 Roads and
Stormwater
Compilation of As-built
Stormwater Plans in
Mbombela
Institutional Institutional R 1 500 000 R 700 000 R 700 000 CRR
MB023 Roads and
Stormwater
Resealing of roads Institutional Institutional R 11 879 062 R 14 720 618 R 16 813 190 CRR
MB024 Revenue
Management
Revenue Loss Systems
Audit
Institutional Institutional R 1 700 000 R 1 819 000 R 2 000 000 CRR
MB025 Revenue
Management
Revenue Enhancement
Customer Awareness
and Education
Institutional Institutional R 500 000 R 600 000 R 625 000 CRR
MB026 Revenue
Management
Municipal e-Account
Distribution System
Institutional Institutional R 600 000 R 650 000 R 650 000 CRR
MB027 Revenue
Enhancement
Meter Audit -
Residential,
Commercial, Industrial
Mbombela,
White River &
Hazyview
1;14;15;
16;17;30;38
R 2 500 000 R - R 3 000 000 CRR
MB028 Revenue
Enhancement
Management of
Technical Losses
Mbombela,
White River &
Hazyview
1;14;15;
16;17;30;38
R 800 000 R - R 1 000 000 CRR
MB029 Revenue
Enhancement
Power factor control in
Major Substations
Institutional Institutional R 1 111 547 R 6 748 771 R 3 099 108 CRR
MB030 Revenue
Enhancement
Meter replacement
program
Institutional Institutional R 5 000 000 R 5 000 000 R 6 000 000 CRR
MB031 Revenue
Enhancement
Awareness campaign
on water conservation
Institutional Institutional R 1 411 547 R 1 748 771 R 1 099 108 CRR
MB032 Revenue
Enhancement
Waste Service Audit Institutional Institutional R 300 000 R - R - CRR
MB033 Revenue Supplementary Institutional Institutional R 600 000 R 660 000 R 726 000 CRR

213

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
Enhancement valuations
MB034 Revenue
Enhancement
Valuation Appeals
Hearings
Institutional Institutional R 150 000 R 100 000 R 50 000 CRR
MB035 Revenue
Enhancement
Verification of municipal
properties portfolio
Institutional Institutional R 500 000 R 600 000 R 650 000 CRR
MB036 Revenue
Enhancement
Transfer of formalised
municipal properties
Institutional Institutional R 3 500 000 R 3 710 000 R 4 500 000 CRR
MB037 Revenue
Enhancement
Renovation of
Municipal Houses
Institutional Institutional R 478 043 R 500 000 R 550 000 CRR
MB038 Public Transport Public Transport
Programme
Management
Institutional Institutional R 10 222 807 R 7 344 737 R 10 694 079 CRR
MB039 Public Transport Lease of Buses - Pilot
Projects
Institutional Institutional R 15 000 000 R 18 750 000 R 23 437 500 CRR
MB040 Integrated
human
settlements
Development of
strategy that deals with
land invasion
prevention
Instituitional Instituitional R 420 000 R 440 706 R 1 433 250 CRR
MB041 Integrated
human
settlements
Collection of data on
informal settlements
Instituitional Instituitional R 525 000 R 551 250 R 1 102 500 CRR
MB042 Integrated
human
settlements
Provide Land Tenure
for all properties in
Mbombela
Instituitional Instituitional R 3 100 000 R 3 286 000 R 3 483 160 CRR
MB043 Integrated human
settlements
New Townships Kwa-
Khumalo, Matsafeni,
Nkosi City, Mdluli,
Kgarudi, Mbuyane,
Msogwaba, township
establishments
Instituitional Instituitional R 1 365 000 R 1 433 250 R 2 000 000 CRR

214

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB044 Integrated human
settlements
Blinkwater,
Friedenheim, Hillsview
(Portions 0, 2, 4 & 5 of
the Farm Waterval,
Hillsview 65 JU) and
White River x 71
Instituitional Instituitional R 1 050 000 R 1 102 500 R 3 000 000 CRR
MB045 Integrated human
settlements
Implementation of
SPLUMA
Instituitional Instituitional R 524 950 R 550 830 R 1 000 000 CRR
MB046 Integrated
human
settlements
Installation of solar-
water gysers in
Matsulu,
Kanyamazane,
Kabokweni, Tekwane
South, Entokozweni,
Tekwane North and
Tshabalala
Matsulu,
Kanyamazane,
Kabokweni,
Tekwane
South,
Entokozweni,
Tekwane
North and
Tshabalala
13, 27, 28,
18, 19, 20,
31, 32, 19,
26 & 01
R 500 000 R 530 000 R 561 800 CRR
MB047 Good
Governance and
Institutional
Development
Project Planning
Consultants
Institutional Institutional R 13 081 754 R 13 636 798 R 14 468 816 CRR
MB048 Good
Governance and
Institutional
Development
Review of
Environmental
Management
Framework
Institutional Institutional R 700 000 R 100 000 R 150 000 CRR
MB049 Good
Governance and
Institutional
Development
Hosting of the
Mbombela
Environmental
Management Forum
Institutional Institutional R 60 000 R 60 000 R 60 000 CRR
MB050 Good
Governance and
Institutional
Development
Environmental impact
Assessment review and
processing
Institutional Institutional R 500 000 R 600 000 R 650 000 CRR

215

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB051 Good
Governance and
Institutional
Development
Development of AIR
Quality management
plan
Institutional Institutional R - R 500 000 R 600 000 CRR
MB052 Good
Governance and
Institutional
Development
Environmental
Awareness and
Education Strategy
Implementation
Institutional Institutional R 200 000 R 320 000 R 340 000 CRR
MB053 Good
Governance and
Institutional
Development
Celebration of National
Environmental
Management
programmes
Institutional Institutional R 225 000 R 240 000 R 260 000 CRR
MB054 Good
Governance and
Institutional
Development
Clearing and
Management of illegal
dumping spots
Institutional Institutional R 1 200 000 R 1 200 000 R 1 300 000 CRR
MB055 Good
Governance and
Institutional
Development
Design and supply of
environmental
Educational Material
Institutional Institutional R 50 000 R 120 000 R - CRR
MB056 Good
Governance and
Institutional
Development
Climate change in
relation to Durban
Adaptation Charter for
local government
Institutional Institutional R 132 000 R 100 000 R 120 000 CRR
MB057 Good
Governance and
Institutional
Development
Awareness and
education on
Renewable and Energy
Efficiency programmes
Institutional Institutional R 100 000 R 55 000 R 30 000 CRR
MB058 Good
Governance and
Institutional
Development
Stipends of EPWP
participants
Institutional Institutional R 4 703 101 R - R - CRR
MB059 Good
Governance and
Institutional
Stipends of EPWP
participants
Institutional Institutional R 5 000 000 R - R - CRR

216

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
Development
MB060 Good
Governance and
Institutional
Development
Training of 600 EPWP
beneficiaries
Institutional Institutional R 500 000 R - R - CRR
MB061 Good
Governance and
Institutional
Development
Workshop on the rollout
of EPWP Phase 3
Institutional Institutional R 350 000 R - R - CRR
MB062 Good
Governance and
Institutional
Development
Transportation of
EPWP Participants
Institutional Institutional R 215 899 R - R - CRR
MB063 Good
Governance and
Institutional
Development
Procurement of
Personal Protective
Clothing for the EPWP
Beneficiaries
Institutional Institutional R 800 000 R - R - CRR
MB064 Good
Governance and
Institutional
Development
Coordination and
participation in EPWP
programmes
Institutional Institutional R 70 000 R - R - CRR
MB065 Good
Governance and
Institutional
Development
Mbombela EPWP
Summit coordination
Institutional Institutional R 300 000 R - R - CRR
MB066 Good
Governance and
Institutional
Development
Induction and
orientation programme
to all appointed
participants
Institutional Institutional R 60 000 R - R - CRR
MB067 Good
Governance and
Institutional
Development
Establishment of Self-
Insurance Reserve
Fund
Institutional Institutional R 2 116 775 R 3 182 155 R 3 072 895 CRR

217

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB068 Good
Governance and
Institutional
Development
Annual review of the
Enterprise Risk
Management
Framework (ERM)
Institutional Institutional R 25 000 R 30 000 R 35 000 CRR
MB069 Good
Governance and
Institutional
Development
Monitoring and
evaluation of the risk
mitigation process by
means of the Risk
Management
Committee
Institutional Institutional R 25 000 R 30 000 R 35 000 CRR
MB070 Good
Governance and
Institutional
Development
Barn Owl System
upgrade
Institutional Institutional R 75 000 R 85 000 R 95 000 CRR
MB071 Good
Governance and
Institutional
Development
Annual Risk
Assessment
Institutional Institutional R 55 000 R 70 000 R 80 000 CRR
MB072 Good
Governance and
Institutional
Development
Training members of
Risk Management
Committee and Senior
Management
Committee, Managers
and Supervisors
Institutional Institutional R 75 000 R 45 000 R 50 000 CRR
MB073 Good
Governance and
Institutional
Development
Insurance Portfolio data
cleansing
Institutional Institutional R 10 000 R 20 000 R 30 000 CRR
MB074 Good
Governance and
Institutional
Development
Review of the
Insurance Port Folio
Institutional Institutional R 500 000 R 100 000 R - CRR
MB075 Good
Governance and
Insurance Awareness
phases 2-4
Institutional Institutional R 15 000 R 15 000 R 20 000 CRR

218

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
Institutional
Development
MB076 Good
Governance and
Institutional
Development
One anti-corruption and
fraud prevention
workshop for
councillors and officials
per annum.
Institutional Institutional R 40 000 R 45 000 R 45 000 CRR
MB077 Good
Governance and
Institutional
Development
Institutional Institutional CRR
MB078 Good
Governance and
Institutional
Development
Institutional Institutional CRR
MB079 Good
Governance and
Institutional
Development
Institutional Institutional CRR
MB080 Good
Governance and
Institutional
Development
Institutional Institutional CRR
MB081 Good
Governance and
Institutional
Development
Institutional Institutional CRR
MB082 Good
Governance and
Institutional
Development
Institutional Institutional CRR
MB083 Good
Governance and
Institutional
Development
Institutional Institutional CRR

219

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB084 Good
Governance and
Institutional
Development
Council Closing
Ceremony
Institutional Institutional R 450 000 R 477 000 R 505 620 EPWP Grant
MB085 Good
Governance and
Institutional
Development
Institutional Institutional CRR
MB086 Good
Governance and
Institutional
Development
Institutional Institutional CRR
MB087 Good
Governance and
Institutional
Development
Printing of annual
reports
Institutional Institutional R 318 000 R 337 080 R 357 305 CRR
MB088 Good
Governance and
Institutional
Development
Establishment of
Umsebe Accord Office
Institutional Institutional R 2 000 000 R 2 125 666 R 2 259 229 CRR
MB089 Good
Governance and
Institutional
Development
Hosting of 2015
Umsebe Accord Event
Institutional Institutional R 1 500 000 R - R - CRR
MB090 Good
Governance and
Institutional
Development
IDP Budget
consultative meetings
Institutional Institutional R 800 000 R 848 000 R 898 880 CRR
MB091 Good
Governance and
Institutional
Development
Business process
review and procedure
manual
Institutional Institutional R 700 000 R 742 000 R 786 520 CRR
MB092 Good
Governance and
Institutional
Citizen satisfaction
survey
Institutional Institutional R 450 000 R 477 000 R 505 620 CRR

220

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
Development
MB093 Good
Governance and
Institutional
Development
Development of
research framework
and research agenda
Institutional Institutional R 300 000 R 318 000 R 337 080 CRR
MB094 Good
Governance and
Institutional
Development
Coordination of cluster
and Mayoral
Coordinating Forum
Institutional Institutional R 212 000 R 224 720 R 238 203 CRR
MB095 Good
Governance and
Institutional
Development
Youth development Institutional Institutional R 300 000 R 318 000 R 337 080 CRR
MB096 Good
Governance and
Institutional
Development
Women empowerment Institutional Institutional R 300 000 R 350 000 R 400 000 CRR
MB097 Good
Governance and
Institutional
Development
Children development Institutional Institutional R 200 000 R 250 000 R 300 000 CRR
MB098 Good
Governance and
Institutional
Development
Disability programme Institutional Institutional R 300 000 R 350 000 R 400 000 CRR
MB099 Good
Governance and
Institutional
Development
Elderly programme Institutional Institutional R 300 000 R 350 000 R 400 000 CRR
MB0100 Good
Governance and
Institutional
Development
Disaster relief and food
security
Institutional Institutional R 500 000 R 600 000 R 700 000 CRR

221

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB101 Good
Governance and
Institutional
Development
Publications Institutional Institutional R 200 000 R 250 000 R 300 000 CRR
MB102 Good
Governance and
Institutional
Development
Corporate
Communication
strategy
Institutional Institutional R 400 000 R 450 000 R 500 000 CRR
MB103 Good
Governance and
Institutional
Development
Coordination of new
twinning agreements
Institutional Institutional R 300 000 R 450 000 R 500 000 CRR
MB104 Good
Governance and
Institutional
Development
Implementation of HIV
& AIDS programme
Institutional Institutional R 530 000 R 561 800 R 595 508 CRR
MB105 Good
Governance and
Institutional
Development
Mayoral Outreach Institutional Institutional R 530 000 R 561 800 R 595 508 CRR
MB106 Good
Governance and
Institutional
Development
Mayoral Excellence
Awards
Institutional Institutional R 400 000 R 450 000 R 500 000 CRR
MB107 Good
Governance and
Institutional
Development
Operationalisation of
Special Purpose
Project Unit
Institutional Institutional R 4 639 232 R 4 888 420 R 5 251 208 CRR
MB108 Good
Governance and
Institutional
Development
Development of Vision
2030
Institutional Institutional R 2 000 000 R 2 100 000 R 2 200 000 CRR
MB109 Good governance Refurbishment of
Mbombela Civic Centre
HVAC plant
Instituitional Instituitional R - R 1 500 000 R 1 500 000 CRR

222

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB110 Good governance Refurbishment of Civic
Centres
Instituitional Instituitional R - R 1 000 000 R 670 000 CRR
MB111 Good governance Renovation and tiling
of offices in white-river
Instituitional Instituitional R 400 000 R - R - CRR
MB112 Good governance Human Resources
Workflow System
Phase 3
Instituitional Instituitional R 750 000 R 750 000 R 750 000 CRR
MB113 Good governance Performance
Management
Cascading
Instituitional Instituitional R - R 700 000 R 800 000 CRR
MB114 Good governance Entry level
Management
Supervisory training
Instituitional Instituitional R - R 2 000 000 R 2 000 000 CRR
MB115 Good governance Employment Equity
Analysis
Instituitional Instituitional R 700 000 R 700 000 R 700 000 CRR
MB116 Good governance Qualifications Audit Instituitional Instituitional R 250 000 R 250 000 R 250 000 CRR
MB117 Good governance Recognition of prior
learning
Instituitional Instituitional R 250 000 R 250 000 R 250 000 CRR
MB118 Good governance Medical Surveillances Instituitional Instituitional R 800 000 R 800 000 R 800 000 CRR
MB119 Good governance Occupational Health
and Safety Training
Instituitional Instituitional R 700 000 R 700 000 R 700 000 CRR
MB120 Good governance Occupational Health
and Safety Audit
Instituitional Instituitional R 700 000 R 700 000 R 700 000 CRR
MB121 Good governance OHS Audit Instituitional Instituitional R 350 000 R 350 000 R 350 000 CRR
MB122 Good governance Learneship
Programmes
Instituitional Instituitional R 700 000 R 700 000 R 700 000 CRR
MB123 Good governance Skills Audit and update
of Workplace Skills
Plan (WSP)
Instituitional Instituitional R 1 400 000 R 1 400 000 R 1 400 000 CRR
MB124 Good governance Occupational Health
and Safety awareness
Instituitional Instituitional R 140 000 R 140 000 R 140 000 CRR

223

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
programmes
MB125 Good governance Employee Wellbeing
Programme
Instituitional Instituitional R 800 000 R 900 000 R 900 000 CRR
MB126 Good governance Appointment of service
provider to conduct
office space survey
Instituitional Instituitional R 1 200 000 R - R - CRR
MB127 Good governance Appointment of service
provider to compile
facilities maintenance
master plan
Instituitional Instituitional R 1 200 000 R - R - CRR
MB128 Good governance Acquiring of office
space for Technical
Services
Instituitional Instituitional R 1 000 000 R 1 000 000 R 1 000 000 CRR
MB129 Good governance Renovation for office
space
Instituitional Instituitional R 1 000 000 R - R - CRR
MB130 Good governance Lease of Office
Automation Equipment
Instituitional Instituitional R 2 000 000 R 2 200 000 R 2 500 000 CRR
MB131 Financial
Management
Quality review of
annual financial
statements
Institutional Institutional R 60 500 R 66 550 R - CRR
MB132 Financial
Management
Update of Immovable
asset register
Institutional Institutional R 4 140 000 R 5 038 000 R 1 328 400 CRR
MB133 Financial
Management
Annual Credit Rating Institutional Institutional R 180 000 R 184 000 R 190 000 CRR
MB134 Financial
Management
Review of provision for
rehabilitation of landfill
sites
Institutional Institutional R 160 000 R 180 000 R 200 000 CRR
MB135 Financial
Management
Actuarial valuation of
defined benefit plans.
Institutional Institutional R 380 000 R 400 000 R 410 000 CRR
MB136 Financial
Management
Implementation of AFS
system
Institutional Institutional R 780 000 R 450 000 R - CRR

224

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB137 Financial
Management
Maintenance of Intenda
procurement suite
Institutional Institutional R 720 000 R 360 000 R - CRR
MB138 Financial
Management
Supplier database
vetting
Institutional Institutional R 200 000 R 200 000 R 200 000 CRR
MB139 Financial
Management
Implementation of
Standard Chart of
Account Processes
Institutional Institutional R 1 850 000 R 1 979 500 R 2 177 450 CRR
MB140 Financial
Management
Implementation of Cost
and Management
Accounting Processes
Institutional Institutional R 3 918 000 R 4 192 260 R 4 443 796 CRR
MB141 Financial
Management
Implementation of
Budget and Reporting
Processes
Institutional Institutional R 200 000 R 220 000 R 242 000 CRR
MB142 Financial
Management
Operationalisation of
Fleet and Fuel
Management System
Institutional Institutional R 2 686 080 R 2 874 106 R 3 075 293 CRR
MB143 Electricity Supply
Management
Electrical Services
Planning Capacity
Complement
Institutional Institutional R 1 822 607 R 1 941 077 R 2 000 000 CRR
MB144 Electricity Supply
Management
Maintenance and
Refurbishment Plan
Mbombela,
White River &
Hazyview
1;14;15;
16;17;30;38
R 1 853 271 R 600 000 R 700 000 CRR
MB145 Electricity Supply
Management
Public Lighting
Masterplan
Institutional Institutional R - R 665 000 R - CRR
MB146 Electricity Supply
Management
Electrification
Masterplan
Institutional Institutional R - R 665 000 R - CRR
MB147 Electricity Supply
Management
Maintenance and
Refurbishment Plan
Mbombela,
White River &
Hazyview
1;14;15;
16;17;30;38
R 1 629 442 R 600 000 R 1 822 240 CRR
MB148 Electricity supply
management
Feasibility Study for
Renewable Energy
Instituitional Instituitional R 2 000 000 R - R - CRR

225

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB149 Economic
Development
Precinct plans
development
Mpumalanga
University,
White River,
Hazyview,Roc
ky`s drift,

1,14,15,16,3
0
R 1 500 000 R 1 590 000 R 1 685 400 CRR
MB150 Economic
Development
Planning for Urban
Network Hub
Tekwane
South
18 R 2 300 000 R 2 530 000 R 2 783 000 CRR
MB151 Economic
Development
Urban design
Frameworks for
strategic intervention
areas identified in the
SDF
Institutional Institutional R 1 000 000 R 1 060 000 R 1 123 600 CRR
MB152 Economic
Development
Urban design
Frameworks for the
Intensification Zones
identified in the SDF
Institutional Institutional R 1 300 000 R 1 378 000 R 1 460 680 CRR
MB153 Economic
Development
Alignment of the SDF
with SPLUMA
Institutional Institutional R 700 000 R 650 000 R 551 250 CRR
MB154 Economic
Development
Re-establishment of the
Mbombela
Development Agency
(MDA)
Institutional Institutional R 500 000 R 530 000 R 561 800 CRR
MB155 Economic
Development
Mbombela Economic
Development
Partnership
Institutional Institutional R 500 000 R 530 000 R 561 800 CRR
MB156 Economic
Development
SMME Support Institutional Institutional R 700 000 R 742 000 R 786 520 CRR
MB157 Economic
Development
Implementation of the
LED Strategy projects
Institutional Institutional R 300 000 R 318 000 R 337 080 CRR
MB158 Economic
Development
Support for youth and
women related project
Institutional Institutional R 500 000 R 530 000 R 561 000 CRR

226

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB159 Economic
Development
Establishment of
chamber dealing with
businesses for the
disabled
Institutional Institutional R 157 500 R 165 375 R 385 875 CRR
MB160 Economic
Development
Implementation of the
Township Tourism
Route
Institutional Institutional R 300 000 R 318 000 R 337 080 CRR
MB161 Economic
Development
Aquaculture
Development and
Enhancement
Programme (ADEP)
Institutional Institutional R 157 500 R 165 975 R 551 250 CRR
MB162 Economic
Development
Destination marketing
and exhibitions
Institutional Institutional R 400 000 R 424 000 R 4 494 404 CRR
MB163 Economic
Development
Brand Mbombela
campaign activation
Institutional Institutional R 400 000 R 424 000 R 4 494 404 CRR
MB164 Economic
Development
Support for City
Improvement Districts
(CID's)
Institutional Institutional R 472 500 R 496 125 R 1 653 750 CRR
MB165 Economic
Development
Implementation of
Umsebe agreements
Institutional Institutional R 525 000 R 551 250 R 551 250 CRR
MB166 Economic
Development
Tourism month
celebrations
Institutional Institutional R 315 000 R 330 750 R 165 975 CRR
MB167 Economic
Development
Mbombela Tourism
Explosion
Institutional Institutional R 1 000 000 R 1 060 000 R 1 123 600 CRR
MB168 Economic
Development
Informal Trade
Management
Programme
Institutional Institutional R 500 000 R 530 000 R 561 000 CRR
MB169 Economic
Development
Strategic LED
partnerships (review
Sunderland and other
new partnerships)
Institutional Institutional R 157 500 R 165 975 R 220 500 CRR
MB170 Economic
Development
Support for the Hosting
of Major Events
Institutional Institutional R 325 000 R 344 500 R 365 170 CRR

227

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB171 Economic
Development
Support for Tyres
SMME Programme
Institutional Institutional R 210 000 R 220 500 R 551 250 CRR
MB172 Economic
Development
Support for CWP
Programme
Institutional Institutional R 315 000 R 33 750 R 716 625 CRR
MB173 Economic
Development
Tourism capacity
building and skills
development
(Mbombela Tourism
Associations)
Institutional Institutional R 262 500 R 275 625 R 165 375 CRR
MB174 Economic
Development
Informal Trade
Upliftment Programme
Institutional Institutional R 500 000 R 530 000 R 561 000 CRR
MB175 Economic
Development
Special Economic Zone
(SEZ)
Institutional Institutional R 400 000 R 424 000 R 449 440 CRR
MB176 Economic
Development
Setting up of a
Business Chamber for
the Disabled, Women
and Youth
Institutional Institutional R 157 500 R 165 375 R 385 875 CRR
MB177 Economic
Development
Development of the
Informal Economy
Strategy
Institutional Institutional R 367 500 R 385 875 R 220 500 CRR
MB178 Economic
Development
Maintenance of
Existing Trading Stalls
Institutional Institutional R 300 000 R 318 000 R 337 080 CRR
MB179 Economic
Development
Development of the
Business License
Policy
Institutional Institutional R 157 500 R 165 375 R 220 500 CRR
MB180 Economic
Development
Development of
Implementation
Strategy for Street
Trading By-Law
Institutional Institutional R 210 000 R 220 500 R 571 503 CRR
MB181 Economic
Development
Establishment of a
40mw solid waste to
Energy Plant
Instituitional Instituitional R 200 000 R 212 000 R 224 720 CRR
MB182 Economic Establishment of a Instituitional Instituitional R 121 875 R 129 188 R 136 939 CRR

228

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
Development 10mw solar Energy
Plant
MB183 Economic
Development
Business Process
Services/ Outsourcing
(BPS)
Instituitional Instituitional R 155 625 R 164 963 R 174 860 CRR
MB184 Economic
Development
Capital Projects
Feasibility Programme
(CPFP)
Instituitional Instituitional R 100 000 R 106 000 R 112 360 CRR
MB185 Economic
Development
Clothing and Textile
Competitiveness
Programme (CTCIP)
Instituitional Instituitional R 150 000 R 159 000 R 168 540 CRR
MB186 Economic
Development
Medium and Heavy
Commercial
Automotive Investment
Scheme (MHCV-AIS)
20-30%
Instituitional Instituitional R 200 000 R 212 000 R 224 720 CRR
MB187 Economic
Development
People-Carrier
Automotive Scheme (P-
AIS) 20-35%
Instituitional Instituitional R 100 000 R 106 000 R 112 360 CRR
MB188 Economic
Development
Production Incentive
Programme (PIP)
Instituitional Instituitional R 130 000 R 137 800 R 146 068 CRR
MB189 Economic
Development
Sector Specific
Assistance Programme
(SSAP)
Instituitional Instituitional R 100 000 R 106 000 R 112 360 CRR
MB190 Economic
Development
SEDA Technology
Programme (STP)
Instituitional Instituitional R 150 000 R 159 000 R 168 540 CRR
MB191 Economic
Development
Technology and
Human Resource for
Industry Programme
(THRIP)
Instituitional Instituitional R 100 000 R 106 000 R 112 360 CRR
MB192 Economic
Development
The Manufacturing
Competitiveness
Enhancement
Programme (MCEP)
Instituitional Instituitional R 150 000 R 159 000 R 168 540 CRR

229

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB193 Economic
Development
Isivande Women’s
Fund (IWF)
Institutional Institutional R 100 000 R 106 000 R 112 360 CRR
MB194 Economic
Development
Black Business
Supplier Development
Programme (BBSDP)
Institutional Institutional R 150 000 R 159 000 R 168 540 CRR
MB195 Economic
Development
Incubation Support
Programme (ISP)
Institutional Institutional R 150 000 R 159 000 R 168 540 CRR
MB196 Economic
Development
Support for Industrial
Innovation (SII)
Institutional Institutional R 150 000 R 159 000 R 168 540 CRR
MB197 Economic
Development
Small Medium
Enterprise
Development
Programme (SMEDP)
Institutional Institutional R 100 000 R 106 000 R 112 360 CRR
MB198 Economic
Development
Tax Allowance
Incentive (TAI) R30m
Institutional Institutional R 150 000 R 159 000 R 168 540 CRR
MB199 Economic
Development
Automotive Investment
Scheme (AIS) 10-30%
Institutional Institutional R 100 000 R 106 000 R 112 360 CRR
MB200 Economic
Development
Export Marketing and
Investment Assistance
Programme (EMIAP)
Institutional Institutional R 200 000 R 212 000 R 224 720 CRR
MB201 Economic
Development
Support for the
Mpumalanga Cultural
Hub
Whiteriver 30 R 150 000 R 159 000 R 168 540 CRR
MB202 Economic
Development
Critical Infrastructure
Programme (CIP) 10-
30%
Instituitional Instituitional R 200 000 R 212 000 R 224 720 CRR
MB203 Economic
Development
Co-Operatives
Incentive Scheme (CIS)
Instituitional Instituitional R 200 000 R 212 000 R 224 720 CRR
MB204 Economic
Development
Film Incentive
Programme
Instituitional Instituitional R 150 000 R 159 000 R 168 540 CRR
MB205 Economic
Development
Implementation of the
Siyathunga eMbombela
Instituitional Instituitional R 100 000 R 106 000 R 112 360 CRR

230

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
Womens Support
Programme (SMWSP)
MB206 Economic
Development
Implementation of the
Siyatentela eMbombela
Artisan Support
Programme (SMASP)
Mbombela 15 R 100 000 R 106 000 R 112 360 CRR
MB207 Economic
Development
Implementation of the
Siyathengisa
eMbombela Informal
Trade Support Initiative
(SMITSI)
Instituitional Instituitional R 100 000 R 106 000 R 112 360 CRR
MB208 Economic
Development
Implementation of the
Siyatakhela
eMbombela Contractor
Development
Programme (SMCDP)
Instituitional Instituitional R 200 000 R 212 000 R 224 720 CRR
MB209 Economic
Development
Siyatilimela eMbombela
Agricultural
Development Support
Programme (SMADSP)
Instituitional Instituitional R 150 000 R 159 000 R 168 540 CRR
MB210 Economic
Development
Implementation of the
Siyangcebeleka
eMbombela Tourism
Development
Programme (SMTDP)
Instituitional Instituitional R 150 000 R 159 000 R 168 540 CRR
MB211 Economic
Development
Provision of Internet
Infrastructure in the
Rural Areas
Institutional Institutional R 300 000 R 318 000 R 337 080 CRR
MB212 Community
Development
Research and
documentation of
heritage sites and
resources
Institutional Institutional R 700 000 R 200 000 R - CRR
MB213 Community
Development
Sustainability of arts,
culture & heritage
programmes
Institutional Institutional R 500 000 R 1 000 000 R 1 200 000 CRR

231

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB214 Community
Development
Sustainability of
Mbombela Art Gallery
Institutional Institutional R 60 000 R 60 000 R 60 000 CRR
MB215 Community
Development
Recreational
programmes
Institutional Institutional R 800 000 R 1 000 000 R 1 200 000 CRR
MB216 Community
Development
Library Programmes Institutional Institutional R 300 000 R 330 000 R 363 000 CRR
MB217 Community
Development
Annual Sports Program Institutional Institutional R 1 400 000 R 1 800 000 R 2 300 000 CRR
MB218 Community
Development
Conduct Study on New
Cemeteries
Institutional Institutional R 500 000 R 525 000 R 551 250 CRR
MB219 Community
Development
City Beautification Institutional Institutional R 500 000 R 525 000 R 551 250 CRR
MB220 Community
Development
Planting of Trees in
Households
Institutional Institutional R 500 000 R 525 000 R 551 250 CRR
MB221 Community
Development
Grading of Open
Grounds
Institutional Institutional R 2 625 000 R 3 281 250 R 4 101 563 CRR
MB222 Community
Development
Mayoral tournament Institutional Institutional R 1 785 000 R 1 874 250 R 2 500 000 CRR
MB223 Community
Development
Transport Legal and
Policy Framework
Institutional Institutional R 500 000 R 625 000 R 687 500 CRR
MB224 Community
Development
Emergency Control
Room Maintenance
Institutional Institutional R 250 000 R 300 000 R 300 000 CRR
MB225 Community
Development
Purchasing of
Personal Protective
Equipment
Institutional Institutional R 500 000 R 150 000 R 150 000 CRR
MB226 Community
Development
Purchasing of
Mbombela Fire, rescue
and Emergency
Services Fire Furniture
(Single Beds)
Institutional Institutional R 200 000 R 150 000 R 175 000 CRR

232

IDP
NUMBER
MUNICIPAL
PRIORITY
PROJECT
DESCRIPTION
LOCATION WARD 2015/2016
BUDGET
ESTIMATE
2016/2017
BUDGET
FORECAST
2017/2018
BUDGET
FORECAST
SOURCE OF
FUNDING
MB227 Community
Development
Disaster Management
& Fire awareness
programs
Institutional Institutional R 200 000 R 350 000 R 300 000 CRR
MB228 Community
Development
Disaster Management
equipment
Institutional Institutional R 60 000 R 60 000 R 110 000 CRR

233

7.4: Projects from sector departments
7.4.1 DEPARTMENT OF HEALTH
PROJECT NAME LOCATION BUDGET “R’000” START DATE END DATE
KANYAMAZANE CHC: Construction of
new Kanyamazane CHC.
Kanyamazane
R5 000 01 April 2015 31 March 2017
NELSPRUIT CHC: Repairs, rehabilitation
& refurbishment
Mbombela
R2 000 01 April 2015 31 March 2015
THEMBA HOSPITAL: Renovation of X-
Rays and other wards
Kabokweni
R59 605 13 January 2015 14 January 2016
ROB FERREIRA HOSPITAL: Phase 4E:
Part 1: New Residence building with 150
units.
Mbombela
R5 000 09 January 2012 18 August 2014
ROB FERREIRA HOSPITAL: Repairs,
rehabilitation & refurbishment to the
mortuary and old nurses home
Mbombela
R 4 613 01 April 2015 31 March 2016
ROB FERREIRA HOSPITAL: Completion
of works for statutory compliance
Mbombela
R5 000 01 April 2015 31 March 2017
ANDERSON STREET: Ehlanzeni District
Office: Repairs, rehabilitation &
refurbishment
Mbombela
R5 000 01 April 2015 31 March 2016
MTHIMBA CHC: Conversion of
accommodation room to wards. ( EPWP)
Mthimba
R 755 01 April 2015 31 March 2016

7.4.2 DEPARTMENT OF SOCIAL DEVELOPMENT
PROJECT NAME PROJECT DESCRIPRION BUDGET “R’000”
Jerusalem Branch office New block x20 offices 13,300,000
Ehlanzeni secure care centre Secure care facility for children in conflict with
the law
465,000

234

7.4.3 DEPARTMENT OF COMMUNITY SAFETY, SECURITY AND LIAISON

PROJECT NAME
LOCATION BUDGET R”000”
Educational Awareness Campaigns:
Gender based violence
Liqour traders workshop
Anti stolen goods
Trio crime
Moral Regeneration
Kabokweni and Whiteriver
Kanyamazane
Kabokweni
Matsulu
Ehlanzeni
140
Community Outreach Mbombela 667
Integrated crime prevention initiatives
Rural safety:
Paralegal workshops
Vulnerable groups: Child protection week and Mandela Day
Contact crime
School safety focusing on 4 schools
Nelspruit and Whiteriver
Ngodwane
Pienaar Cluster
50
140
50
40
Transport regulation: Safety engineering, Traffic law enforcement, Traffic
administration and licensing and overload control
All Municipalities Operational
Monitoring and evaluation Local police station and Cluster operational

7.4.4 DEPARTMENT OF PUBLIC WORKS, ROADS AND TRANSPORT
PROJECT NAME BENEFICIARY WARD ANNUAL BUDGET 2015/16
R’000
START DATE END DATE
Upgrade of D2967 (Including 0.5 km Section on Road D2969 and
construction of a bridge between Manzini and Mgcobaneni
5;9
5 001 17-Mar-2014 17-Aug-2015
Reconstruction of a Flood Damaged Culvert on road D2973
between Gutshwakop and Clau-Clau
35
14 508 01-Mar-2015 30-Aug-2015
Repair of Flood Damaged Bridge on Road D2968 between Numbi
and Makoko
37
22 015
16-Aug-2015 15-Aug-2016
Rehabilitation of Road D2969 between Manzini and Swalala
(3.8km)
7
1 787 07-Jul-2013 09-Sept-2014

235

Rehabilitation of Road P17/6 (R538) Jerusalem to R40 at
Casterbridge (16km). Also address drainage, pedestrian
accommodation & road protection issues on entire road.
5,6,9,25
82 890 01-Jan-2014 01-Sep-2015

7.4.5 DEPARTMENT OF WATER AND SANITATION
PROJECT NAME PROJECT
BENEFICIARIES/LOCATION
PROJECT OBJECTIVE KEY PERFORMANCE
INDICATOR
PERIOD BUDGET
ALLOCATION
(ANNUAL) R’000
WSOSG Mbombela
WTWs
Mbombela community To promote and ensure the water
quality through the rehabilitation of
the WTW and networks
Number of transferred water
schemes not meeting required
standard.
01/07/2015 to
31/06/2016
R20 000
RBIG
Northern Nsikazi BWS
Mbombela community To ensure that community receive
clean water
Number of bulk infrastructure
schemes under construction
01/07/2015 to
31/06/2016
R30 000
MWIG
Mbombela storages, bulk
lines and reticulation
16 areas/projects in Mbombela To provide interim access to water Number of households provided
with basic water supply
01/07/2015 to
31/06/2016
R60 399

236

7.4.6 DEPARTMENT OF EDUCATION
PROJECT
NAME
PROGRAMME PROJECT DESCRIPTION START DATE END DATE ESTIMATED COSTS BUDGET “R”
2015/2016 2016/2017 2017/2018
Khulumani
[Ebuhleni]
New &
Replacement
Schools
Construct 16 Classrooms,
Administration block, Library, Computer
Centre, school Hall, 24 toilets, fence,
electricity, water, kitchen, ramps and
rails
2012-10-01 2014-03-31 8 374 458 - - -
Ebuhleni
(Phase 2)
New &
Replacement
Schools
Construct 16 Classrooms,
Administration block, Library, Computer
Centre, school hall, 24 toilets, fence,
Electricity, Water, Kitchen, Ramps and
Rails
2014-11-20 2015-10-20 39 463 000 26 376 000 6 000 000 -
Mbombela New &
Replacement
Schools
Planning and Design: Construct 24
Classrooms, Administration block,
library, computer centre, School Hall,
36 Toilets, Fence, Electricity, Water,
Kitchen, ramps + rails, 3 Sports
Grounds and Car Park.
2016-04-01 2017-06-30 42 000 000 2 300 000 24 600 000 15 100 000
Msholozi New &
Replacement
Schools
CRDP - Planning and Design:
Construction of Grade R centre, 20
Classrooms, Administration block,
library, computer centre, School Hall,
30 Toilets, Fence, Electricity, Water,
Kitchen, ramps +rails, 3 Sports
Grounds and Car Park.
2017-04-01 2018-06-30 40 000 000 - 2 000 000 38 000 000
School for the
Deaf
New &
Replacement
Schools
All buildings to be sound proof.
Construction of 30 classrooms with
supporting facilities, ablution block with
15 toilets, administration block with a
staff room for 40 educators, boardroom
for 30 people, multipurpose hall with
supporting facilities including fitness
centre, laboratory, library, e-learning
centre, 6 workshops, 3 therapy rooms
with offices, counselling room, office for
professional nurse with dispensary, 4
sickrooms and 3 toilets inclusive of a
toilet for persons with disability,
audiology room, art theatre, covered
walkways, fence, electricity, water,
dining hall, car park, garages, hostel
TBA TBA 250 000 000 120 000 000 65 777 390 55 000 000

237

cluster with supporting facilities, 2 guest
rooms and flats, 6 sports grounds and
swimming pool with 2 cloak rooms.
Tekwane
North
New &
Replacement
Schools
Planning and Design: Construct 24
Classrooms, Administration block,
laboratory, library, computer centre,
School Hall, 30 Toilets, Fence,
Electricity, Water, Kitchen, ramps +
rails, 3 Sports Grounds and Car Park.
2015-02-02 2016-02-26 39 000 000 35 759 087 23 597 302 -
Tekwane
South
New &
Replacement
Schools
Construct 24 Classrooms,
Administration block, laboratory, library,
computer centre, School Hall, 30
Toilets, Fence, Electricity, Water,
Kitchen, ramps + rails, 3 Sports
Grounds and Car Park.
2013-04-01 2015-03-31 48 857 000 12 495 808 - 488 570
White River New &
Replacement
Schools
Planning and Design: Construct 28
Classrooms, Administration block,
laboratory, library, computer centre,
School Hall, 40 Toilets, Fence,
Electricity, Water, Kitchen, ramps
+rails, 3 Sports Grounds and Car Park.
2015-04-01 2016-06-30 47 933 162 41 133 162 6 100 000 -
Mgcobaneni New &
Replacement
Schools
Substitution of 19 unsafe structures and
construction of Grade R Centre
Centre, 4t and F, administration block,
lib, cc, kitchen, 28 toilets, 3 SG and CP.
2013-02-08 2014-07-31 36 403 000 - - -
Hazyview Upgrades &
Additions
Construction of 1 workshop and
renovations and refurbishment to 3
other workshops.
2014-09-01 2015-08-31 11 700 000 3 600 000 - 95 122
Chief Fana
Dlamini
New &
Replacement
Schools
Planning and Design: Construction of
24 Classrooms, administration block,
laboratory, library, computer centre, 30
toilets, Scholl Hall, Electricity, Water, 3
Sports Grounds & Car Park.
2016-04-01 2017-03-30 42 000 000 2 400 000 24 000 000 15 600 000
Gedlembane Upgrades &
Additions
Construction of 8 Classrooms,
Computer Centre, Library, Laboratory,
School Hall, Administration block, 18
Toilets, Fencing, Renovation of 20
Classrooms, and Demolition of an
Administration Block and Toilets
2013-01-29 2014-06-30 11 825 000 - - -

238

Tenteleni Upgrades &
Additions
Phase 1 - Construction of a Grade R
Centre with toilets and fence, kitchen
and library (by Education)
Multi-purpose centre (COGTA)
Phase 2 - Administration block and
upgrade of sports facilities.
2015-02-15 2015-08-14 7 258 770 7 258 770 72 588 -
Ehlanzeni and
other District
Office
Maintenance &
Repairs
Refurbishment, maintenance and
repairs to 4 district offices.
2014-06-01 2015-03-31 7 240 000 - - -
Mtfophi
(Daantjie)
New &
Replacement
Schools
Planning and Design: Construction of a
Grade R centre, 24classrooms,
administration block, library, computer
centre, scholl hall. 36toilets, fence,
electricity, water, kitchen, ramps & rails,
3 sports grounds & car park.
2014-04-01 2016-03-31 42 000 000 34 600 000 6 200 000 -
Yinhlelentfo New &
Replacement
Schools
Construction of a Grade R Centre,
16classroom, administration block,
library, computer centre, School Hall,
24Toilets, Fence, Electricity, Watre,
Kitchen, ramps / rails, 3 Sports
Grounds & Car Park.
2015-04-01 2016-12-31 30 000 000 1 500 000 28 500 000 -
Tfolinhlanhla New &
Replacement
Schools
Planning and Design: Replacement of
condemn structures (ex Storm Damage
Schools)
2014-05-01 2015-03-31 1 070 500 1 070 500 - -
Numbi Upgrades &
Additions
4 Classrooms 2015-04-01 2015-03-31 2 947 200 - - -
Shishila New &
Replacement
Schools
Administration Block 2015-04-01 2015-12-31 3 000 000 - - -
Jacob Mdluli Rehabilitation,
Renovation &
Refurbishment
CRDP: Renovation and furnishing of
science laboratory.
2014-06-01 2015-01-31 300 000 - - -
Boschrand
Primary
School
Rehabilitation,
Renovation &
Refurbishment
Rehabilitation of existing mobile
classrooms, provision of additional and
site works
2014-02-24 2014-09-30 1 885 000 - - -
Enzani
Primary
School
Rehabilitation,
Renovation &
Refurbishment
Replace roof structure, covering and
ceilings over 3 classrooms and
construction of 12 enviro-loos
2014-02-24 2014-09-30 1 710 000 - - -

239

Lekazi
Primary
School
Rehabilitation,
Renovation &
Refurbishment
Replace roof structure, covering and
ceilings over 13 classrooms and
remedial works to eaves and verges
2014-02-24 2014-09-30 1 540 822 - - -
Phumalanga
Primary
School
Rehabilitation,
Renovation &
Refurbishment
Replace roof structure, covering and
ceilings over 12 classrooms, admin
block & toilets as deemed necessary
and remedial works to eaves and
verges
2014-02-24 2014-09-30 2 261 822 - - -
Sitfokotile
Secondary
School
Rehabilitation,
Renovation &
Refurbishment
Replace roof structure, covering and
ceilings over 10 classrooms and
remedial works to electrical installation
2014-02-24 2014-09-30 1 782 427 - - -
Siyamukela
Primary
School
Rehabilitation,
Renovation &
Refurbishment
Replace roof structure, covering and
ceilings over 4 classrooms and
remedial works to electrical installation
2014-02-24 2014-09-30 848 326 - - -
Takeleni
Primary
School
Rehabilitation,
Renovation &
Refurbishment
Replace roof structure, covering and
ceilings over 6 classroomm & ablutions
2014-02-24 2014-09-30 993 258 - - -
Tsandzanani
Primary
School
Rehabilitation,
Renovation &
Refurbishment
Rehabilitation of Storm Damaged
Structures. Demolishing of 18 unsafe
classrooms and construction of 18 new
classrooms and 20 Enviro-loo toilets.
2015-02-16 2015-12-18 17 676 833 14 141 466 3 535 367 176 768
Siligane Upgrades &
Additions
CRDP: Construction of 12 Enviro-Loo
toilets
2015-01-19 2015-05-15 919 940 551 964 - -
EJ Singwane Upgrades &
Additions
CRDP: Construction of 28 Enviro-Loo
toilets
2015-01-19 2015-05-15 2 038 543 1 223 126 - -
Khutsalani
Secondary
School
Upgrades &
Additions
Renovation and furnishing of science
laboratory.
2016-06-01 2017-01-31 300 000 - 300 000 -
Khumbula
secondary
school
Upgrades &
Additions
Refurbishment of a Technology &
Computer Centre construction of 4
laboratories for Maths, Physics
,Chemistry & life sciences and fencing
2015-04-01 2015-09-30 14 130 251 13 282 436 847 815

240

Mbombela
Circuit Office
Rehabilitation,
Renovation &
Refurbishment
Minor repairs to roof canopy at
verandas and remedial works to
finishes and waterproofing/sealing of
leaks to roof coverings
2014-11-14 2015-05-25 4 000 000 4 000 000 282 000
Siligane Upgrades &
Additions
CRDP: Construction of 12 Enviro-Loo
toilets
2015-01-19 2015-05-15 919 940 551 964 - -
Salubindza Rehabilitation,
Renovation &
Refurbishment
Replace roof structure, covering to 4
classrooms block remedial works to
walls and floors fixing, servicing and
restoration of electrical fittings and
cabling.
2015-02-16 2015-05-29 732 108 732 108 - -

7.4.7 DEPARTMENT OF HUMAN SETTLEMENT
PROJECT NAME WARD PROJECT OBJECTIVE KEY PERFORMANCE
INDICATOR
TARGET BUDGET
ALLOCATION
(ANNUAL) R’000
Matsulu 13,27,28,39 Adequate housing and improved
quality living environment
Number of informal settlement
upgraded
50 units 5 547
Mbombela TBC Number of households with access
to housing in rural areas
44 units 4 882
Sonheuwel 16 Number of social housing
constructed
Planning &
designs
1 000
Msogwaba and Daantjie TBC Number of Military Veterans
constructed
21 units 2 330
Tekwane North 26 Number of Social and Economic
Facility constructed
1 com hall 10 000

241

Tekwane South 18 Number of Integrated Residential
Development phase 1
722 sites 31 498
Tekwane North- Ibutho 26 Number of Integrated Residential
Development phase 2
100 units 11 095
Tekwane South- Sizamphilo 18 Number of Integrated Residential
Development phase 2
100 units 11 095

242

7.5 Projects from Eskom, 2014-2015 Financial Year
PROJECT NAME WARD NUMBER OF CONNECTIONS ESTIMATED COST(INCLUDING
VAT)
Bulunga family 11 20 R278 100.00
Comprehensive Phase 2 25 50 R695 250.00
Emoyeni (Hillaria) 26 185 R2 572 425.00
Mangozeni 11 49 R681 345.00
Mgwenya 36 30 R417 150.00
Mhlume (Bhayizane next to ZCC) 10 49 R681 345.00
Mjejane (Mdlankomo) 39 150 R2 085 750.00
Nkohlakalo 33 100 R1 390 500.00
Part of Clau
Clau/Mkhukhwini/Zombo
11 179 R2,488 995.00
Part of Ermelo (Nkomeni/Ngodini
dam)
11 20 R278 100.00
Part of Phola Park/Dwaleni section 32 94 R1 307 070.00
Spelanyane (Edinkhukwini/next to
ZCC)
10 62 R862 110.00
TV2 11 49 R681 345.00
Zomba 36 49 R681 345.00
Mbombela in-fills To be decided by
Eskom
1 648 R6 921 600.00

243

7. 6 UNFUNDED PROJECTS

UNFUNDED PROJECTS
NO DEPARTMENT MUNICIPAL
PRIORITY
PROJECT DESCRIPTION WARDS LOCATION BUDGET “MTREF”
2014/2015 2015/2016 2016/2017
UN1 Technical
Services
Water Supply Construction Of Jerusalem
2ml/Day Package Plant,
Bulkline And Refurbishment Of
Internal Reticulation Network
8 Jerusalem R - R - R -
UN2 Technical
Services
Water Supply Mshadza Package Plant, Bulk
Line
6 Mshadza R - R - R -
UN3 Technical
Services
Water Supply Upgrade Of Mahushu Water
Rising Main And 2ml Reservoir
3 Mahushu R - R - R -
UN4 Technical
Services
Water Supply Upgrade Of Majika Water
Works
25 Majika R - R - R -
UN5 Technical
Services
Water Supply Upgrade Of Ngodini
Refurbishment Of Bulkline
Supply To TV Reservoir &
Water Reticulation
33 Ngodini R - R - R -
UN6 Technical
Services
Water Supply Refurbishment Of Existing
Reticulation In Bhekiswayo
5 Bhekiswayo R - R - R -
UN7 Technical
Services
Water Supply Upgrading Of Bulk Pipeline
From Backdoor To Phathwa
38 Phathwa R - R - R -
UN8 Technical
Services
Water Supply Backdoor/Mbonisweni Water
Augmentation Scheme
38 Backdoor
Mbonisweni
R - R - R -
UN9 Technical
Services
Roads and
Stormwater
Management
6 X 4 Ton Tipper Trucks Institutional Institutional R - R - R -
UN10 Technical
Services
Roads and
Stormwater
Management
Designs For Replacement Of
Collapsed Stormwater Pipes
And Culverts In West Acres X
7, 8 & 29 (Phase 2,3 &4)
15,16 West Acres Ext
7,8,29
R - R - R -
UN11 Technical
Services
Roads and
Stormwater
Management
Design and construction of
New Gabion Structure-West
Acres Spruit
15,16 West Acres R - R - R -

244

UNFUNDED PROJECTS
NO DEPARTMENT MUNICIPAL
PRIORITY
PROJECT DESCRIPTION WARDS LOCATION BUDGET “MTREF”
2014/2015 2015/2016 2016/2017
UN12 Technical
Services
Roads and
Stormwater
Management
Design of New Parking at Civic
Centre - 3 donated stands
15,16 Sonheuwel R - R - R -
UN13 Technical
Services
Roads and
Stormwater
Management
Repair of erosion damage - all
streams in Mbombela:
Planning & Design
15,16 Mbombela R - R - R -
UN14 Technical
Services
Roads and
Stormwater
Management
Piet Retief St: Upgrading and
traffic safeguarding
15,16 Sonheuwel R - R - R -
UN15 Technical
Services
Roads and
Stormwater
Management
Enos Mabuza Dr: Planning &
design for widening of road
section from Madiba Dr to
Ferreira St (Construction in
2015/16)
15,16 Mbombela R - R - R -
UN16 Technical
Services
Roads and
Stormwater
Management
Upgrade Of Chweni Spienkop
Busroute
34 Chweni, Spienkop R - R - R -
UN17 Technical
Services
Roads and
Stormwater
Management
Upgrade Of Mafambisa To
Spelanyani Busroute
10 Mafambisa,
Spelanyane
R - R - R -
UN18 Technical
Services
Roads and
Stormwater
Management
Construction of
Hazyview/Emadwaleni Lodge
Internal Streets (1.4km)
1 Hazyview R - R - R -
UN19 Technical
Services
Roads and
Stormwater
Management
Upgrading of Makoko/Numbi
Gate Road
37 Makoko, Numbi R - R - R -
UN20 Technical
Services
Electricity
Supply &
Management
Energy Efficiency Programme Institutional Institutional R - R - R -
UN21 Technical
Services
Electricity
Supply &
Management
Substation Maintenance &
Refubishment
Institutional Institutional R - R - R -

245

UNFUNDED PROJECTS
NO DEPARTMENT MUNICIPAL
PRIORITY
PROJECT DESCRIPTION WARDS LOCATION BUDGET “MTREF”
2014/2015 2015/2016 2016/2017
UN22 Technical
Services
Governance
and Institutional
Development
Upgrade Of White River Moth 30 White
River/Institutional
R - R - R -
UN23 Technical
Services
Governance
and Institutional
Development
Purchase Of Personnel Carrier
Vehicles (Steel Copy)
Institutional Institutional R - R - R -
UN24 LED, URM &
Human
Settlement
Economic
Development
Marula Factory 39 Buyelani,
Mdlankomo
R - R - R -
UN25 LED, URM &
Human
Settlement
Integrated
Human
Settlement
Purchase of private land Ptn 3
of the farm Katoen ( to be
incorporated with Msholozi)
14 Msholozi R - R - R -
UN26 LED, URM &
Human
Settlement
Integrated
Human
Settlement
Purchase of private land Ptn
77 of the farm Alkmaar 286 (
houses invaded )

12 Alkmaar R - R - R -
UN27 Community
Services
Community
Services
Planning & construction of new
community halls
1, 14, 8, 37,
24, 9, 20,
32, 2, 25,
38, 6, 3, 39,
29
Hazyview,
Mataffin,
Jerusalem,
Malekutu,
Phumulani,
Mpakeni,
Mgcobaneni,
Kanyamazane,
Dwaleni,
Zwelishana,
KaMajika,
Mbonisweni,
Swalala,
Mahushu,
Nyongane,
KaTsela,
Shabalala
R - R - R -
UN28 Community
Services
Community
Services
Upgrading of community halls 37, 30, 15,
23, 19, 10,
31, 33, 31,
38, 14, 28,
Makoko hall,
White River hall,
Oewersig hall,
Daantjie hall,
R - R - R -

246

UNFUNDED PROJECTS
NO DEPARTMENT MUNICIPAL
PRIORITY
PROJECT DESCRIPTION WARDS LOCATION BUDGET “MTREF”
2014/2015 2015/2016 2016/2017
27 Kanyamazane
hall, Clau Clau
hall, Gutshwa Kop
hall, Luphisi hall,
Kabokweni hall,
Nsikazi hall

UN29 Community
Services
Community
Services
Fencing of community halls 17 Nelsville hall R - R - R -
UN30 Community
Services
Community
Services
Erecting Security Wall/
palisade
21,13 Kanyamazane
Stadium, Matsulu
multipurpose
court,
R - R - R -
UN31 Community
Services
Community
Services
Upgrading Of Flood lights at
sports facilities
14,16,17,
21,27, 28
Van Reibeeck,
Nelsville,
Valencia,
Kanyamazane,
Kabokweni
R - R - R -
UN32 Community
Services
Community
Services
Purchase of garden
maintenance equipment
all R - R - R -
UN33 Community
Services
Community
Services
Upgrading of Kabokweni
Stadium
33 Kabokweni R - R - R -
UN34 Community
Services
Community
Services
Planning & construction of new
cricket oval at
37A Malukutu R - R - R -
UN35 Community
Services
Community
Services
Construction of new
Kanyamazane Driver Testing
Facility
21 Kanyamazane R - R - R -
UN36 Community
Services
Community
Services
Masoyi Driver Testing Facility
6 Masoyi R - R - R -
UN37 Community
Services
Community
Services
Kabokweni Satellite Office-
Licensing
33 Kabokweni R - R - R -
UN38 Community
Services
Community
Services
Installation of air condition in
Mbombela library
15 Mbombela R - R - R -

247

7.5 OTHER UNFUNDED PROJECTS

1. WATER
Project Description Location

Bulk pipe - Upgrade Phola offtake to Manzini / Swalala offtake, Bulk pipe - Upgrade Manzini / Swalala offtake to Mcgobaneni
Tee, Bulk pipe - Upgrade Mcgobaneni Tee to Mcgobaneni Reservoir offtake, Bulk pipe - Upgrade Mcgobaneni Res offtake to
Mcgobaneni Reservoir, Bulk pipe - Upgrade Phameni Reservoir to Phameni,Bulk pipe - Upgrade Phameni to Makoko Res
offtake, Bulk pipe - Upgrade Makoko Res offtake to Mjejane offtake, Bulk pipe - Upgrade Mjejane offtake to Malekutu
Reservoir,Bulk pipe - Upgrade Mcgobaneni Tee to Lundi offtake, Bulk line - Upgrade Booster PS – Gutshwa, MIG:
NEWSCOM - Upgrade Bulk and network reticulation, MIG: NZK - Msogwaba and Pienaar (ward 22 & 23) water network
extentions, Remove Midblocks, Refurbish & Extend network at Backdoor, Refurbish & Extend network at Buyelani (Kiaat),
Refurbish & Extend network at Clau-Clau

Chweni, Jerusalem, Khumbula, Legogote, Lundi, Mahushu,
Mshadza, Mgcobaneni, Hoxane, Kabokweni, Clau
Clau,Kanyamazane, Areas in Nsikazi South & Nsikazi South,
Matsulu, Phathwa

Refurbish & Extend network at Gutshwa - New Bulk line, Booster PS, Refurbish & Extend network at Gutshwakop,
Refurbish & Extend network at Kabokweni, Refurbish & Extend network at Kanyamanzane, Refurbish & Extend network at
Mafamphisa, Refurbish & Extend network at Mbonisweni, Refurbish & Extend network at Msogwaba / Aldie / Lehawu
Refurbish & Extend network at Newscom, Refurbish & Extend network at Pathwa; Refurbish & Extend network at
Siphelanyane, Bulk Pipe: Vodacom Pumpline (Change To Intermediate), Bulk Pipe: Refurbish Intermediate To Matsulu B
Bulk Supply; Bulk Pipe from Intermediate reservoir to Matsulu C - Northeast Bulk Supply; Bulk Pipe: New Mains As Per
Master Plan, Reservoirs: Maintain Water Quality (Reservoir Roofs), Reservoirs: Build New Reservoirs, Reticulations:
Network Extensions at Matsulu west & Matsulu C, Reticulations: Install Networks In Informal Settlements; Reticulations:
Remove Midblocks, Refurbishment of bulk infrastructure at Nsikazi Areas; Additional 1ML/D at Msogwaba( old cemetery
Kanyamazane), Extention of reticulation at Zomba, Additional 2ML/D reservoir at Phakane, Bulkline connection to TV trust
reservoir ; Extention of reticulation network at Mahushu and Bhekiswayo, MIG: NEWSCOM - Upgrade Bulk and network
reticulation

Backdoor, Buyelani (Kiaat), Clau Clau, Gutshwa, Gutshwakop,
Kabokweni, Kanyamazane, Mafambisa, Mbonisweni, Msogwaba,
Aldie, Lehawu, Newscom, Phathwa, Spelenyane, Matsulu B,
Matsulu C, Matsulu West and Matsulu C, Msogwaba, Zomba,
Phakane, TV Trust, Mahushu and Bhekiswayo, Newscom

Refurbish & Extend network at Nyongane, Refurbish & Extend network at Phameni, Refurbish & Extend network at Phola,
Refurbish & Extend network at Salubindza, Refurbish & Extend network at Sandrivier / Majika, Refurbish & Extend network
at Shabalala, Refurbish & Extend network at Swalala, Refurbishment of Bulk and Internal Services -South Nsikazi,Bulk pipe
- Upgrade Kabokweni Reservoir Mpumalanga PS to Mbonisweni Reserviors,Bulk pipe - Upgrade Clau Clau Reservoir to the
College, Bulk pipe - Upgrade Aldie booster pump station to Zwelisha B (Gedlebane) Reservoir, Bulk pipe -Upgrade Main
Line & Booster PS to Lehawu West bottom steel tank, Bulk pipe – Upgrade Factories reservoir to (Teka-Takho steel tank),
Booster PS, Bulk pipe - Upgrade Clau Clau Reservoir to Dwaleni Pump Station, Bulk pipe - Upgrade Pienaar to Zwelisha to
Silulumanzi supply,Bulk pipe - Upgrade Aldie Pump Station to Lehawu West off take, MIG: NZK - Msogwaba and Pienaar
(ward 22 & 23) water network extentions; Refurbish & Extend network at Newscom, Extention of Reticulation at Zomba
Additional 2ML/D reservoir at Phakane, Tekwane North Outfall Sewer, Link old Mshadza plant to Phola reservoir

Nyongane, Phameni, Phola,Salubinza, Sandriver, Majika, Shabalala,
Swalala, Msogwaba, Newscom, Zomba, Phakane, Tekwane North,
Phola

248

2. ROADS, STORM WATER AND SEWER
Project Description Location

Pedestrian bridges - Ward 1 (14), Ward 2 (8), Ward 3 (5),Ward 5 (16), Ward 7 (12),Ward 8 (18),Ward 9 (24),Ward 10
(9),Ward 11 (10),Ward 14 (2),Ward 17 (5),Ward 18 (3), Ward 21 (8),Ward 22 (8),Ward 24 (5),Ward 26 (8),Ward 27
(24),Ward 32 (15),Ward 33 (3), Ward 35 (4),Ward 36 (3)

Tshabalala,Msogwaba,Mahushu,Phola/Swalala,Phola,Legogote,Mgc
obaneni,Luphisi,Ngodini,Mataffin,Mbombela,Tekwane,Msogwaba,Ms
ogwaba,Mpakeni,TekwaneNorth,Matsulu B,Dwaleni/Teka
Takho,Kabokweni,Gutshwa,Newscom
Rods- Spelenyane Mafambisa road,Construction of Bus Route D2967 in Manzini and Bridge,Mcobaneni Loop Bus
route,Mgcobaneni Phameni Link Road, Khumbula ink Roads,Spioenkop road D1411 from D363 To Chweni,Nkambeni link to
D2965, Mgandusweni Link,Lundi link road,Newscom Zwelisha Link,Msogwaba busroute,Msogwaba link, Numbi Link 1 &
2,Mahushu Mountain View Link, Mahushu,Phola Link, Roads and Stormwater Shabala Nyongane PH2 (189-192),Roads and
Stormwater Legogote PH 4 (94 & 95),Roads and Strormwater Shabalala (153, 54 157),Roads and Strormwater Nyongane
(160,161, 167 158 159 162 ),Roads and Strormwater Hazy View Vakansie Dorp (205-208, 21),Roads and Strormwater
Clau-Clau Ph2 (65-68), Roads and Strormwater Clau-Clau Ph3 (228,71,72 & 82 ), Roads and Strormwater Clau-Clau Ph4
(74, 75), Roads and Strormwater Matsulu PH1 (221,224,226), Roads and Strormwater Matsulu PH2 (222,223,225), Roads
and Strormwater Matsulu PH3 (219,220), Roads and Strormwater Kanyamazane Ph4 (199,36,50,51 ), Roads and
Strormwater Kanyamazane Ph5 (41,18,20,22,19,4,59), Roads and Strormwater Kanyamazane Ph6 (25,23,24,7,26,27 ),
Roads and Strormwater Kanyamazane Ph7 (28,14,15,35,203,47), Roads and Strormwater Emoyeni (94,95),Roads and
Strormwater Matsulu Ph4 (96), Roads and Strormwater Matsulu Ph5 (97,98), Roads and Strormwater Matsulu Ph6
(99,102,103,104,105), Roads and Strormwater Matsulu Ph7 (100,101), Roads and Strormwater Msogwaba Ph2 (106,-110),
Roads and Strormwater Ghutswa (6,111,112), Roads and Strormwater M, hushu mountain view (136), Roads and
Strormwater Dwaleni (60,62), Roads and Strormwater Backdoor Mbonisweni (79,80,172,173), Roads and Strormwater
MAlekutu (99), Roads to Mbuyane Sec School(63), Roads & Stormwater Clau-Clau Ph4 (70,73,76,77), Stormwater Zwelisha
(171,227), Roads and Strormwater Kanyamazane Ph8 (8,45,46,202), Roads and Strormwater Kanyamzane Ph9(117,118),
Roads and Strormwater Msogwaba Ph1(81-86), Roads and Strormwater Msogwaba Ph3 (170,175),Roads and
Strormwater Phola (164,165,115,116),Roads and Strormwater Salubinza (149-152), Roads and Strormwater
Mbekiswayo(138),Roads and Strormwater Numbi(146-148),Roads and Strormwater Phola (132),Roads and Strormwater
Manzini (126-131,110),Roads and Strormwater Manzini Ph 2 (111,112,118-124,166),Roads and Strormwater Phola
(113,114,163), Strormwater Mcobaneni (125),Strormwater Swalala (108,109),Roads and Strormwater Jerusalem
(96,97,105-107),Roads and Strormwater Cwheni (91), Roads and Strormwater Legogote/Lundi (92,93),Sonata Street Bus
Stop and Roudabout
Phameni,Khumbula,Chweni,Nkambeni,Mgandusweni,Lundi,Newsco
m & Zwelisha, Zwelisha,Msogwaba,Numbi,Mahushu Mountain View,
Mahushu,Phola, Manzini,Mgcobaneni, Shabalala,
Nyongane,Legogete, Hazyview CBD, Clau-clau, Matsulu,
Kanyamazane,Msogwana, Ghutswakop,Mahushu Mountain
view,Dwaleni,Backdoor Mbonisweni,Malekutu, Emoyeni,
Salubinza,Mbekiswayo, Jerusalem, Legogote/Lundi, Mbombela
Riverside Public Transport Facility, White River Public Transport Facility,Rocky Drift Public Transport Facility, Extend 6 lanes
R40 (R37 to Nelsriver)

White River, Rocky drift, Mbombela
New Link Road - Nel to Roodt Street, New Link Road - Friedenheim to Van der Merwe Streets,New traffic signals - Cnr
Liebenberg and Ferreira Streets, New traffic signals - Cnr Ehmke and Van der Merwe Streets, New Link Road - Ferreira and
Du Preez Streets, Existing streets in Mbombela to be increased to four lanes: Enos Mabuza from Halssnoer up to R40,
Existing streets in Mbombela to be increased to four lanes: Van der Merwe between Henshall & Ferreira, New links to be
provided: Extensions of Van Rooyen, Fig Tree & Percy Fitzpatrick

Mbombela
P166 Western Bypass: Upgrading of remainder of R40 to 6 lanes, R40 Widening Phase 2 (Riverside – D812) (Tech – Dr
Enos Mabuza), R40 Widening Phase 3 (Tech – Cromdale); Existing streets in Mbombela to be increased to four lanes:
Figtree (alternative to R40), Existing streets in Mbombela to be increased to four lanes: Russel, Existing streets in Mbombela
to be increased to four lanes: Geelhout, Existing streets and roads to be increased to six lanes: Piet Retief between R40 &
Rodd, Existing streets and roads to be increased to six lanes: Paul Kruger & Andrew – remove parallel parking

Mbombela
Existing streets and roads to be increased to six lanes: Old N4 from Orchards to Friedenheim, Existing streets and roads to

249

be increased to six lanes: Old N4 between R40 and Nel/Brown, New links to be provided: New link between Friedenheim &
Van der Merwe/Henshall, New links to be provided: Link Du Preez & Piet Retief, New links to be provided: Boschrand area
roads, New Matsulu direct link with N4: Construction of new 2 lanes Matsulu Link direct link with N4; Existing streets and
roads to be increased to six lanes: Friedenheim between N4 and Kanyamazane Rd, New links to be provided: Extend
Johanna to Sarel Cilliers/Piet Retief (alternative to R40 & Ferreira)
Mbombela, Matsulu, Kamagugu
200mm Pump Pressure Control required to limit static pressure, 105m x 355mm Ø Parallel reinforcement, 20m x 160mm Ø
Parallel reinforcement, 75m x 450mm Ø Parallel reinforcement; 1015m x 315mm Ø Parallel reinforcement, 230m x 250mm
Ø Parallel reinforcement, 20m x 250mm Ø Link pipe, 195m x 160mm Ø Parallel reinforcement, 160mm Valve - close to
isolate tower from reservoir, 110mm Inlet flow control valve at Hillsview reservoir, 110mm Valves - close to isolate Hillsview
zone from Nooitgedacht zone (x3), 160mm Valves - close to isolate Hillsview zone from Nooitgedacht zone (x2), 75mm
Valves - close to isolate Hillsview zone from Nooitgedacht zone, 30mx 315mm Ø Parallel pipe from WTP to pump station,
3801.6kl/d 56m Booster pump to, 600m x 200mm Ø Main pipe to future area Phumlani, 1145m x 160mm Ø Main pipe to
future area Phumlani, 200mm PRV set at 40 m, egl = 902 m.a.s.l. to reduce static head, 405m x 200mm Ø Main pipe to
future area Phumlani, 105m x 110mm Main pipe to future areas Nooitgedacht 2,Casterbridge,The Fountains 1,Victiria
2,White River x22/46,Witrivier AH 1/2, Portion 41 & Cloleen, Future Master Plan Items White River, 890m x 500mm Ø Pipe,
20700kl/d 85m Pump, New Outfall Sewer, Future Master Plan Items Rocky Drift

White River, Hillsview, Phumlani, Rockys Drift, Hazyview
3. ELECTRICITY
Project Description Location

Public lighting (highmast lights)

All areas within Mbombela municipal area
Electrifiaction of households Zwelishana;Zwelisha;Mluti;Mandlesive;Phakane;Sicelosetfu vicinity;Los;Elephant and Siphumelele; Mhlume; Bhayizane; Mafambisa; ClauClau;
Spelenyane; Luphisi; TV; Mashonamini;Mangozeni;part of ClauClau;eMathuneni;part of Ermelo;Magwabaratsane;Slovo Park; Hillaria Settlement;
Mathangini;Matsulu entrance;Magamusi;Thulani;Youth Centre;Mountainview;Informal Settlement;Thembelihle;part of Phola
Park;Mhlumeni;Dwaleni;ection;Sandzile;Nkhohlakalo;Halfway;Bhuga;Matangaleni;Bhaburi;part of
Siligane;Sifunindlela;Skonkwane;Maswirijini;Tycoon;Bhodlindlala;eMakotapenini & New Stands
Nyongane;Mkhukhwini;Ngulubeni;Sibusisiwe;Mazakhele;Mvangatini;Sibuyile;Buyelani;Maphakama;part of Zomba(Ngobiyanini);part of Moyeni &
Zwelisha;Banda;Zomba next to Sabane High School; Stadium;
;Block;Mdumiseni;Lungisani;maFifty;Thubelihle;eMbolwane;Mountainview;Woodhouse;Sterkspruit;Msholozi;Hopeville;Lugedleni;Daantjie
section;Khombaso;Madala;part of Mtimba; Sbhulo vicinity;Lucia Park next to cemetery;Dam vicinity;Mbombela Bricks vicinity;Old Sewerage Plant
vicinity; Chweni(Scom-Bantwana & Milungwe); Numbi (Mbolwane area next to cemetery); Khumbula(Clinic/Dingindoda area &
Emvakwentsaba);Phameni; Numbi-eDibhini; Mashonamini;Makoko;Phathumetshiso; Mashonisa;part of Khumbula;part of Malekutu
4. COMMUNITY FACILITIES
Project Description Location
Construction of New Swimming pools Matsulu, Nyongane, Nsikazi , Phameni, Mataffin, Hillsview
Renovations and upgrading of dilapidated swimming pools Nelsville, Valencia, White River, Hazeyview
New construction of multipurpose courts and upgrading of the stadium Matsulu, Nsikazi, Nyongane, Masoyi, Zwelisha, Mbombela, Kamagugu, Msogwaba
Grading of sports fields and maintenance process All areas

250

Upgrading of security fencing at the sports facilities
Van Reibeeck sports complex, Rugby club,Valencia sports complex, Nelsville sports complex, Matsulu complex,
Zwelisha sports complex, Kabokweni stadium, White River Sports complex, White river swimming pool, Nsikazi
stadium, Nyongane sports complex
5. LAND USE AND DEVELOPMENT
Project Description Location
Land Tenure Upgrade (Formalization) Msogwaba; Kanyamazane, Matsulu, Tekwane South, Zwelisha; Tshabalala
3 X Precinct Plans: Tshabalala; Matsulu/ Kaapmuiden, White River,
Hillsview
Tshabalala; Matsulu/ Kaapmuiden and White River

doc_315636060.pdf
 

Attachments

Back
Top