A study on oracle EBS implementation at Titan industries- jewellery division, Hosur.
1. Introduction a. Company b. Oracle EBS suite 2. Back ground for implementation a. process before b. Draw back of old process c. Project plan for new system d. Areas focussed for implementation 3. AIM- Application Implementation Methodology a. System design b. Project management c. Business process redesign -strategy used -operation analysis -solution design & build -document and training -transition 4. scope of implementation a. functional scope b. technical scope c. modules implemented 5. detailed study about modules/ 6. critical success factors 7.benifts achieved.
8. issus/ problems faced during implementation -various impacts on business -challenges faced during implementation -solutions framed 9.current analysis on omplementation 10. future road map - currently implementing oracle ebs release 2
Questionnaire: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Name Designation Module working Is ur work been simplified after implementation of Oracle EBS? A. yes B. no The level of satisfaction with the product a.very gud b.good c.average d.poor Hw is the product customization? A. simple b. complex Is the training provided on product is effective?a. yes b. no Do u think , has the productivity increased? A.yes b. no The level of decision making possible Do you think is there any need for extension of the product?a. yes b. no If yes, which specialized area to be covered---------------------How s the support level provided by oracle team a. Highly satisfied b. Satisfied c. Not satisfied d. Need more improvement
Sir I would frame it more properly after all improvements.
doc_362651022.docx
1. Introduction a. Company b. Oracle EBS suite 2. Back ground for implementation a. process before b. Draw back of old process c. Project plan for new system d. Areas focussed for implementation 3. AIM- Application Implementation Methodology a. System design b. Project management c. Business process redesign -strategy used -operation analysis -solution design & build -document and training -transition 4. scope of implementation a. functional scope b. technical scope c. modules implemented 5. detailed study about modules/ 6. critical success factors 7.benifts achieved.
8. issus/ problems faced during implementation -various impacts on business -challenges faced during implementation -solutions framed 9.current analysis on omplementation 10. future road map - currently implementing oracle ebs release 2
Questionnaire: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Name Designation Module working Is ur work been simplified after implementation of Oracle EBS? A. yes B. no The level of satisfaction with the product a.very gud b.good c.average d.poor Hw is the product customization? A. simple b. complex Is the training provided on product is effective?a. yes b. no Do u think , has the productivity increased? A.yes b. no The level of decision making possible Do you think is there any need for extension of the product?a. yes b. no If yes, which specialized area to be covered---------------------How s the support level provided by oracle team a. Highly satisfied b. Satisfied c. Not satisfied d. Need more improvement
Sir I would frame it more properly after all improvements.
doc_362651022.docx