This is my Plan to renew the warehouse I just took control of.
Project 2011 Warehouse Renewal Plan
PROJECT # 1.0 2.0 3.0 PROJECT DESCRIPTION Incoming Goods Inwards Goods Sampling Of Raw Materials PAGE # 2 2 3 PROJECT STATUS In Progress 1.1 Completed In Progress 2.1 Completed In Progress 3.1 Completed 3.2 Completed In Progress 4.1 In Progress 4.2 Completed In Progress 5.1 Completed 5.2 Completed In Progress 6.1 Completed 6.2 Completed In Progress 7.1 Completed On Hold 8.1 Completed Project Completed In Progress 10.1 Completed 10.2 Completed On Hold 11.1 On Hold 11.2 In Progress
4.0
Sampling Room Improvements
3
5.0
Quarantine Zone Movements
4
6.0
Picking For Production
5
7.0 8.0 9.0 10.0
Picking For Despatch Finished Goods Area Clipboard For ‘PASSED’ Labels Forklift Safety And Warehouse OHS
5 6 6 7
11.0
Warehouse Improvements
7
61720391.doc
Page 1 of 9
INCOMING GOODS AND INWARDS GOODS Proposed Completion Date – 31/05/2011 Goods that are unloaded are to be verified and checked by staff Goods are unloaded off incoming trucks and moved into Inwards Goods Area. (Separate Inwards Goods Into Raw Materials, Shippers and Plastics). 1.1 – Completion Date – 15/04/2011? New procedure to be introduced for separation of Raw Materials. 1.2 – Completion Date – 31/05/2011? Train Staff in new procedure. 1.3 – Completion Date – 1/07/2011 Review Project - Monitor and Report on project. Incoming Goods project will ensure all goods are verified and recorded accurately against paperwork. Incoming Goods will be located in appropriate separated areas. Proposed Completion Date – 31/05/2011 Inwards Goods are separated in Inwards Goods area and are received by Warehouse Administrator into warehouse locations. QZR for Raw Materials. (Materials Required By Manufacturing). QZP for Packaging Materials. (Bottles, Caps, Pumps, Shippers, Cartons, etc). QZL for Labels (Production Labels, Seals, etc). 2.1 – Completion Date – 15/04/2011? Warehouse locations and Quarantine Zone need to be created. QZR , QZP , QZL 2.2 – Completion Date – 31/05/2011? Implement and create new or update current procedure for processing of Inwards Goods. 2.3 – Completion Date – 31/05/2011? Train staff in new procedure. 2.4 – Completion Date – 1/07/2011 Review Project - Monitor and Report on project. Inwards Goods project will ensure that goods are easily available for sampling and testing. This will also aid in stock checks as all materials in warehouse will be located correctly and accurately. 2.0 INWARDS GOODS 1.0 INCOMING GOODS
61720391.doc
Page 2 of 9
QUARANTINE ZONE AND SAMPLING ROOM IMPROVEMENTS Proposed Completion Date – 31/05/2011 When Samples of Raw Materials have been taken, the Raw Materials are then located into Quarantine Zones. QZ01A to QZ01E , QZ02A to QZ02E QZ03A to QZ03E , QZ04A to QZ04E QZ05A to QZ05E , QZ06A to QZ06E QZ07A to QZ07E , QZ08A to QZ08E 3.1 – Completion Date – 15/04/2011? Quarantine Zone to be allocated in warehouse and locations (QZ011 to QZ085), to be created on WINMAGI system. 3.2 – Completion Date – 31/05/2011? Implement and create new or update current procedure for processing of Sampled Materials. 3.3 – Completion Date – 31/05/2011? Train staff in new procedure. 3.4 – Completion Date – 1/07/2011 Review Project - Monitor and Report on project. Creating Quarantine Zones allows staff to have a better view of the raw materials waiting for a ‘PASSED’ status. This will also aid in determining the length of time that raw materials sit waiting for the ‘PASSED’ status to be given. Proposed Completion Date – 31/05/2011 Sampling Room needs new tools to improve staff safety. (Right Tool For The Right Job). Sampling Room staff needs better PPE. - Better Breathing Mask. - Better Lighting. - Lighting On Separate Switch. Sampling Room venting needs attention to improve the positive pressure. 4.1 – Completion Date – 15/05/2011 Tools for Sampling Room to be investigated and purchased. 4.2 – Completion Date – 15/04/2011? Breathing Mask to be purchased. 4.3 – Completion Date – TBA Lighting switches to be installed. 4.4 – Completion Date – TBA Log Book to be created to log cleaning in between sampling as per TGA Audit. 4.5 – Completion Date – 30/06/2011 Implement and create new or update current procedure for processing of Sampled Materials. 4.6 – Completion Date – 30/06/2011 Train staff in procedure. 4.7 – Completion Date – 1/07/2011 Review Project - Monitor and Report on Project. Sampling Room will be brought up to a safe work standard with the completion of this project.
61720391.doc Page 3 of 9
3.0 QUARANTINE ZONE 4.0 SAMPLING ROOM IMPROVMENTS
61720391.doc
Page 4 of 9
QUARANTINE ZONES Proposed Completion Date – 31/05/2011 Once Raw Materials have been sampled for testing the Raw Material is then located in a Quarantine Zone until ‘PASSED’ status has been given. When ‘PASSED’ Status has been given the Raw Material is then located into the warehouse and recorded in WINMAGI system. 5.1 – Completion Date – 15/04/2011? Quarantine Zone to be allocated in warehouse and locations clearly labelled. 5.2 – Completion Date – 15/04/2011? Implement and create new or update current procedure for processing of Inwards Goods. 5.3 – Completion Date – 31/05/2011? Train staff in new procedure. 5.4 – Completion Date – 01/07/2011 Review Project - Monitor and Report on Project. Quarantine Zone will keep ‘NOT PASSED’ and ‘PASSED’ Materials separated and allocated to separate locations. This will also aid in determining the length of time that raw materials sit waiting for the ‘PASSED’ status to be given.
61720391.doc
5.0 QUARANTINE ZONE (POST SAMPLE)
Page 5 of 9
PICKING PROCEDURES Proposed Completion Date – 31/05/2011 Production pick slips to be placed in labelled trays. (i.e. Monday tray will have Tuesday’s production pick slips). All picked Materials will be picked then moved into Production Line Holding Bays. 6.1 – Completion Date – 15/04/2011? Pick slip trays to be created and labelled. 6.2 – Completion Date – 15/04/2011? Production Line holding bays to be created in Production area. 6.3 – Completion Date – 31/05/2011 Implement and create new or update current procedure for picking materials. 6.4 – Completion Date – 31/05/2011 Train staff in new procedure. 6.5 – Completion Date – 01/07/2011 Review Project - Monitor and Report on Project. This project will speed up the picking process. Project will also help to limit the amount of foot traffic in warehouse area and will benefit the Production Team by having all the required material close to the Production Area. Proposed Completion Date – 31/05/2011 All ‘RELEASED FOR SUPPLY’ labels will be applied to pallets of Finished Goods. ‘RELEASE FOR SUPPLY’ labels will be applied to Finished Goods at time of issue from QA Department. 7.1 – Completion Date – 01/04/2011? Outstanding ‘RELEASE FOR SUPPLY’ labels to be applied to Finished Goods. 7.2 – Completion Date – 31/05/2011 Implement and create new or update current procedure for Finished Goods. 7.3 – Completion Date – 31/05/2011 Train staff in new procedure. 7.4 – Completion Date – 01/07/2011 Review Project - Monitor and Report on Project.
61720391.doc
6.0 PICKING FOR PRODUCTION 7.0 PICKING FOR DESPATCH / ‘RELEASED FOR SUPPLY’
This project will make sure that all Finished Goods have ‘RELEASED FOR SUPPLY’ labels are applied to goods at the time of issue from the QA Department.
Page 6 of 9
WAREHOUSE HOUSKEEPING Proposed Completion Date – 31/05/2011 Pallets of Packaging in this area are taking up space required for Finished Goods. 8.1 – Completion Date – 18/03/2011? Calculate quantity of NON Finished Goods pallets in area. Pallet Count – 130+ 8.2 – Completion Date – TBA Start moving pallets out of Temp. Control Room. 8.3 – Completion Date – 31/05/2011 Retrain staff in SOP. 8.4 – Completion Date – 01/07/2011 Review Project - Monitor and Report on Project. All pallets of Packaging and pallets of Non Finished Goods will be removed from this area and re-located into other warehouse locations, this will allow more Finished Goods to be stored where they are meant to be. Proposed Completion Date – TBA Idea proposed we have a board with clips on it for all ‘PASSED’ Labels and ‘RELEASED FOR SUPPLY’ labels. 9.1 – Completion Date – TBA? Evaluate costs for board and clips. 9.2 – Completion Date – TBA? Secure board in either warehouse office or just outside of Inwards Goods Door. 9.3 – Completion Date – TBA? Implement and create new or update current procedure for Warehouse OHS. 9.4 – Completion Date – TBA? Train staff in new OHS procedure. 9.5 – Completion Date – TBA? Review Project - Monitor and Report on Project.
61720391.doc
8.0 FINISHED GOODS AREA 9.0 CLIPBOARD FOR LABELS
Page 7 of 9
WAREHOUSE OPERATIONS Proposed Completion Date – 31/05/2011 Forklift Safety needs to be addressed to all company employees. Forklift Safety Rules need to be created and all employees trained in rules and policy. Forklift Daily Checklist to be created. Warehouse OHS need to be addressed. - No Pallets or Pallet Trolleys to be left in walk ways or aisles. - No Riding Pallet Trolleys. - Horns to be used when crossing walkways or doorways. 10.1 – Completion Date – 25/03/2011? Forklift Daily Checklist to be created and all forklift drivers trained in procedure. 10.2 – Completion Date – 15/04/2011? Asses risks in warehouse and surrounding areas. 10.3 – Completion Date – 31/05/2011 Implement and create new or update current procedure for Warehouse OHS. 10.4 – Completion Date – 31/05/2011 Train staff in new OHS procedure. 10.5 – Completion Date – 01/07/2011 Review Project - Monitor and Report on Project. This project will make sure that the warehouse is aware and undertaking action in regards to the safety of all employees.
61720391.doc
10.0 FORKLIFT SAFETY AND WAREHOUSE OHS
Page 8 of 9
Proposed Completion Date – TBA Net book And Wireless Networking 11.1 – Completion Date – TBA Evaluate cost for purchasing equipment and setup. 11.2 – Completion Date – TBA Trial System and evaluate efficiency increase/decrease. 11.3 – Completion Date – TBA Report and SOP creation. 11.4 – Completion Date – TBA Train staff in new OHS procedure. 11.5 – Completion Date – TBA Review Project - Monitor and Report on Project. By using laptops or net books on a wireless network in the warehouse this will enable the employees to locate raw materials ‘live’ on the system and will prevent any misplacement of location sheets and lengthy delays in data entry.
61720391.doc
11.0 WAREHOUSE IMPROVEMENTS
Page 9 of 9
doc_165030100.doc
This is my Plan to renew the warehouse I just took control of.
Project 2011 Warehouse Renewal Plan
PROJECT # 1.0 2.0 3.0 PROJECT DESCRIPTION Incoming Goods Inwards Goods Sampling Of Raw Materials PAGE # 2 2 3 PROJECT STATUS In Progress 1.1 Completed In Progress 2.1 Completed In Progress 3.1 Completed 3.2 Completed In Progress 4.1 In Progress 4.2 Completed In Progress 5.1 Completed 5.2 Completed In Progress 6.1 Completed 6.2 Completed In Progress 7.1 Completed On Hold 8.1 Completed Project Completed In Progress 10.1 Completed 10.2 Completed On Hold 11.1 On Hold 11.2 In Progress
4.0
Sampling Room Improvements
3
5.0
Quarantine Zone Movements
4
6.0
Picking For Production
5
7.0 8.0 9.0 10.0
Picking For Despatch Finished Goods Area Clipboard For ‘PASSED’ Labels Forklift Safety And Warehouse OHS
5 6 6 7
11.0
Warehouse Improvements
7
61720391.doc
Page 1 of 9
INCOMING GOODS AND INWARDS GOODS Proposed Completion Date – 31/05/2011 Goods that are unloaded are to be verified and checked by staff Goods are unloaded off incoming trucks and moved into Inwards Goods Area. (Separate Inwards Goods Into Raw Materials, Shippers and Plastics). 1.1 – Completion Date – 15/04/2011? New procedure to be introduced for separation of Raw Materials. 1.2 – Completion Date – 31/05/2011? Train Staff in new procedure. 1.3 – Completion Date – 1/07/2011 Review Project - Monitor and Report on project. Incoming Goods project will ensure all goods are verified and recorded accurately against paperwork. Incoming Goods will be located in appropriate separated areas. Proposed Completion Date – 31/05/2011 Inwards Goods are separated in Inwards Goods area and are received by Warehouse Administrator into warehouse locations. QZR for Raw Materials. (Materials Required By Manufacturing). QZP for Packaging Materials. (Bottles, Caps, Pumps, Shippers, Cartons, etc). QZL for Labels (Production Labels, Seals, etc). 2.1 – Completion Date – 15/04/2011? Warehouse locations and Quarantine Zone need to be created. QZR , QZP , QZL 2.2 – Completion Date – 31/05/2011? Implement and create new or update current procedure for processing of Inwards Goods. 2.3 – Completion Date – 31/05/2011? Train staff in new procedure. 2.4 – Completion Date – 1/07/2011 Review Project - Monitor and Report on project. Inwards Goods project will ensure that goods are easily available for sampling and testing. This will also aid in stock checks as all materials in warehouse will be located correctly and accurately. 2.0 INWARDS GOODS 1.0 INCOMING GOODS
61720391.doc
Page 2 of 9
QUARANTINE ZONE AND SAMPLING ROOM IMPROVEMENTS Proposed Completion Date – 31/05/2011 When Samples of Raw Materials have been taken, the Raw Materials are then located into Quarantine Zones. QZ01A to QZ01E , QZ02A to QZ02E QZ03A to QZ03E , QZ04A to QZ04E QZ05A to QZ05E , QZ06A to QZ06E QZ07A to QZ07E , QZ08A to QZ08E 3.1 – Completion Date – 15/04/2011? Quarantine Zone to be allocated in warehouse and locations (QZ011 to QZ085), to be created on WINMAGI system. 3.2 – Completion Date – 31/05/2011? Implement and create new or update current procedure for processing of Sampled Materials. 3.3 – Completion Date – 31/05/2011? Train staff in new procedure. 3.4 – Completion Date – 1/07/2011 Review Project - Monitor and Report on project. Creating Quarantine Zones allows staff to have a better view of the raw materials waiting for a ‘PASSED’ status. This will also aid in determining the length of time that raw materials sit waiting for the ‘PASSED’ status to be given. Proposed Completion Date – 31/05/2011 Sampling Room needs new tools to improve staff safety. (Right Tool For The Right Job). Sampling Room staff needs better PPE. - Better Breathing Mask. - Better Lighting. - Lighting On Separate Switch. Sampling Room venting needs attention to improve the positive pressure. 4.1 – Completion Date – 15/05/2011 Tools for Sampling Room to be investigated and purchased. 4.2 – Completion Date – 15/04/2011? Breathing Mask to be purchased. 4.3 – Completion Date – TBA Lighting switches to be installed. 4.4 – Completion Date – TBA Log Book to be created to log cleaning in between sampling as per TGA Audit. 4.5 – Completion Date – 30/06/2011 Implement and create new or update current procedure for processing of Sampled Materials. 4.6 – Completion Date – 30/06/2011 Train staff in procedure. 4.7 – Completion Date – 1/07/2011 Review Project - Monitor and Report on Project. Sampling Room will be brought up to a safe work standard with the completion of this project.
61720391.doc Page 3 of 9
3.0 QUARANTINE ZONE 4.0 SAMPLING ROOM IMPROVMENTS
61720391.doc
Page 4 of 9
QUARANTINE ZONES Proposed Completion Date – 31/05/2011 Once Raw Materials have been sampled for testing the Raw Material is then located in a Quarantine Zone until ‘PASSED’ status has been given. When ‘PASSED’ Status has been given the Raw Material is then located into the warehouse and recorded in WINMAGI system. 5.1 – Completion Date – 15/04/2011? Quarantine Zone to be allocated in warehouse and locations clearly labelled. 5.2 – Completion Date – 15/04/2011? Implement and create new or update current procedure for processing of Inwards Goods. 5.3 – Completion Date – 31/05/2011? Train staff in new procedure. 5.4 – Completion Date – 01/07/2011 Review Project - Monitor and Report on Project. Quarantine Zone will keep ‘NOT PASSED’ and ‘PASSED’ Materials separated and allocated to separate locations. This will also aid in determining the length of time that raw materials sit waiting for the ‘PASSED’ status to be given.
61720391.doc
5.0 QUARANTINE ZONE (POST SAMPLE)
Page 5 of 9
PICKING PROCEDURES Proposed Completion Date – 31/05/2011 Production pick slips to be placed in labelled trays. (i.e. Monday tray will have Tuesday’s production pick slips). All picked Materials will be picked then moved into Production Line Holding Bays. 6.1 – Completion Date – 15/04/2011? Pick slip trays to be created and labelled. 6.2 – Completion Date – 15/04/2011? Production Line holding bays to be created in Production area. 6.3 – Completion Date – 31/05/2011 Implement and create new or update current procedure for picking materials. 6.4 – Completion Date – 31/05/2011 Train staff in new procedure. 6.5 – Completion Date – 01/07/2011 Review Project - Monitor and Report on Project. This project will speed up the picking process. Project will also help to limit the amount of foot traffic in warehouse area and will benefit the Production Team by having all the required material close to the Production Area. Proposed Completion Date – 31/05/2011 All ‘RELEASED FOR SUPPLY’ labels will be applied to pallets of Finished Goods. ‘RELEASE FOR SUPPLY’ labels will be applied to Finished Goods at time of issue from QA Department. 7.1 – Completion Date – 01/04/2011? Outstanding ‘RELEASE FOR SUPPLY’ labels to be applied to Finished Goods. 7.2 – Completion Date – 31/05/2011 Implement and create new or update current procedure for Finished Goods. 7.3 – Completion Date – 31/05/2011 Train staff in new procedure. 7.4 – Completion Date – 01/07/2011 Review Project - Monitor and Report on Project.
61720391.doc
6.0 PICKING FOR PRODUCTION 7.0 PICKING FOR DESPATCH / ‘RELEASED FOR SUPPLY’
This project will make sure that all Finished Goods have ‘RELEASED FOR SUPPLY’ labels are applied to goods at the time of issue from the QA Department.
Page 6 of 9
WAREHOUSE HOUSKEEPING Proposed Completion Date – 31/05/2011 Pallets of Packaging in this area are taking up space required for Finished Goods. 8.1 – Completion Date – 18/03/2011? Calculate quantity of NON Finished Goods pallets in area. Pallet Count – 130+ 8.2 – Completion Date – TBA Start moving pallets out of Temp. Control Room. 8.3 – Completion Date – 31/05/2011 Retrain staff in SOP. 8.4 – Completion Date – 01/07/2011 Review Project - Monitor and Report on Project. All pallets of Packaging and pallets of Non Finished Goods will be removed from this area and re-located into other warehouse locations, this will allow more Finished Goods to be stored where they are meant to be. Proposed Completion Date – TBA Idea proposed we have a board with clips on it for all ‘PASSED’ Labels and ‘RELEASED FOR SUPPLY’ labels. 9.1 – Completion Date – TBA? Evaluate costs for board and clips. 9.2 – Completion Date – TBA? Secure board in either warehouse office or just outside of Inwards Goods Door. 9.3 – Completion Date – TBA? Implement and create new or update current procedure for Warehouse OHS. 9.4 – Completion Date – TBA? Train staff in new OHS procedure. 9.5 – Completion Date – TBA? Review Project - Monitor and Report on Project.
61720391.doc
8.0 FINISHED GOODS AREA 9.0 CLIPBOARD FOR LABELS
Page 7 of 9
WAREHOUSE OPERATIONS Proposed Completion Date – 31/05/2011 Forklift Safety needs to be addressed to all company employees. Forklift Safety Rules need to be created and all employees trained in rules and policy. Forklift Daily Checklist to be created. Warehouse OHS need to be addressed. - No Pallets or Pallet Trolleys to be left in walk ways or aisles. - No Riding Pallet Trolleys. - Horns to be used when crossing walkways or doorways. 10.1 – Completion Date – 25/03/2011? Forklift Daily Checklist to be created and all forklift drivers trained in procedure. 10.2 – Completion Date – 15/04/2011? Asses risks in warehouse and surrounding areas. 10.3 – Completion Date – 31/05/2011 Implement and create new or update current procedure for Warehouse OHS. 10.4 – Completion Date – 31/05/2011 Train staff in new OHS procedure. 10.5 – Completion Date – 01/07/2011 Review Project - Monitor and Report on Project. This project will make sure that the warehouse is aware and undertaking action in regards to the safety of all employees.
61720391.doc
10.0 FORKLIFT SAFETY AND WAREHOUSE OHS
Page 8 of 9
Proposed Completion Date – TBA Net book And Wireless Networking 11.1 – Completion Date – TBA Evaluate cost for purchasing equipment and setup. 11.2 – Completion Date – TBA Trial System and evaluate efficiency increase/decrease. 11.3 – Completion Date – TBA Report and SOP creation. 11.4 – Completion Date – TBA Train staff in new OHS procedure. 11.5 – Completion Date – TBA Review Project - Monitor and Report on Project. By using laptops or net books on a wireless network in the warehouse this will enable the employees to locate raw materials ‘live’ on the system and will prevent any misplacement of location sheets and lengthy delays in data entry.
61720391.doc
11.0 WAREHOUSE IMPROVEMENTS
Page 9 of 9