abhishreshthaa
Abhijeet S
1) FOR WORKERS: The personnel department collects information from the Production Department and then divide the workers as Skilled/Semi-Skilled and Unskilled. A record is maintained which includes necessary information like Name, Age, Qualification, Working Experience, Family Background and Performance review of the workers. The workers are trained as per a training schedule with emphasis on the following key aspects
a) Training on GMP.
b) Training in operation of equipments.
c) Training in routine functioning.
d) General discipline.
5 Brief description of water systems (Schematized drowning of the systems are desirable) including sanitation. Water supplied is from Municipal corporation and pure, free from pathogenic micro-organisms. Testing is also done to ensure that water is free from pathogens .This water is also fed to D.M.plant for De-ionisation, which in turn is used for manufacturing purposes having SS316 pipe line with facility of loop system for continuous water circulation provided with on line 10 micron filter and UV light. (A Schematic diagram is given below.) Waste water and other residues which are not hazardous to public health are disposed off after treatment by ETP Plant through the underground drainage system provide for the same.
a) Training on GMP.
b) Training in operation of equipments.
c) Training in routine functioning.
d) General discipline.
5 Brief description of water systems (Schematized drowning of the systems are desirable) including sanitation. Water supplied is from Municipal corporation and pure, free from pathogenic micro-organisms. Testing is also done to ensure that water is free from pathogens .This water is also fed to D.M.plant for De-ionisation, which in turn is used for manufacturing purposes having SS316 pipe line with facility of loop system for continuous water circulation provided with on line 10 micron filter and UV light. (A Schematic diagram is given below.) Waste water and other residues which are not hazardous to public health are disposed off after treatment by ETP Plant through the underground drainage system provide for the same.