Mission Success Starts With Safety

Risk Management Tools
Langley Research Center May 2, 2000

Michael A. Greenfield Deputy Associate Administrator Office of Safety and Mission Assurance
1

Mission Success Starts With Safety

Recent Reviews Focusing on NASA Failures

Mars Climate Orbiter Mishap Investigation (MCO) • Chair: Art Stephenson/MSFC – NASA FBC (Faster, Better, Cheaper) Task (FBC) • Chair: Tony Spears – Shuttle Independent Assessment (SIA) • Chair: Dr. Henry McDonald – Mars Program Independent Assessment (MPIA) • Chair: Tom Young


2

Mission Success Starts With Safety

Recommendations: Risk Management Deficiencies
? ? ? ?

? ?

Overall there are about 175 recommendations Most addressed issues applicable throughout the Agency, at all Centers and all Projects! Findings were grouped into 4 large areas: People, Process, Process Execution, Advanced Tools and Techniques Risk and Risk Management issues represent a continuing theme • Weakness in Risk Identification and Analysis • Poor Risk Mitigation and Tracking • Lack of strong Systems Engineering • Limited application of Risk Assessment tools NASA has formed an Integrated Action Team (NIAT) to develop suitable plans to correct the deficiencies Briefing to NASA Chief Engineer on June 15.
3

Mission Success Starts With Safety

Outline
• • • • •

Continuous Risk Management Process NASA Risk Management Requirements Fault Tree Analysis (FTA) Failure Mode And Effect Analysis (FMEA) Probabilistic Risk Assessment (PRA)

4

Mission Success Starts With Safety

Continuous Risk Management Process


Risk management is a continuous process which: • Identifies risk
• • • •

Analyzes risk and its impact, and prioritizes risk Develops and implements risk mitigation or acceptance Tracks risks and risk mitigation implementation plans Assures risk information is communicated to all project/program levels Developed during the program/project formulation phase Included in the program/project plans Executed/maintained during the implementation phase Program/project manager has the overall responsibility for the Implementation of risk management, ensuring an integrated, coherent risk management approach throughout the project



Risk management planning
• • •



Risk management responsibility


5

Mission Success Starts With Safety

NASA Risk Management Requirements


NPG 7120.5, NASA Program and Project Management Processes and Requirements


The program or project manager shall apply risk management principles as a decision-making tool which enables programmatic and technical success Program and project decisions shall be made on the basis of an orderly risk management effort Risk management includes identification, assessment, mitigation, and disposition of risk throughout the PAPAC (Provide Aerospace Products And Capabilities) process







NPG 8705.x (draft), Risk Management Procedures and Guidelines


Provides additional information for applying risk management as required by NPG 7120.5

6

Mission Success Starts With Safety

Risk Management Process
Program / Project constraints IDENTIFY Identify risk issues and concerns Statements of risk List of risks

Risk data: test data, expert opinion, hazard analysis, FMEA, FTA, PRA, lessons learned, technical analysis

ANALYZE Evaluate (impact/severity, probability, time frame), classify, and prioritize risks

Risk evaluation Risk classification Risk prioritization

Resources

PLAN Decide what, if anything, should be done about risks

Risk mitigation plans Risk acceptance rationale Risk tracking requirements

Program/project data (metrics information)

TRACK Monitor risk metrics and verify/validate mitigation actions

Risk status reports on: — Risks — Risk mitigation plans

Note: Communication and documentation extend throughout all of the functions.

CONTROL Replan mitigations, close risks, invoke contingency plans, or track risks

Risk decisions 7

Mission Success Starts With Safety

NASA Risk Management Requirements


NPG 8715.3, NASA Safety Manual • Purpose of risk assessment is to identify and evaluate risks to support decision-making regarding actions to ensure safety and mission assurance


Risk assessment analyses should use the simplest methods that adequately characterize the probability and severity of undesired events Qualitative methods that characterize hazards and failure modes and effects should be used first Quantitative methods are to be used when qualitative methods do not provide an adequate understanding of failures, consequences, and events System safety analysis must include early interaction with project engineering, integration, and operations functions to ensure all hazards are identified The hazard assessment process is a principle factor in the understanding and management of technical risk As part of the responsibility for overall risk management, the program/project manager must ensure that system safety analyses, appropriate to the program/project complexity, have been conducted
8











Mission Success Starts With Safety

NASA Risk Management Requirements


NSTS 22206, instructions for preparation of FMEA and CIL [for Space Shuttle] • System and performance requirements are defined
• • •

Analysis assumptions and groundrules are specified Block diagrams (functional or reliability) are developed Analysis worksheets which include identification of every failure mode are developed (the effects documented address the worst case.) Corrective actions and design improvements are evaluated and recommended Analysis is summarized in report form



• •

SSP 30234, instructions for preparation of FMEA and CIL [for Space Station] • FMEA process, requirements, rules, reporting requirements are described
• •

CIL process, requirements, rules, reporting requirements are described Ground support equipment FMEA and CIL processes, requirements, approvals, and databases are described

9

Mission Success Starts With Safety

Risk Management Tools
?

NASA has been traditionally using one Risk Assessment and Risk Management (RA/RM) tool for some time: Failure Modes and Effects Analysis (FMEA) ? NASA has also selectively used another important RA/RM tool: Fault Tree Analysis (FTA) ? Additionally, NASA has been broadening its repertoire of RA/RM tools and has begun to systematically use a more comprehensive set of tools collectively called Probabilistic Risk Assessment (PRA) ? PRA is a systematic, logical, and comprehensive discipline that uses tools like FMEA, FTA, Event Tree Analysis (ETA), Event Sequence Diagrams (ESD), Master Logic Diagrams (MLD), Reliability Block Diagrams (RBD), etc., to quantify risk.
10

Mission Success Starts With Safety

Risk Management Tools

An Introduction (to whet your appetite)

11

Mission Success Starts With Safety

Design/Develop a Car for the Interstate 64 Commute
?

Start with requirements analysis • Must be safe • Must provide seating for two persons to allow HOV option • High price of fuel dictates need for high gas mileage • High reliability to protect against being stranded • And of course must be stylish Apply a disciplined risk management process to uncover risks and develop risk mitigation strategies across the product lifecycle

?

12

Mission Success Starts With Safety

Fault Tree Analysis


Background


FTA is a deductive analytical technique of reliability and safety analyses and generally is used for complex dynamic systems FTA provides an objective basis for analysis and justification for changes and additions First developed by Bell Telephone in 1961 then modified by Boeing for wide uses





13

Mission Success Starts With Safety

Fault Tree Analysis


Concept


A model that logically and graphically represents the various combinations of possible events, both faulty and normal, occurring in a system that leads to the top undesired event, e.g., electrical fire in heater box. FTA uses a tree to show the cause-and-effect relationships between a single, undesired event (failure) and the various contributing causes The tree shows the logical branches from a single failure at the top of the tree to the root cause(s) at the bottom of the tree Standard logic symbols connect the branches of the tree. For example, “gates” permit or inhibit the passage of fault logic up the tree through the “events.” Fault tree does not necessarily contain all possible failure modes of the components of the system. Fault tree contains only those failure modes whose existence contribute to the existence of the top event.









14

FTA Provides a Top-Down View to Identify Risks and Car disabled Possible Mitigation on the
interstate

OR

Engine stops and will not re-start

Insufficient power to wheels

Tire out of rolling configuration

Car cannot be steered

Brake failure

Car catches fire

AND

Tire lacks adequate inflation

Spare tire unavailable

OR

OR

Blowout road damage

Blowout due to wear

Spare tire is flat

Spare tire is missing

Cannot install spare tire

15

Mission Success Starts With Safety

Failure Mode and Effect Analysis


FMEA is an inductive engineering technique used at the component level to define, identify, and eliminate known and/or potential failures, problems, and errors from the system, design, process, and/or service before they reach the customer. (Also see MIL-STD-1629) FMEA is an early warning or preventative technique that is methodical
• •



Systematic method of examining all ways which a failure can occur For each failure, an estimate is made of:
• • • •

Effect on total system Occurrence Severity Detection



Bottoms-up analysis based on historical or inferential data at component level



FMEA will identify corrections required to prevent failures

16

Mission Success Starts With Safety

Failure Mode and Effect Analysis


Example “For want of a nail, the shoe was lost; For want of a shoe, the horse was lost; For want of a horse, the rider was lost; For want of a rider, the battle was lost; For want of a battle, the kingdom was lost!”

How would you control the loss of a nail? Is there more you can do?

17

FMECA- A Bottoms-Up View to Design, Manufacture, Operations
Tire FMECA w ith Reeva luat ion of Ris ks
Part Name/ Potential Failure Part Modes Num ber Cord Causes (failure mechanism) Risk Priority Rating Effects Sev* Freq Det RPN Ply failure 4 3 8 96 Recommended Corrective Action Imp roved Rating Sev* Freq Det RPN 1 8 3

Fiber 1. Weak separation precursor material 2. Handlin g damage

Incom ing inspection 4

Ply failure

4 4

3 2

8 8

96 64

Increase process 4 controls during mfg Monitor tire life 4

2 2

2 2

16 16

3. Cumulative Ply failure fatigue

Ply

Delamination

1. Dirt or grease 2. Twisted plys 3. Poor bond pressu re

Loss of side wall in tegrity Loss of side wall in tegrity Loss of side wall in tegrity Veh icle loss

7

3

8

168 Toluene wipe down 7 during layup 84 Automatic ply alignment 144 Redundant tensioning system 162 Planned p eriodic maintenance 162 Driver training 7 7

1

1

7

7 7

2 2

6 8

1 1

1 1

7 7

Carcass Disintegration

1. Poor tire alig nment 2. Tire hits curb

9

2

9

9

1

1

9

Veh icle loss

9

2

9

9

1

1

9

*Severity ratin gs 8 to 10 request special effort in design improvement reg ardless of RPN ratin g

18

Mission Success Starts With Safety

Probabilistic Risk Assessment


What is PRA?


It is an analysis of the probability (or frequency) of occurrence of a consequence of interest, and the magnitude of that consequence, including assessment and display of uncertainties It is an engineering process, based on comprehensive systems analysis with analytical support, repeated periodically as the design matures and new data become available It is a means to express quantitatively our state of knowledge about the risk of failure It does not guess failure rates, or otherwise create data







19

Mission Success Starts With Safety

Probabilistic Risk Assessment
?

What is PRA used for in NASA programs? • For strategic decision support; e.g., What is the probability of successfully assembling the multi-billion dollar International Space Station?


For systems under development, to guide trade-offs between safety, reliability, cost, performance, and other tradable resources For mature systems, to support decision-making on risk acceptability, and (when risk is considered to be too high) on choices among options for risk reduction; e.g., Space Shuttle upgrades To track risk levels:
• •





Throughout the life cycle To measure effectiveness of risk reduction options
20

Mission Success Starts With Safety

Probabilistic Risk Assessment Helps Prioritize Risk Scenarios
• Master Logic Diagrams
• To identify initiating events • Event Trees or Event Sequence Diagram • To construct accident scenarios from initiating events to end states • Fault Trees • To quantify initiating and mitigating events
21

PRA Supports Design Decisions
Ordinary tire stays inflated Changing tools are OK Spare tire is OK END STATES (S=success; F=failure)

Tire rolls over road hazard

S=0.05

0.05 0.95
S=0.40

S=52%
0.8 0.2 0.6 0.4
F=0.30

F=48%
F=0.19
Spare tire is OK

Run-flat Tire Stays Inflated

Changing tools are OK

Tire rolls over road hazard

S=0.90

0.9 0.1
S=0.05

S=96.5% F=3.5%
22

0.8 0.2

0.6 0.4

F=0.03 F=0.02

Another Risk - A Dead Battery
Battery Dead
(1 X 10-3) OR

Lights Left On
(7 X 10-4)

Batt. End of Life
(2.8 X 10-4)

Elec. Short

(0.2 X 10-4)
23

PRA Can Provide Quantitative Values for Failure and Facilitate Ranking of Risk Drivers
Jumper Cables Available Batt. Dead (1 X 10-3)* Donor Batt. OK Batt. Terminals OK

0.1

0.5

0.8

Can recover (4 X 10-5) Stuck (1 X 10-5)

0.2 Stuck (5 X 10-5) 0.5 Stuck (90 X 10-5) 0.9

* Probabilities expressed in terms of a single automobile use.
24

Space Shuttle Program Development Office
Block IIA Configuration - Ascent

*

* Based on 1998 QRAS

25

Space Shuttle Program Development Office
Reliability Sensitivities Analysis - Space Shuttle Ascent

Shuttle Element
SSME

Current Reliability **
Element 1.0x10-03* 1/1000 7.6x10-04 1/1312 1.8x10-04 1/5682 1.4x10-04 1/7246 4.8x10-05 1/20,619 Shuttle

What ifs ?
Element Risk is Cut in 1/2 Element Shuttle 5.0x10-4 1/2000 3.8x10-4 1/2624 1/560 Element Reliability is Perfect Shuttle 1/779

SRB

1/525

1/657

RSRM

1/438

8.8x10-5 1/11,364 6.5x10-5 1/4,492 2.4x10-5 1/41,238

1/455

1/474

ET

1/451

1/466

Orbiter

1/441

1/447

* Based on SSME Block IIA Configuration ** Based on 1998 QRAS

26

Mission Success Starts With Safety

The SMA Community is Ready to Help
?

Risk Management tools and techniques continues to be a major thrust within OSMA ? We have enhanced our ability to support Quantitative Risk Assessment ? A recognized expert, Dr. Michael Stamatelatos, has joined our staff to support this effort (202-358-1668) ? Contact Bert Garrido, LaRC SMA Director, X4-3361 or Dr. Peter Rutledge (202-358-0579) or Michael to help you in tool application

27